01/03/2024
Our 2024 Erickson Engineering calendars have been sent out.
If you are not on our mailing list and would like one, or if you want additional copies, let us know. http://www.ericksonengineering.com/contact-us/
Bridges in the 2024 calendar include:
St. Louis County Bridge 69A77 on CSAH 59
Faribault County Bridge 22627 on 165th St
Cook County Bridge 16524 on UT 46
Meadows at Mystic Lake Pedestrian Bridge
Isanti County Bridge 30520 on CSAH 14 (cover)
Winona County Bridge 85579 on CSAH 7
Mower County Bridge 50601 on CSAH 46
Pipestone County Bridge 59547 on CSAH 2
Aitkin County Bridge 01534 on CR 62
Fillmore County Bridge 23602 on Morgan Rd
City of Eagan Pedestrian Bridge
Koochiching County Bridge 36532 on CR 99