09/30/2025
Recent installation for the Gurus team. Significant upgrades are forthcoming for one of our clients that was prepared for phase 2 expansion, which we strategically planned last year. An additional 29 drops were integrated, and the grid now spans the entire original loop, incorporating five mini loops. Notably, this leveling project presented challenges due to the multi-pitch roof. The client is now ready to prepare or relocate work stations almost anywhere in the facility.