06/19/2026
Progress continues on the Ta**us project as dormer framing, metal filter frames, and fans are installed. One feature to note on this project is the ventilation system. The fans installed will help move air through the filters to clean incoming air before entering the space. Any excess air will exit through the exhaust shutter walls to help maintain proper airflow throughout the facility.
The building will also feature automation through a Maximus controller, which will monitor conditions and adjust airflow levels as needed to help maintain a consistent environment.