05/14/2026
Another drainage plan with hydrology report showing impervious is less than pre-fire in Altadena using satellite tracing.
A drainage plan and hydrology report for an Altadena fire rebuild where the site slopes 11 feet from street to rear. We designed flowlines around the main house and proposed ADU, added plastic lined rain gardens on both sides, and used the hydrology report to show pre-fire impervious was greater tha...