09/03/2026
Permits stall good projects when packets miss basics. Core lesson: center the packet on engineered plans and a clear site plan, not a generic kit drawing.
Dallas requires PE-sealed foundation/structural plans and a site plan for commercial new construction; Dallas and many North Central Texas cities operate under 2021 ICC codes with local amendments. TBPELS rules govern sealing procedures for Texas engineers. Expect site plan review per Dallas Code 51A-4.803/13.703.
Quick checklist:
- Ask your slab engineer about sealing requirements for your jurisdiction.
- Confirm site plan scale, north arrow, and utility notes match submittal format.
- Keep contractor, parcel, and address info consistent across sheets.
DM PERMIT PACKET for our one-page submittal index and a quick pre-check on your drawings.