05/28/2026
"It doesn't leave our floor until it's perfect."
That isn't just a slogan; it’s our standard operating procedure. Before any control panel is packed for shipping, it undergoes a rigorous series of checks. This includes thorough point-to-point testing and air pressure checks for pneumatic systems to ensure every connection is secure and every circuit functions exactly as intended.
Our goal is a "Clean Commissioning." We want your setup process to be so smooth that you forget we were even there. When you receive a build from Simplex.
Ready to start your next custom build? Let’s get to work: https://simplexsystemcontrols.com/contact/