Encore Land and Sea

Encore Land and Sea Superior Lightning Protection for Commercial, Industrial, Residential, & Marine. CMCE Suppression creates a dome of lightning-free protection.

Stop Lightning Now. Request a Custom Quote or take our FREE Lightning Risk Assessment.

One city. Nine critical municipal properties. One advanced lightning protection strategy.The City of Panama City, Florid...
09/04/2026

One city. Nine critical municipal properties. One advanced lightning protection strategy.

The City of Panama City, Florida relies on CMCE Lightning Suppression to protect essential infrastructure across the community—including City Hall, the Police Department, Fire Station 1, Bay County EMS Station #15, two wastewater treatment plants, St. Andrews Marina, a municipal storage facility, and the city water tower.

With nine CMCE-120 Lightning Suppressors installed across these critical locations, Panama City has created a coordinated approach to eliminating the risk of direct lightning strikes, equipment damage, service interruptions, and costly downtime.

From emergency response and public safety to water, wastewater, and waterfront operations, CMCE protects the infrastructure residents depend on every day.

Read the full case study to see how Panama City strengthened critical infrastructure with CMCE Lightning Suppression.
https://www.encorelandandsea.com/case-studies

(888) 360-7786
[email protected]
www.encorelandandsea.com

Protect the stack. Protect the plant. Protect uptime.Stacks are often among the tallest and most exposed structures at a...
09/04/2026

Protect the stack. Protect the plant. Protect uptime.

Stacks are often among the tallest and most exposed structures at a power generation facility—making them especially vulnerable to direct lightning strikes.

At the Dearborn Central Energy Plant in Dearborn, Michigan, CMCE Lightning Suppression protects critical infrastructure supporting Ford Motor Company’s Research and Engineering Campus. The 100,000-square-foot facility generates electricity and distributes steam, hot water, and chilled water throughout the campus.

Installed on elevated structures such as stacks, CMCE Lightning Suppression continuously works to prevent lightning strike formation within the protected area, eliminating the risk of lightning-related equipment damage, operational disruption, and costly downtime.

For power generation facilities where reliability is essential, lightning protection shouldn’t just manage a strike—it should prevent it from forming.

Protect critical stacks and infrastructure with CMCE Lightning Suppression.

(888) 360-7786
[email protected]
www.encorelandandsea.com

Power generation technology has evolved. Has your lightning protection strategy?Many power generation facilities still r...
09/02/2026

Power generation technology has evolved. Has your lightning protection strategy?

Many power generation facilities still rely on traditional lightning rods designed to accept and conduct a strike. But when uptime, sensitive electrical systems, and critical infrastructure are on the line, simply managing a lightning strike may not be enough.

CMCE Lightning Suppression takes a modern, preventative approach—designed to prevent lightning strike formation within the protected area instead of providing lightning with an attachment point.

For power plants and generation facilities, that means a smarter approach to protecting equipment, operations, and uptime.

- Modern technology
- Broad-area protection
- Less infrastructure
- Prevent lightning strike formation

Is it time to upgrade your lightning protection strategy?

Read the full blog to learn why power generation facilities are rethinking traditional lightning protection and turning to CMCE Lightning Suppression.
https://www.encorelandandsea.com/updating-lightning-protection-with-modern-technology-prevents-lightning-formation

(888) 360-7786
[email protected]
www.encorelandandsea.com

800 feet of lightning protection from a single system.One CMCE-120 Lightning Suppressor provides an 800-foot diameter of...
09/01/2026

800 feet of lightning protection from a single system.

One CMCE-120 Lightning Suppressor provides an 800-foot diameter of coverage, creating a protective dome designed to prevent lightning strike formation within the protected area.

For power generation facilities, energy plants, substations, utilities, and critical electrical infrastructure, that broad coverage can help protect more than just a single structure. It can help safeguard critical equipment, outdoor assets, electrical systems, and surrounding operational areas—all with one advanced lightning suppression system.

Unlike conventional lightning rods that are designed to receive lightning strikes, CMCE Lightning Suppression continuously works to prevent strike formation within its protection zone.

For facilities where uptime, reliability, and continuous power generation are essential, protection should cover more.

One CMCE-120. An 800-foot diameter. Advanced lightning protection built for critical infrastructure of all sizes.

(888) 360-7786
[email protected]
www.encorelandandsea.com

Amazon’s 1-million-square-foot fulfillment center in Greenfield, Indiana needed a lightning protection solution built fo...
08/27/2026

Amazon’s 1-million-square-foot fulfillment center in Greenfield, Indiana needed a lightning protection solution built for the scale of a modern warehouse operation.

Encore Land and Sea installed 8 CMCE-120 Lightning Suppressors around the warehouse perimeter, providing broad protection across the facility and surrounding property with over 2 million square feet of combined coverage.

The completed system uses less than 500 feet of wire, was installed in approximately four workdays, and is delivering nearly $2 million in estimated savings compared with a traditional lightning rod design.

It’s a powerful example of how CMCE Lightning Suppression can provide large industrial facilities with a more advanced, scalable, and streamlined approach to lightning protection.

See how this large-scale installation came together—and why CMCE was selected over traditional lightning rods. Read the full case study to learn more: https://www.encorelandandsea.com/case-studies

(888) 360-7786
[email protected]
www.encorelandandsea.com

More square footage shouldn’t mean spending millions more in lightning protection.For large warehouses, manufacturing fa...
08/26/2026

More square footage shouldn’t mean spending millions more in lightning protection.

