05/13/2026
๐ชง ๐จ Not every warehouse project takes the form of a large automation overhaul.
For Bogg Bagโs NJ facility, CHC recommended a more organized bulk storage environment through a cost-effective striping and signage solution.
The project included 8,000 linear feet of industrial-grade floor striping, overhead barcode/SKU signage, and clearly defined pallet lanes, aisles, and storage zones, resulting in 5,585 total pallet positions.
The result: faster putaway, easier retrieval, fewer misplaced pallets, improved traffic flow, and better use of floor space.
CHC has the experience to deliver large-scale automated material handling and storage solutions, but that doesn't mean our capabilities stop there. Each and every project varies greatly, and this project is an example of how CHC can scale to your specifications and deliver a solution that remains cost-effective yet provides significant efficiency benefits.
Read the full case study here:
๐
Optimizing facility space and product movement by creating 5,500+ pallet positions with a cost-effective and simple striping and signage integration