MillerClapperton

Directions Website Contact the business

MillerClapperton National fabricator and regional installer of engineered cladding systems. Iconic facades. Expertly done. When they tell you to call in the experts, they mean us.

MillerClapperton is a national fabricator and regional installer of engineering cladding systems. We are the final touch on your building. We’re the last to go in and therefore the ones whose job it is to ensure that the building façade you end up with meets and even exceeds your expectations. We know the pressures you face, and we also know the high standards you need upheld. That’s why our customers trust us to get it done right. In this industry, there are a lot of small, “mom-and-pop” shops who will fabricate panels in the parking lot before they go on your building. That’s not us. With 45 years in the business, we know a thing or two about what it takes to achieve the look you expect and how to get it done right the first time. We take the sum work of all the subcontractors that have gone before us and create a beautifully designed façade. Not only that, but we know how to improve your budget, what’s necessary and what isn’t, as well as what’s up to code, and why that matters to you. We know this business and our customers know they can trust us with the projects that matter. Give us the remarkably complex, exceptionally intricate, seemingly impossible projects. That’s where we excel. We execute the complicated. We are thorough and meticulous. We don’t leave things to chance and there’s not much we miss. Time and time again, we’ve proven ourselves to be a trusted, reliable partner for general contractors and architects alike. We are members of the Metal Construction Association (MCA) and an MCA certified MCM System Fabricator. As experienced industry leaders, we’re committed to engineer, fabricate and install highly sophisticated wall cladding systems that make you and your building look good. Finally, we care to do the right thing. We do right by our own people who work here (which is why we’ve been named one of the Top Workplaces by the Atlanta Journal-Constitution eight times), and they in turn care to do right by you, our customer. There’s a lot of added value our customers get with us that we simply never charge for. And that’s what will have you coming back to us project after project. At MillerClapperton, we do iconic façades exceptionally well.

Every panel we fabricate and every façade we install is a commitment to quality, and we’re honored to see that work reco...
10/22/2026

Every panel we fabricate and every façade we install is a commitment to quality, and we’re honored to see that work recognized. MillerClapperton is ranked No. 434 on ENR’s 2026 Top 600 Specialty Contractors list.

We’re grateful to the general contractors, architects, and manufacturers we partner with, and to the fabrication and field teams whose precision and pride show up in every project. Thank you for building with us.

Tri-County Technical College is replacing the first building ever raised on its Pendleton, S.C., campus with a modern tw...
10/20/2026

Tri-County Technical College is replacing the first building ever raised on its Pendleton, S.C., campus with a modern two-story, 52,000-square-foot academic hub. New Pickens Hall takes the place of the original 1963 structure that opened the college's doors, bringing the Business and Public Services, Academic and Career Foundations, Early Childhood Education, and Lifetime Fitness and Wellness programs together under one roof.

Serving a college that enrolls more than 9,000 students a year across Anderson, Oconee and Pickens counties, the new building ties into the campus-wide Central Energy Plant and anchors a new campus green connecting Pickens Hall to adjacent Anderson Hall.

MillerClapperton fabricated and installed 9,000 square feet of ALUCOBOND Metal Composite Material (MCM) panels and 800 square feet of Petersen Aluminum / PAC-CLAD Metal Roofing Profile Single-Skin metal panels, giving the new hub a clean, contemporary exterior.

General Contractor: Harper General Contractors
Architect: DP3 Architects

On October 15, MillerClapperton celebrated 47 years in business. Started by Ted S. Miller and Dave Clapperton at the Mil...
10/16/2026

On October 15, MillerClapperton celebrated 47 years in business.

Started by Ted S. Miller and Dave Clapperton at the Miller's kitchen table, the company has grown over the years to the company it is today.

