GeoTech Foundation Company - West

GeoTech Foundation Company - West Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from GeoTech Foundation Company - West, Engineering service, 214 SE Walnut Street, Hillsboro, OR.

Our company specializes in the design and construction of the GeoRam® Design Engineered Aggregate Pier and GeoBase® Dynamic Subgrade Improvement as well as the design and installation of CHANCE® Foundation Systems.

We’re excited to continue expanding into the Southwest with the successful completion of the 5-story Pinal County Admini...
04/03/2026

We’re excited to continue expanding into the Southwest with the successful completion of the 5-story Pinal County Administration Building in Florence, Arizona, alongside FCI Constructors.

Engineered Aggregate Piers were selected as a value-driven alternative to removing and replacing the existing loose clayey sand, helping streamline both cost and schedule.

We completed our work 20% ahead of schedule, and we’re looking forward to building on this momentum with future projects across Arizona.

Earlier this year, our team completed the installation of both compression and tension (uplift) piers for the 7-story Wa...
04/02/2026

Earlier this year, our team completed the installation of both compression and tension (uplift) piers for the 7-story Washington Ave Parking Garage in Houston, TX in partnership with JLB Builders.

Engineered Aggregate Piers were selected as a value-driven solution to avoid the removal and replacement of undocumented fill, while increasing allowable bearing pressures for spread footings to 10,000 psf.

Another successful student housing project in Eugene, Oregon.This 15-story building was located on approximately 8 feet ...
03/06/2026

Another successful student housing project in Eugene, Oregon.

This 15-story building was located on approximately 8 feet of soft sandy silt. Our Engineered Aggregate Piers (EAPs) were selected as an alternative to removing and replacing the soft soils, while increasing the allowable bearing capacity to 8,000 psf for shallow foundations.

A great example of how ground improvement can turn challenging soil conditions into a reliable foundation for large vertical construction.

Our team recently completed the installation of Engineered Aggregate Piers (EAPs) for Bremik Construction on the 6-story...
03/05/2026

Our team recently completed the installation of Engineered Aggregate Piers (EAPs) for Bremik Construction on the 6-story Gresham Civic Station project in Gresham, Oregon.

The site included 6 feet of undocumented fill beneath finish floor. TheEAP system provided an efficient ground improvement solution by controlling differential settlement, increasing allowable bearing pressure to 5,000 psf, and avoiding the costly removal and replacement of the undocumented fill.

Proud of the team for delivering another reliable and cost-effective foundation solution.

We’re excited to be part of this landmark project in Portland, OR alongside Lease Crutcher Lewis.One of the former depar...
02/11/2026

We’re excited to be part of this landmark project in Portland, OR alongside Lease Crutcher Lewis.

One of the former department stores at the Lloyd Center is being transformed into a new mid-sized live music venue, and GTFC-West recently completed both compression and tension aggregate piers to support the new steel-framed structure.

Portland is known for its iconic small venues and the large Moda Center, but it’s long needed a high-quality mid-sized space for artists with a strong local following. We’re proud to help lay the foundation for what will become a key piece of the city’s music scene.

Employee Spotlight: Jeremy Olsen12 years of leadership, experience, and trust at GTFC-West...and counting!
02/06/2026

Employee Spotlight: Jeremy Olsen

12 years of leadership, experience, and trust at GTFC-West...and counting!

We’re proud to have partnered with Walsh Construction Co. on the Jamii Court Apartments project in Portland, Oregon.At G...
01/20/2026

We’re proud to have partnered with Walsh Construction Co. on the Jamii Court Apartments project in Portland, Oregon.

At GTFC, we take pride in maintaining a small-company feel where strong relationships, mutual respect, and professionalism truly make a difference on every jobsite.

Following project completion, the Walsh superintendent shared this feedback in our post-job survey:

“Professional, knowledgeable, hard-working, great attitudes - but most of all, GOOD PEOPLE. From top to bottom, great to work with and enjoyed you guys setting the tone early in the project.”

Feedback like this is why we do what we do. Grateful for the opportunity to work with a great team and contribute to another successful project.

Over the holidays, our team completed the Fairway Loop Bldg D project in Eugene, Oregon with John Hyland Construction.  ...
01/15/2026

Over the holidays, our team completed the Fairway Loop Bldg D project in Eugene, Oregon with John Hyland Construction. Built over variable soft silts and sands, this four-story mixed-use development benefited from our ground improvement which provided a uniform 5,000 psf bearing capacity.

We recently completed Engineered Aggregate Pier installation for Dawson Construction on the new City Hall project in Fer...
12/22/2025

We recently completed Engineered Aggregate Pier installation for Dawson Construction on the new City Hall project in Ferndale, Washington.

Due to high groundwater levels and sandier soils near the surface, this project required casing of the pier cavities, which necessitated a third excavator and careful coordination of multiple machines in a confined work area. We’re proud to have completed the project on schedule, with zero safety incidents.

We recently completed Engineered Aggregate Piers for a 7-story hotel/apartment project in Corvallis, OR with Gerding Bui...
12/17/2025

We recently completed Engineered Aggregate Piers for a 7-story hotel/apartment project in Corvallis, OR with Gerding Builders. Our ground improvement solution was selected to mitigate excessive consolidation within the upper 25 feet of silty clay while supporting column loads exceeding 500 kips.

We’re looking forward to returning to that area for two additional projects in Eugene in the coming month.

Our very own JC Donnelly, Estimator and Territory Manager for the Southern Region, jumped in on an awesome charity tradi...
12/08/2025

Our very own JC Donnelly, Estimator and Territory Manager for the Southern Region, jumped in on an awesome charity tradition that Tellepsen Builders in Houston has been hosting for the last 10 years - Bikes4Smiles!

They’re aiming to donate 1,500 bikes this year, and they’re so close - only a few more to hit the goal. We’ve included their poster if you’d like to join in and help spread some smiles this season. ❤️

Let’s help them finish strong! 💪🎄🚴‍♂️

Address

214 SE Walnut Street
Hillsboro, OR
97123

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 9am - 5pm

Telephone

+15036401340

Alerts

Be the first to know and let us send you an email when GeoTech Foundation Company - West posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GeoTech Foundation Company - West:

Share