For large warehouses, manufacturing facilities, fulfillment centers, and distribution centers, traditional lightning rod systems can become increasingly expensive as the footprint grows—averaging around $2 per square foot.

CMCE Lightning Suppression offers a smarter approach.

- Significantly lower potential installation costs
- Broad protection with less rooftop infrastructure
- Advanced technology designed to prevent lightning strike formation
- Ideal for large, high-value industrial facilities where uptime matters

A 1-million-square-foot warehouse could face approximately $2 million in traditional lightning protection costs—while CMCE can cost less than half of that.

Protect more. Spend less. And upgrade to a more advanced approach to lightning protection.

Read the full article to see how CMCE changes the cost equation for large manufacturing facilities and warehouses.
https://www.encorelandandsea.com/more-square-footage-spending-millions-more-in-lightning-protection

(888) 360-7786
[email protected]
www.encorelandandsea.com

For warehouses, larger square footage can mean a much larger lightning protection bill.Traditional lightning rod systems...
08/25/2026

For warehouses, larger square footage can mean a much larger lightning protection bill.

Traditional lightning rod systems can cost around $2 per square foot. For a 1,000,000-square-foot warehouse, that can mean roughly $2 million in rods, conductors, grounding components, rooftop penetrations, and installation.

CMCE Lightning Suppression: approximately $0.04 per square foot.

- Lightning Rods: $2.00/sq. ft.
- CMCE Lightning Suppression: $0.04/sq. ft.

But CMCE isn’t just more affordable—it’s also a more advanced and effective approach to lightning protection.

Traditional rods are designed to receive a lightning strike and conduct the energy to ground. CMCE is designed to prevent lightning strike formation within its coverage area, eliminating the threat before damage can occur.

For large warehouses and distribution facilities, that means:

• Significantly lower installation costs
• Far fewer components
• Simpler installation
• More advanced lightning protection technology
• Potential savings of millions of dollars

Why pay more for an older approach when you can spend less for more advanced protection?

Protect more. Spend less. Upgrade to CMCE Lightning Suppression.

(888) 360-7786
[email protected]
www.encorelandandsea.com

How vulnerable is your property to lightning?You may know lightning is a risk—but do you know how exposed your specific ...
08/21/2026

How vulnerable is your property to lightning?

You may know lightning is a risk—but do you know how exposed your specific property really is?

Encore Land and Sea’s FREE Property Lightning Risk Assessment gives you a personalized look at your property’s relative lightning exposure based on its unique characteristics.

In less than 2 minutes, you’ll receive:

✓ 6 simple questions
✓ Instant lightning exposure score from 0–100
✓ Written analysis of your top risk drivers
✓ Insights based on your property’s unique characteristics
✓ Results in under 2 minutes
✓ No account required

Whether you manage an industrial facility, commercial property, critical infrastructure site, marina, multifamily community, or other high-value property, understanding your exposure is the first step toward reducing lightning-related risk.

Know your risk before the next storm arrives.

Take the FREE Property Lightning Risk Assessment today and get your personalized score in minutes.

https://www.encorelandandsea.com/lightning-risk-assessment

(888) 360-7786
[email protected]
www.encorelandandsea.com

Upgrading from traditional lightning rods to a smarter approach to lightning protection.Cypress Creek Tri-Rail Station i...
08/20/2026

Upgrading from traditional lightning rods to a smarter approach to lightning protection.

Cypress Creek Tri-Rail Station in Fort Lauderdale, Florida upgraded its existing lightning rod system to CMCE Lightning Suppression to better protect critical transportation infrastructure in one of the country’s most lightning-prone regions.

Encore Land and Sea installed one CMCE-120 Lightning Suppressor on the station roof, providing a 393-foot protection radius and approximately 500,000 square feet of coverage.

The system helps protect the station, passengers, electrical infrastructure, communications, ticketing, lighting, and other essential systems that support reliable daily operations.

For public transportation, resilience matters. CMCE provides a proactive approach designed to eliminate the threat of direct lightning strikes before they can disrupt operations.

Read the full case study to see why Cypress Creek Tri-Rail Station upgraded from traditional lightning rods to CMCE Lightning Suppression: https://www.encorelandandsea.com/case-studies

(888) 360-7786
[email protected]
www.encorelandandsea.com

What does lightning protection look like on a 1-million-square-foot Amazon facility?Encore Land and Sea is currently ins...
08/19/2026

What does lightning protection look like on a 1-million-square-foot Amazon facility?

Encore Land and Sea is currently installing 9 CMCE-120 Lightning Suppressors on Amazon’s Greenfield, Indiana fulfillment facility—creating over 1 million square feet of protected coverage.

But the scale of protection is only part of the story.

Compared with the traditional lightning rod design considered for the facility, the CMCE solution is projected to save Amazon nearly $2 million—while requiring less than 500 feet of wire and just nine strategically placed suppressors.

And installation is moving fast: 2 CMCE systems were installed on Day 1, with the full project anticipated to take approximately 4 workdays.

From a successful CMCE installation at Sherwin-Williams to a recommendation for Amazon, this project offers an inside look at how major industrial facilities are approaching lightning protection differently.

Read the full blog for an inside look at the installation process, system design, traditional lightning rod comparison, and why CMCE makes such a significant difference at this scale.

https://www.encorelandandsea.com/inside-a-cmce-installation-amazons-greenfield-indiana-facility

(888) 360-7786
[email protected]
www.encorelandandsea.com

Address

3821 Millsbrae Avenue
Plainfield, IN
45209

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+13178395022

Alerts

Be the first to know and let us send you an email when Encore Land and Sea posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share