IGM commercial fire and electrical systems

IGM commercial fire and electrical systems IGM Innovative Solutions was founded in 2013, we are a unique full service electrical service provider.

We provide commercial electrical, life safety systems, audio visual, and telecommunication services.

Project Update | MTA WCE Low Voltage Device Pathway Installation IGM Commercial Fire and Electrical Systems completed wi...
05/29/2026

Project Update | MTA WCE Low Voltage Device Pathway Installation

IGM Commercial Fire and Electrical Systems completed wire pulling operations from the manhole to the SCE panel, advancing the low-voltage communication pathway as part of ongoing system installation.

Work continues with precision, safety, and steady progress on-site.

Project Update | MTA WCE Low Voltage Device Pathway Installation IGM Commercial Fire and Electrical Systems set up the w...
05/28/2026

Project Update | MTA WCE Low Voltage Device Pathway Installation

IGM Commercial Fire and Electrical Systems set up the work station near Section 654 and continued pulling communication signal wire through designated manholes, successfully landing wire near the SSC. The team began the process of routing communication wire through the system in preparation for final connections.

Work is progressing in coordination with field requirements, with remaining scope to be completed once project print alignment is confirmed. The team remains focused on safe, accurate, and efficient ex*****on moving forward.

Project Update | 610 Professional Dr – Crown Pointe II MOB SummitIGM Commercial Fire and Electrical Systems conducted a ...
05/28/2026

Project Update | 610 Professional Dr – Crown Pointe II MOB Summit

IGM Commercial Fire and Electrical Systems conducted a site assessment above the ceiling to determine the best pathway for routing wiring from the electrical room to the roof.

Planning and layout coordination are underway to ensure an efficient and seamless installation process.

Project Update | 1441 Rhode Island Ave IGM Commercial Fire and Electrical Systems prepared and installed smoke and heat ...
05/27/2026

Project Update | 1441 Rhode Island Ave

IGM Commercial Fire and Electrical Systems prepared and installed smoke and heat detectors for the elevator shaft and pit. All devices in the elevator pit and shaft were installed, with elevator pit detectors correctly addressed. Elevator shaft heat and smoke detectors remain pending address configuration.

Smoke detectors were also installed at G1, G2, G3, and the 1st and 2nd floor elevator lobbies with proper addressing. Installation for floors 3–8 was not completed due to device availability and will resume once materials are restocked.

Work continues with focus on accuracy, compliance, and safe ex*****on.

Project Update | MTA WCE Low Voltage Device Pathway Installation IGM Commercial Fire and Electrical Systems continued wi...
05/27/2026

Project Update | MTA WCE Low Voltage Device Pathway Installation

IGM Commercial Fire and Electrical Systems continued wire routing operations by pulling cable from the manhole to the box and into the SCE, then extending the run to the next pull point to support system continuity.

Work is progressing with precision and steady coordination in the field.

Project Update | Purple Line: College Park IGM Commercial Fire and Electrical Systems progressed with PCC unit installat...
05/27/2026

Project Update | Purple Line: College Park

IGM Commercial Fire and Electrical Systems progressed with PCC unit installation by mounting support brackets using 3/8” bolts, compressor washers, 3/8” washers, and spring nuts. The team assisted in properly positioning PCC units to ensure correct alignment for communication and power connections.

Materials were also picked up from the supply shop to support continued work, and UPS systems were installed into the PCC units as part of the ongoing system setup.

Work is moving forward with safe, accurate, and coordinated field ex*****on.

Project Update | MTA WCE Low Voltage Device Pathway Installation IGM Commercial Fire and Electrical Systems progressed w...
05/26/2026

Project Update | MTA WCE Low Voltage Device Pathway Installation

IGM Commercial Fire and Electrical Systems progressed with low-voltage pathway work across multiple sections. The team entered the manhole and fed wire across the tracks into the shed, then set up a workstation near Section 604. Communication signal wire was pulled through the provided manhole and terminated in the communication center housing unit.

At Section 654, the team inspected the area and set up the manhole pull station. Additional 10-gauge wire was retrieved from the parking lot, and wire pulling operations continued through the installed manholes.

Work is ongoing with strict safety compliance and coordinated field ex*****on.

May is National Building Safety Month Safe buildings start with strong systems. National Building Safety Month is a remi...
05/26/2026

May is National Building Safety Month

Safe buildings start with strong systems. National Building Safety Month is a reminder of the importance of maintaining code-compliant structures that protect occupants and support daily operations.

At IGM Commercial Fire & Electrical Systems, we play a critical role in building safety, from fire alarm systems and electrical infrastructure to inspections, upgrades, and ongoing maintenance. Every installation is completed with precision to ensure reliability when it matters most.

Because safety isn’t just built once, it’s maintained every day.

Project Update | MTA WCE Low Voltage Device Pathway Installation IGM Commercial Fire and Electrical Systems completed a ...
05/25/2026

Project Update | MTA WCE Low Voltage Device Pathway Installation

IGM Commercial Fire and Electrical Systems completed a safety briefing and proceeded with installation work at Section 604. The team set up near the SSC, pulled communication signal wire, installed camera brackets using a bucket truck, and completed a 1” power access hole for the camera installation.

Work continues with safety, accuracy, and coordination on-site.

Memorial DayToday, we honor and remember the brave men and women who made the ultimate sacrifice in service to our count...
05/25/2026

Memorial Day

Today, we honor and remember the brave men and women who made the ultimate sacrifice in service to our country. Their courage, dedication, and selflessness will never be forgotten.

At IGM Commercial Fire & Electrical Systems, we take a moment to reflect with gratitude and respect for those who gave everything for the freedoms we have today.

We remember. We honor. We thank you.

"May is Mental Health Awareness Month Taking care of your mental health is just as important as physical safety, on and ...
05/25/2026

"May is Mental Health Awareness Month

Taking care of your mental health is just as important as physical safety, on and off the job.

At IGM Commercial Fire & Electrical Systems, we recognize the importance of creating a work environment where people feel supported, respected, and heard. Long hours, demanding projects, and high-pressure environments make it essential to check in, not just on the work, but on each other.

Let’s continue to break the stigma, encourage open conversations, and support one another every day.

Stronger teams start with healthy minds. "

Address

201 Prospect Avenue #225
Hagerstown, MD
21742

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+12402929189

Alerts

Be the first to know and let us send you an email when IGM commercial fire and electrical systems posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to IGM commercial fire and electrical systems:

Share