03/20/2026
Here is a project we did for Grand Central Station last year. Hopefully our quality of work makes up for my ability to post pictures regularly. This project was engineer designed, and came with the stipulation that “it has to be perfect”. We built 2 of these gates, all fabricated from scratch. Every finial was welded, and sanded to have the same filleted smooth finish. In total there are about 12 weeks of labor just in sanding, but I think it was worth it. What about you?