Murphy Pipeline Contractors Murphy Pipeline Contractors is a utility contractor focused on trenchless technologies for the replacement of pressure pipeline systems.
(1)

Trenchless static pipe bursting, pre-chlorinated pipe bursting, slip lining and CompressionFit HDPE pipe lining method for water and sewer pipeline replacement. Established to bring the technologies of Europe to the United States, the main focus is on pre-chlorinated pipe bursting, slip lining and CompressionFit. Pre-chlorinated pipe bursting is ideal for 2-inch through 16-inch water distribution

replacement in residential neighborhoods and business districts. CompressionFit is an HDPE pipe lining method ideal for 16-inch through 78-inch water transmission and sewer force main replacement, and for 4-inch through 16-inch mining, oil and gas pipelines.

06/11/2026

Check out this latest trenchless installation showcasing DIP pipe bursting methodology in Fort Lauderdale, FL. Even in complex environments, we’re able to execute efficiently and safely.

Crossing existing utilities? No problem. Our team is equipped to handle challenging conditions while maintaining precision and minimizing disruption.

Owner: City of Fort Lauderdale
Engineer of Record: Calvin, Giordano & Associates, Inc.
Contractor: Murphy Pipeline Contractors

06/03/2026

26-inch CompressionFIT project for Colorado Springs Utilities; some in pit fusion!

2025 Rehab Project of the Year! Proud of our team at Murphy Pipeline Contractors!
05/14/2026

2025 Rehab Project of the Year! Proud of our team at Murphy Pipeline Contractors!

We're proud to share that a recent 42” Trenchless CompressionFit project completed by Murphy Pipeline Contractors for th...
05/05/2026

We're proud to share that a recent 42” Trenchless CompressionFit project completed by Murphy Pipeline Contractors for the City Waterbury, CT has been selected as the cover story for May's issue of Municipal Sewer & Water Magazine!

The project utilized DR 11 HDPE pipe delivering a 200psi pressure rating, while achieving over 90% less excavation compared to traditional open-cut methods.

https://loom.ly/3mvnM6g

Read the May 2026 issue featuring expert articles, product spotlights, and more.

Address

12235 New Berlin Road
Jacksonville, FL
32226

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm

Alerts

Be the first to know and let us send you an email when Murphy Pipeline Contractors posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share