Check out today's Conversations with Zane to learn more: https://ow.ly/1Zyi50ZYvg0

In This Week’s Friday5:⠀1:  NCCER recently released a new tool, CraftPro2: QTS in Suwanee, GA3: Conversations with Zane:...
10/16/2026

In This Week’s Friday5:⠀
1: NCCER recently released a new tool, CraftPro
2: QTS in Suwanee, GA
3: Conversations with Zane: 47 Years. So much to be thankful for.
4: BOMA International recently released its 2026 Market Study
5: The Review: “Out There: New Architecture Across America” by Robert Ivy, Cathleen McGuigan, and Peter MacKeith

View here: https://ow.ly/5I2j50ZYrBS and sign up for future issues here: https://ow.ly/lyXx50ZY9G0

Georgia Tech’s first new residence hall in 20 years recently opened. The 190,000-square-foot, eight-story building has 8...
10/13/2026

Georgia Tech’s first new residence hall in 20 years recently opened. The 190,000-square-foot, eight-story building has 860 beds in double-occupancy rooms, a 24-hour market, fitness center, group kitchens, community lounges and study rooms.

MillerClapperton fabricated and installed a variety of products for the project, including approximately 17,000 square feet of ALUCOBOND Metal Composite Material (MCM) panels; 44,600 square feet of EQUITONE Facade Fiber Cement panels; 17,100 square feet of Corten steel panels and 1,300 square feet of sunshades. The residence hall is also expected to be LEED Gold certified and is designed and constructed to Passive House standards.

General Contractor: New South Construction Company
Architects: Lord Aeck Sargent and Mithun

In This Week’s Friday5:⠀1: The number of women in construction has hit an industry high2: Warner Science Building at Har...
10/09/2026

In This Week’s Friday5:⠀
1: The number of women in construction has hit an industry high
2: Warner Science Building at Harpeth Hall
3: Conversations with Zane: The Trade-off of Waiting
4: 2030 Commitment Progress Report
5: The Review: AECOM exec encourages other women in construction to embrace challenges

View here: https://ow.ly/hEJ450ZW2CA and sign up for future issues here: https://ow.ly/9eN350ZVTk8

Coca-Cola Bottling Company UNITED recently opened its new corporate headquarters and sales center in Birmingham, AL. The...
10/06/2026

Coca-Cola Bottling Company UNITED recently opened its new corporate headquarters and sales center in Birmingham, AL. The 576,000-square-foot facility brings hundreds of employees together at a 103-acre campus in the city where the company got its start more than 120 years ago.

The Birmingham Campus is situated over 103 acres in the Birmingham Kingston community. The new corporate headquarters is expected to open in 2027, in time for the company’s 125th anniversary.

The new “Gateway to Birmingham,” the campus is designed to be highly visible from Interstate 20/59 and carries Coca-Cola touches inside and out.

For this project, MillerClapperton fabricated and installed approximately 20,000 square feet of ALUCOBOND Metal Composite Material (MCM) panels on the campus office building, greeting center, and classic foods building.

General Contractor: Brasfield & Gorrie
Architects: Williams Blackstock Architects

Learn more about this project: https://ow.ly/RmYZ50ZSQZm

In This Week’s Friday5:⠀1: Rethinking the Building Enclosure2: Tulane University's Bruff Quad Phase IIA3: Conversations ...
10/02/2026

In This Week’s Friday5:⠀
1: Rethinking the Building Enclosure
2: Tulane University's Bruff Quad Phase IIA
3: Conversations with Zane: Slowing Down and Speeding Up
4: Building with AI
5: The Review: Max Bond: The Life and Work of the People’s Architect by Brian D. Goldstein

View here: https://ow.ly/Thfj50ZTWFI and sign up for future issues here: https://ow.ly/KKTo50ZTWFJ

K1 Speed is an indoor electric go-kart racing and entertainment venue in Thorton, CO, with a professionally designed tra...
09/29/2026

K1 Speed is an indoor electric go-kart racing and entertainment venue in Thorton, CO, with a professionally designed track, adult and junior electric karts, an arcade, a café and private event spaces for parties and corporate events.

For this project, MillerClapperton fabricated and installed 880 square feet of ALPOLIC Metal Composite Material (MCM) panels and 5,000 square feet of Trespa High-Pressure Laminate (HPL) panels.

General Contractor: Murray & Stafford Inc.
Architect: Slaggie Architects

Address

8050 Troon Circle
Austell, GA
30168

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when MillerClapperton posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MillerClapperton:

Share

Category