01/17/2024
Got this panel installed with all new switches for a customer today. Also replaced a bad radar, some lights, and VHF as well as pretty much a complete electrical systems check/overhaul. Ready early for 2024 boating season. Thanks to Carraway Custom Marine for getting the panel done with all the etching and the addition of the Edgewater logo.