EFI-Solutions, Inc. EFI-Solutions, Inc. is the Industry Leader in custom-engineered, prefabricated, water system solutions.

Moving millions of gallons of water uphill is a difficult challenge. Managing it safely on the way back down is another....
08/13/2026

Moving millions of gallons of water uphill is a difficult challenge. Managing it safely on the way back down is another.

At the Hilltop Energy Center, we engineered, manufactured, delivered, and installed both sides of the cooling-water system: a high-capacity booster pump station to move massive volumes of water uphill and a custom below-grade PRV station to control pressure on the return.

Designed for a 30-year operational life cycle and up to 260 thermal cycles annually, the system was built to meet the long-term demands of continuous power generation.

Click here to learn more about this project:
https://www.efi-solutions.com/hill-top-energy-center

Last week, alongside our partners at Engineered Solutions Midwest, Inc. and U.S. Controls inc., we had the opportunity t...
08/11/2026

Last week, alongside our partners at Engineered Solutions Midwest, Inc. and U.S. Controls inc., we had the opportunity to present to the Mayor of Lewistown, Illinois, and members of the city’s utility team.

We discussed our capabilities and spent time reviewing the city’s recently purchased EFI booster pump station and utility-wide SCADA system, including how the equipment and controls will work together to support day-to-day operation.

Thank you to the City of Lewistown for having us and for the opportunity to share information and answer questions.

Even after thousands of completed projects, it is still mesmerizing to watch raw materials become something of this magn...
08/06/2026

Even after thousands of completed projects, it is still mesmerizing to watch raw materials become something of this magnitude.

Every cut, weld, and connection brings the project one step closer to becoming a finished system built to serve a community for the next several decades and beyond.

These behind-the-scenes moments are a reminder that long-term infrastructure begins with skilled hands, quality materials, and pride in the work.

08/05/2026

As it turns out, putting our staff in front of a camera and asking them to “act natural” works flawlessly every time.

Here is the footage to prove it.

Here is a little behind-the-scenes look at the installation of our Rye Lake project from a few years ago.This modular fa...
08/04/2026

Here is a little behind-the-scenes look at the installation of our Rye Lake project from a few years ago.

This modular facility was delivered in multiple sections and assembled on site around the project’s advanced UV disinfection equipment.

The finished system supports reliable disinfection of the Rye Lake water supply while helping protect long-term water quality and public health.

Learn more about the project:
https://www.efi-solutions.com/rye-lake

A GIANT has appeared on our production lot this afternoon 👀 and this is just the first piece of the puzzle. When fully a...
07/30/2026

A GIANT has appeared on our production lot this afternoon 👀 and this is just the first piece of the puzzle.

When fully assembled, this project will have a footprint measuring approximately 76' x 58'. Projects like this continue to push the boundaries of what factory-built water infrastructure can look like, and we’re proud to lead the industry forward.

We’re headed to Houston! ✈️ EFI is excited to join the American Data Centers Construction Forum this October and be part...
07/29/2026

We’re headed to Houston! ✈️

EFI is excited to join the American Data Centers Construction Forum this October and be part of the conversation around the future of U.S. data center infrastructure.

As data center development continues to accelerate, factory-built water systems can play an important role in helping these projects move faster and reduce on-site construction.

At approximately 38 feet long, this station brings together the capacity, equipment, and access needed to support a majo...
07/28/2026

At approximately 38 feet long, this station brings together the capacity, equipment, and access needed to support a major water system for years to come. It is a strong example of how thoughtful design can support both immediate performance and long-term operation.

07/23/2026

Data centers have been at the center of major conversations lately, but one thing is clear: these projects are not slowing down.

That makes it our responsibility to engineer the supporting infrastructure more efficiently and reduce its environmental footprint wherever possible.

Our factory-built water systems are designed to make better use of materials, power, and water while minimizing on-site construction and disturbance. With piping, electrical systems, controls, and equipment installed and tested before delivery, some stations can be set and connected in a single day.

As data center development continues, EFI is helping build the reliable, scalable, and responsible water infrastructure needed to support it.

We are set up and ready to go at the Clean Water Professionals of Kentucky & Tennessee Water Professionals Conference (W...
07/20/2026

We are set up and ready to go at the Clean Water Professionals of Kentucky & Tennessee Water Professionals Conference (WPC) in Lexington KY.

Stop by Booth 604 today and tomorrow to meet the team. We look forward to connecting with everyone!

Address

Centralia, IL
62801

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 12pm

Alerts

Be the first to know and let us send you an email when EFI-Solutions, Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to EFI-Solutions, Inc.:

Shortcuts

Share