Cook Marine Consultants

Cook Marine Consultants Cook Marine Consultants provides Marine Surveying, Consulting, and other related services for the Shipping, Transportation, and logistics industry.

Wire Rod in Coils.  Discharging to Barge.
12/24/2021

Wire Rod in Coils. Discharging to Barge.

A day late but enjoyed the Maritime day at sea!
05/23/2020

A day late but enjoyed the Maritime day at sea!

Ensure proper quantities are received or reported at critical times.Contact us if we can assist with your bunker survey ...
04/03/2020

Ensure proper quantities are received or reported at critical times.
Contact us if we can assist with your bunker survey needs.
Offering a full range of Marine Consulting and Surveying.

Conducted an Insurance claim investigation on behalf of the vessel owners. The vessel dragged anchor, broke good lines a...
03/17/2020

Conducted an Insurance claim investigation on behalf of the vessel owners. The vessel dragged anchor, broke good lines and was potentially damage during high River. Additional information withheld.
Yes, we do that and more.

We provide bunker surveying and testing.Contact us to protect your interests.https://www.facebook.com/27223368885/posts/...
01/06/2020

We provide bunker surveying and testing.
Contact us to protect your interests.

https://www.facebook.com/27223368885/posts/10157680176553886/

HOUSTON (Reuters) – As a global clean-fuel mandate takes effect Jan. 1, testing companies examining newer, low-sulfur marine blends acquired in Antwerp, Belgium; Houston and Singapore have found sediment at levels that could damage the engines of ocean-going vessels. Routine tests by AmSpec Servic...

Nice cool day. Sun is out and ready to have a great Marine Survey.
12/19/2019

Nice cool day. Sun is out and ready to have a great Marine Survey.

05/30/2019

Anyone on the Atchafalaya River or near the flood plain please be prepared for the additional water coming your way.

The operation of the Morganza Spillway (Mile 280 AHP) is confirmed with a scheduled opening on Sunday, June 2, 2019:



“Preparations are underway for the confirmed opening of the Morganza Floodway starting on 2 June (slow opening), based on very high stages predicted at the structure, coupled with the potential for even higher stages/river flow over the longer term. A minimum of 2-weeks Morganza operations are predicted.”.

It has been reported that if the spillway is not opened the structure could be over topped creating a more dangerous situation.

Photo of the 2011 opening with a few days open.

Visiting the SUNY Maritime "Empire State"q training ship during her port stay. Visiting with alumni.
05/22/2019

Visiting the SUNY Maritime "Empire State"q training ship during her port stay. Visiting with alumni.

Bunker fuel ROB check and audit.
09/08/2018

Bunker fuel ROB check and audit.

Performed a Marine Survey in order to audit the load plan and to maximize cargo loading.
08/08/2017

Performed a Marine Survey in order to audit the load plan and to maximize cargo loading.

Performing a Ship survey at sunset with a full Moon at 12 Mile Anchorage.
08/07/2017

Performing a Ship survey at sunset with a full Moon at 12 Mile Anchorage.

Address

Boutte, LA
70039

Alerts

Be the first to know and let us send you an email when Cook Marine Consultants posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share