IDEAL Group

IDEAL Group IDEAL Group is a family-owned and operated manufacturer and distributor of American-made deep founda

DOWNTIME.This word has the ability to make anyone working in the Industrial sector flinch.Helical piles can help you tac...
02/22/2024

DOWNTIME.

This word has the ability to make anyone working in the Industrial sector flinch.

Helical piles can help you tackle industrial projects unflinchingly.

They can be installed and mobilized in less time than traditional foundation types.

They can be installed near machinery and inside existing facilities with minimal disruption, mess, damage, and vibrations.

They can be installed on sites with space restrictions with little reduction in efficiency.

Check out our case studies on industrial projects to learn more about how helical piles can minimize downtime:
https://pulse.ly/ufn3f5e3ix

Photo Credit: Brokk/Drilling Service Co.

02/20/2024

California’s continued investment in wind energy adds momentum to the USA’s transition to a cleaner, more sustainable future. Drilled-In Displacement Piles (DDM) are playing a key role in supporting this transition, due to their ability to resist significant compression, tension, and lateral loads while also reducing the foundation's carbon footprint.

Watch as are installed for a wind turbine foundation in sunny Cali ☀️

Learn more: https://pulse.ly/it7anm6tz8

Another successful   installation as we touched down at JFK Airport ✈️This time around, we had the opportunity to work w...
02/17/2024

Another successful installation as we touched down at JFK Airport ✈️

This time around, we had the opportunity to work with ARUP and Urban Foundation to provide a deep foundation solution for a low overhead portion of the expansion of the terminal 4 headhouse. The $1.5 billion transformation allowed Delta airlines to consolidate its operations into one terminal while also updating and expanding its current facilities.

Learn more about the role played in this project: https://pulse.ly/milej5jx4r

02/15/2024

A rewind to 2019, when this 8-story building in NYC’s East Village was a work in progress ⏪

Limited access and a virtually nonexistent product staging area were just some of the challenges on this site. See how got to work in this project throwback 🎥

Contact us now to discuss your next project: https://pulse.ly/b6s5gcfhvb

Need to know which   shaft diameter meets your load requirements?Our Helical Pile Selection Guide is available to downlo...
02/09/2024

Need to know which shaft diameter meets your load requirements?

Our Helical Pile Selection Guide is available to download, greatly simplifying the selection process for engineers and contractors alike.

Get yours👉 https://pulse.ly/5idwlug7ye

As we progress into the new year, we’re inviting our followers to enhance their knowledge of   and other   by enrolling ...
02/07/2024

As we progress into the new year, we’re inviting our followers to enhance their knowledge of and other by enrolling in a Lunch & Learn session with the experts at .

Learn about soil profiles in which the DDM’s often excel, how to decide whether or not DDMs are a good fit for a particular project, and more. You will also earn PDH credits for attending.

Book now: https://bit.ly/4bqLzxX

If you’re facing tight access, high-water tables, or contamination on your   project, we have a superior deep foundation...
02/05/2024

If you’re facing tight access, high-water tables, or contamination on your project, we have a superior deep foundation solution. is the solution you need to achieve the best results even in the most challenging environments.

Visit now to find out everything you need to know about STELCOR and request cut sheets, specification documents & more: https://bit.ly/4boWgRC

Need a complete drive head installation package?Here at  , we sweat the details so your project can hit the ground runni...
01/19/2024

Need a complete drive head installation package?

Here at , we sweat the details so your project can hit the ground running. Our drive head packages are amongst the most comprehensive on the market so that you are fully prepared when faced with a installation.

Take a look at what’s inside: https://pulse.ly/lmyvzowyci

With   being installed in an existing   subway station, limited access presented a significant challenge in this project...
01/15/2024

With being installed in an existing subway station, limited access presented a significant challenge in this project at Exchange Place.

Our project snapshots below demonstrate just some of the challenges faced when installing in metropolitan areas. Read the case study here: https://pulse.ly/udxg78srj6

Project Installer: Skanska

Thanks to our Operations Manager, Cindy Balch, for organizing a food and toy drive and to our awesome team for their giv...
12/26/2023

Thanks to our Operations Manager, Cindy Balch, for organizing a food and toy drive and to our awesome team for their giving.

Our donations to the Webster Community Chest and the Pirate Toy Fund will help feed families in need and bring a little joy into the holidays for children in need. It was great to see the team come together to support the causes and give back to the community.

Address

80 Bluff Drive
East Rochester, NY

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5am
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when IDEAL Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share