05/07/2025
Spring brings construction. The latest install is for a hair salon/office building in Portland, MI I designed last year.
The system utilizes a Bio-Microbics High Strength Fast Aerobic System designed for high strength waste.
Professionally installed by Cook Brothers Excavating of Portland.