10/22/2026
🏗️ Deep foundations for marine infrastructure.
At the Manzanillo Gas and Power – Marine Terminal EPC project, open-ended steel pipe piles ranging from 36 to 52 inches in diameter and 200 to 300 feet in length are being driven as part of the terminal’s construction.
The marine terminal includes an offloading platform with permanently berthed FRU and FSU vessels for offshore storage and regasification.
An impressive look at the scale of foundation work supporting this marine infrastructure project.