08/13/2026
Moving millions of gallons of water uphill is a difficult challenge. Managing it safely on the way back down is another.
At the Hilltop Energy Center, we engineered, manufactured, delivered, and installed both sides of the cooling-water system: a high-capacity booster pump station to move massive volumes of water uphill and a custom below-grade PRV station to control pressure on the return.
Designed for a 30-year operational life cycle and up to 260 thermal cycles annually, the system was built to meet the long-term demands of continuous power generation.
Click here to learn more about this project:
https://www.efi-solutions.com/hill-top-energy-center