09/08/2026
We performed this Tilt up warehouse from the ground up but, here is a look at our utility service work in Oakland — padmount transformer terminations, metering, primary and secondary distribution, terminated clean, hi pot testing passed 15 minutes at 50,000 volts no leaks or crackling, and torqued to spec. Site and utility electrical is a specialty most contractors sub out. We self-perform it.
Underground and utility work: https://www.