ASAP Concrete Solutions LLC Retired USAF Redhorse, concrete contractor since 2003

Did a little entranceway the other morning down the road from the house. It turned out really nice!
12/17/2025

Did a little entranceway the other morning down the road from the house. It turned out really nice!

11/27/2025

Happy Thanksgiving!!!

The big barn concrete project is getting buttoned up today.
11/13/2025

The big barn concrete project is getting buttoned up today.

Another pour for the books and another on the way. This job has had its challenges but we still manage to make it happen...
11/06/2025

Another pour for the books and another on the way. This job has had its challenges but we still manage to make it happen!

The next session of barn concrete pours start now! This one is going to be an interesting one due to some existing concr...
10/30/2025

The next session of barn concrete pours start now! This one is going to be an interesting one due to some existing concrete that’s been poured above where we were originally going to pour to. Saw cutting and jack hammering are in my future. Shout out to Scott for the assistance this morning.

10/19/2025

First hand accounts with a good storm to test the drain installation we put in last week. Have the vision and wait to see the results for verification. Looks like the vision for drain idea paid off!

Phase 3 completed!
10/19/2025

Phase 3 completed!

Last phase of this pole barn project. Ramos and filling the open space in. Tomorrow will be saw cutting expansion joints...
10/16/2025

Last phase of this pole barn project. Ramos and filling the open space in. Tomorrow will be saw cutting expansion joints day.

140’ French drain with (2) 12”x12” basin drains, 9”x9” low profile drain and 4” pop up emitter.
10/15/2025

140’ French drain with (2) 12”x12” basin drains, 9”x9” low profile drain and 4” pop up emitter.

Phase 2 complete with another 2 full sections of concrete being poured today and just one more full section coming up ne...
10/10/2025

Phase 2 complete with another 2 full sections of concrete being poured today and just one more full section coming up next week, followed by some ramps spanning the entire width on the lean too side. There will also be two 12”x12” drain basins in series with a perforated 4”pipe in between to help mitigate the rush of water that flows down the steep section of property alongside the barn area. These drains will be connected with a solid corrugated pipe that spans the length of the barn and extends an extra 20’ past and terminates out past the tree line. The termination will have a 4” pop up emitter. This job is coming along nicely.

Prep work for phase 2 concrete pour tomorrow. 4’x4’ deer processing area with drain and fab’d up a new water line for a ...
10/09/2025

Prep work for phase 2 concrete pour tomorrow. 4’x4’ deer processing area with drain and fab’d up a new water line for a future project at the phase 4 project barn. The next two photos are of the profile we cast into the concrete for a mechanical joint for future connecting concrete pads.

Phase 1 or 3 complete!
10/08/2025

Phase 1 or 3 complete!

Address

130 Pamela Ann Drive
Fort Walton Beach, FL
32547

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Telephone

+18502171081

Website

Alerts

Be the first to know and let us send you an email when ASAP Concrete Solutions LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to ASAP Concrete Solutions LLC:

Share