Qnect Qnect partners with structural design teams to create Early Connected Steel Models. Qnect is aiming high.

Our vision is to become the single source of quality automated connection engineering worldwide. We strive for excellence in engineering and excellence in organizational efficiency. We operate in a respectful work space that truly appreciates every human involved in our projects. We also consider impacts to the micro and macro communities we live in to be equally important measures of success.

This Labor Day, we're thinking about the engineers, detailers, fabricators, and ironworkers who turn a design intent int...
09/07/2026

This Labor Day, we're thinking about the engineers, detailers, fabricators, and ironworkers who turn a design intent into a building that stands.

Our work exists to support that expertise, not replace it: better information earlier, so the people doing the work can do it with fewer surprises.

Mass General Hospital Phase 1, as it stands today — connected and optimized by Qnect. Hospital projects carry tight time...
09/04/2026

Mass General Hospital Phase 1, as it stands today — connected and optimized by Qnect.

Hospital projects carry tight timelines and tighter budgets. We love saving money on construction so more patients can be served sooner! Phase 2 is already underway, more to come as it progresses.

08/21/2026

Engineers of record: the Early Connected Model isn’t more work for you. It’s fewer fights later.

The biggest hidden cost in a structural practice isn’t design, it’s shop-drawing review. The endless re-review loop, the RFIs, the back-and-forth that erodes margin and reputation. Resolving connections early collapses that loop. When the model is connected up front, you’re reviewing a coherent design once — not chasing rejections through a stack of shop drawings.

Thanks to Erleen Hatfield, President of Hatfield Group, for sharing her experience using Qnect's early connected models.

08/17/2026

When does steel get “locked” on your projects?

Some teams commit at 30% design development. Some wait for the fabricator. Some are forced early by mill-order lead times before anyone’s ready.

There’s no universally right answer — but the timing quietly decides how much room you have to optimize, value-engineer, or catch a problem.

Where does your team draw that line, and what’s pushing it earlier or later these days?

08/13/2026

Time is one of the most valuable resources on any project—and Qnect helps building owners make more of it.

In this clip from Beyond the Blueprint, Michael Gustafson explores with host Jeff O’Donnell how Qnect’s connected model approach brings steel connection design into the process earlier, helping teams identify and resolve issues sooner rather than later. The result? Less rework, faster schedules, and better cost certainty.

VDC and innovation leaders: ECM is the rare “innovation” that’s actually practical.You’ve seen the shiny demos that neve...
08/11/2026

VDC and innovation leaders: ECM is the rare “innovation” that’s actually practical.

You’ve seen the shiny demos that never touch a real project. The thing operations and preconstruction quietly ignore.

An Early Connected Model is the opposite. It connects model intelligence directly to the outcomes your operators already care about — cost, schedule, and fabrication readiness. No new religion required.

And it’s where AI earns its keep in steel. Not replacing engineers — running thousands of connection scenarios no human could evaluate by hand, then handing the engineer a recommendation to accept or override.

That’s the version of innovation that survives contact with a job site: it makes the people already doing the work faster and sharper, instead of asking them to start over.

We're honored to be featured in the August issue of Modern Steel Construction! Read the full article here: https://lnkd....
08/05/2026

We're honored to be featured in the August issue of Modern Steel Construction! Read the full article here: https://lnkd.in/eWQ55GAD

At Qnect, we believe the future of structural engineering is informed by better data. By giving engineers the tools to evaluate cost and carbon side by side, we can make sustainability a measurable part of every design decision—not an afterthought.

One passage from the article captures why this work matters:

"Structural engineers can make a greater impact on global carbon emissions than the average citizen. Steel and concrete—two materials they use in design—account for about 15% of worldwide global warming potential (GWP)... Optimizing structural designs by even a small margin would lead to a notable impact on GWP reduction."

Thank you to Modern Steel Construction and American Institute of Steel Construction for featuring our work. Together, we're helping engineers build a more sustainable future. Visit https://lnkd.in/e6iknjWz to learn more.

business issues Cost-Carbon Collision BY MICHAEL GUSTAFSON, PE A two-year research project delved into finding a balance of specifying materials for cost and embodied carbon impact. WHEN CONSIDERING sustainable design strategies, embodied carbon reduc-tion is often the top priority. Choosing do-mest...

Inspiring Insights from Advancing Construction Decarbonization! | Day 1What an incredible time connecting with industry ...
08/03/2026

Inspiring Insights from Advancing Construction Decarbonization! | Day 1
What an incredible time connecting with industry leaders at the Advancing Construction Decarbonization conference in Denver! The presentations were packed with actionable strategies for building a more sustainable future.

Here are a few major takeaways from the sessions:

Scope 3 Data: Atkinson provided a deep dive into strengthening Scope 3 data collection, emphasizing the need to distill true material emissions so contractors can rely on accurate and usable reporting.

Net Zero Business Value: Callahan delivered an excellent presentation on unlocking business value through decarbonization, detailing how to prioritize investments and interpret market drivers on the path to Net Zero.

Owner Ambitions vs. Reality: The insightful panel—featuring Hamilton, Poole, Baker, Yamasaki, and Brock—tackled the critical challenge of bridging owner sustainability ambitions with practical construction realities and fossil-fuel-dependent equipment constraints.

Steel Decarbonization At Qnect, we are deeply proud and passionate about reducing embodied carbon in steel. We are fully committed to driving sustainable outcomes through !

(Check out the photos below of Amanda, Kate, and our fantastic panelists in action! 📸)

07/24/2026

Spend cents on steel connection optimization—save dollars across your entire steel package.

Discover how the Early Connected Model protects up to ~10% of your steel budget and prevents critical-path delays before fabrication even begins.

Contact Qnect to learn more.

Address

245 Russell Street
Hadley, MA
01035

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

(413) 387-4375

Alerts

Be the first to know and let us send you an email when Qnect posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share