GeoTech Foundation Company - West

Call Directions Website Contact the business

GeoTech Foundation Company - West Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from GeoTech Foundation Company - West, Engineering service, 214 SE Walnut Street, Hillsboro, OR.

Our company specializes in the design and construction of the GeoRam® Design Engineered Aggregate Pier and GeoBase® Dynamic Subgrade Improvement as well as the design and installation of CHANCE® Foundation Systems.

Supporting another Oregon school project from the ground up.GTFC-West recently completed ground improvement for the Dane...
10/06/2026

Supporting another Oregon school project from the ground up.

GTFC-West recently completed ground improvement for the Danebo Elementary School Addition in Eugene, Oregon, working with Pence Contractors.

Site explorations identified soft, undocumented fill soils overlying organic soils within the development area. These compressible materials presented the potential for structural settlement, making ground improvement an important part of the foundation design. Based on the subsurface conditions and anticipated structural loads, Engineered Aggregate Piers (EAPs) were selected to improve the existing soils and provide reliable foundation support for the new addition.

From Notice to Proceed to onsite in just 11 days!GTFC-West recently completed the installation of approximately 700 Engi...
10/05/2026

From Notice to Proceed to onsite in just 11 days!

GTFC-West recently completed the installation of approximately 700 Engineered Aggregate Piers (EAPs) for Headwaters Construction Company on the SLC Student Housing project in Salt Lake City, Utah.

This project moved on an exceptionally fast track and it’s a great example of the advantage of our turnkey, in-house design/build approach - allowing our engineering and field teams to move quickly when a project schedule demands it.

Thank you to Headwaters Construction for the opportunity to be part of this project.

Our team recently completed the installation of 2,500+ Engineered Aggregate Piers (EAPs) for Dick Anderson Construction ...
09/17/2026

Our team recently completed the installation of 2,500+ Engineered Aggregate Piers (EAPs) for Dick Anderson Construction on the new Helena High School project in Helena, Montana.

The subgrade conditions consisted of fill, silty sand, clayey sand, elastic silt, and fat clay, all with varying combinations of gravel and cobbles. Our team worked closely with Dick Anderson Construction to overcome hurdles with the site including in-place utilities, shallow groundwater, and large cobbles and boulders.

Even with difficult drilling at times, our team was able to install upwards of 150 piers per day, finishing the project on schedule and providing a uniform subgrade to receive foundations and floor slabs.

We look forward to more projects in beautiful Montana!

Another great year on the water!We had the pleasure of bringing a few clients on our annual fishing trip off the coast o...
08/28/2026

Another great year on the water!

We had the pleasure of bringing a few clients on our annual fishing trip off the coast of Washington. The group was able to bring home some pretty large king and coho salmon.

We’re grateful for the opportunity to spend time with great clients and make memories outside the office. Already looking forward to next year!

Another successful project wrapped up in San Antonio, Texas!We’re proud to have completed the installation of our Engine...
08/18/2026

Another successful project wrapped up in San Antonio, Texas!

We’re proud to have completed the installation of our Engineered Aggregate Pier (EAP) system for The Annex Group at the Central at Commerce project.

This project was originally designed with drilled piers. However, our team designed an EAP solution that provided a much more cost-effective foundation system while still meeting the project’s requirements.

This was a challenging site, requiring careful planning and ex*****on throughout our two mobilizations. Great work by the entire team and everyone involved in getting this project across the finish line!

Proud to have partnered with Essex General Construction, Inc. on a project in Albany, Oregon.Our Engineered Aggregate Pi...
08/14/2026

Proud to have partnered with Essex General Construction, Inc. on a project in Albany, Oregon.

Our Engineered Aggregate Pier system was designed to support some significant wall loads on this project (up to 23 kips per lineal foot) and our field team completed installation 33% ahead of schedule.

Even better than finishing early was the feedback we received from Essex’s Project Manager in our post-project survey:

“The GTFC-West team accommodated multiple design and schedule changes while remaining responsive and proactive at every step. It was genuinely a pleasure to work with your team.”

Great work by everyone involved, and a big thank you to the Essex team for the opportunity to partner on a successful project.

Our team was proud to provide the ground improvement for the new Park Place Porsche and Volvo dealerships in Dallas, Tex...
08/04/2026

Our team was proud to provide the ground improvement for the new Park Place Porsche and Volvo dealerships in Dallas, Texas.

Working alongside Brinkmann Constructors, we installed our Engineered Aggregate Pier (EAP) system to provide a strong, reliable foundation for these premier automotive facilities. Every successful project starts from the ground up, and we're honored to contribute to a project that will serve the Dallas community for years to come.

A big thank you to Brinkmann Constructors for the opportunity to be part of another outstanding project. We appreciate the partnership and look forward to working together again!

Our team recently completed the installation of Engineered Aggregate Piers (EAPs) for Jackson Contractor Group on the Li...
08/04/2026

Our team recently completed the installation of Engineered Aggregate Piers (EAPs) for Jackson Contractor Group on the Linda Vista Tank #2 in Missoula, Montana.

The site soils consist of clayey sand with varying gravel contents and sandy lean clay soils, which left un-improved would have likely resulted in unacceptable total and differential settlements.

EAPs are a great option to reduce settlements caused by deep stress influences that large structures, such as tanks, have on the subgrade soils. It’s always a pleasure to install piers in such beautiful country, and look forward to completing more projects with Jackson Contractor Group in Montana.

What an incredible project to be a part of with Vaughn Construction at the University of Houston!The new UH Innovation H...
07/27/2026

What an incredible project to be a part of with Vaughn Construction at the University of Houston!

The new UH Innovation Hub is designed to foster innovation, collaboration, and entrepreneurship. Each floor has a unique purpose - from makerspaces and collaborative work areas to the Wolff Center for Entrepreneurship, the Dakri Center for Economic Inclusion, the Energy Transition Institute, and cutting-edge research space for Presidential Frontier Faculty.

Our team installed 270 Engineered Aggregate Piers (EAPs) over two mobilizations to improve the existing fill left behind from a previous structure. Despite working around existing foundation remnants and navigating weather delays, our crew delivered the project on schedule.

We're proud to help provide the ground improvement that supports facilities where the next generation of innovators, entrepreneurs, and researchers will thrive.

We’re excited to continue expanding into the Southwest with the successful completion of the 5-story Pinal County Admini...
04/03/2026

We’re excited to continue expanding into the Southwest with the successful completion of the 5-story Pinal County Administration Building in Florence, Arizona, alongside FCI Constructors.

Engineered Aggregate Piers were selected as a value-driven alternative to removing and replacing the existing loose clayey sand, helping streamline both cost and schedule.

We completed our work 20% ahead of schedule, and we’re looking forward to building on this momentum with future projects across Arizona.

Address

214 SE Walnut Street
Hillsboro, OR
97123

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 9am - 5pm

Telephone

+15036401340

Alerts

Be the first to know and let us send you an email when GeoTech Foundation Company - West posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GeoTech Foundation Company - West:

Shortcuts

Share