Farwest Steel Corporation Auburn

Call Directions Website

Farwest Steel Corporation Auburn Work with Farwest and you will consistently get expertise, quality, and value – on time, every time. You have our word. And our word is solid as steel.

That’s the Farwest Way.

Dalton WinmillCongratulations to Dalton Winmill (left) for 5 Years of Service at Farwest Steel.  Dalton is a driver at o...
07/17/2026

Dalton Winmill
Congratulations to Dalton Winmill (left) for 5 Years of Service at Farwest Steel. Dalton is a driver at our Boise, Idaho facility. (Seth Vincent, OPS MGR also pictured)

Lacey SmithCongratulations to Lacey Smith for 20 Years of Service at Farwest Steel.  Lacey is one of our sales represent...
07/17/2026

Lacey Smith
Congratulations to Lacey Smith for 20 Years of Service at Farwest Steel. Lacey is one of our sales representatives at the Boise, Idaho facility. Thank you for all you do Lacey! (March Hodder, BM also pictured)

Congratulations on 10 YEARS of Service Jason Evans.    Jason is our sawyer; he is the go-to guy when we need to locate m...
07/08/2026

Congratulations on 10 YEARS of Service Jason Evans. Jason is our sawyer; he is the go-to guy when we need to locate material we can’t find! He is a hard worker, reliable with a great attitude. He is also a veteran and ex-medic who recently updated all his EMT/medic certifications so he will be an asset to the team having these skills. He also enjoys bringing in snacks for the team he makes with his high-tech food dehydrator such as items like freeze dried ice cream, jolly ranchers, etc..

Seattle MSCI golf event Newcastle Golf ClubJasen Allen - Nucor, Brad Tumleson - OMAX,  Chris Holzgang - Farwest
06/25/2026

Seattle MSCI golf event Newcastle Golf Club
Jasen Allen - Nucor, Brad Tumleson - OMAX, Chris Holzgang - Farwest

RILEY CROSS - 5 years at Farwest SteelRiley was hired on working swing shift as a warehouseman, promoted to Lead where h...
06/10/2026

RILEY CROSS - 5 years at Farwest Steel
Riley was hired on working swing shift as a warehouseman, promoted to Lead where he worked for a few years. He has moved into a warehouse day shift roll where he operates our crane for the plate/processing bay. He is a hard worker and dedicated to our brand.

DAVID PHILLIP -  10 Years at Farwest Steel David is a dedicated, hard worker, who runs our day shift HDP.  He has worked...
06/10/2026

DAVID PHILLIP - 10 Years at Farwest Steel
David is a dedicated, hard worker, who runs our day shift HDP. He has worked his way up from swing warehouse and grave yard sawyer. Keep up the great work!

TOM ZABALA39 Years at Farwest Steel.  Thank you for all the hard work, dedication and contributions over the years.Happy...
06/10/2026

TOM ZABALA
39 Years at Farwest Steel. Thank you for all the hard work, dedication and contributions over the years.
Happy retirement Tom!

Bare Deck, Rebar Ready.  Got Rebar?  Farwest Steel does and we’re ready to place it!
06/08/2026

Bare Deck, Rebar Ready. Got Rebar? Farwest Steel does and we’re ready to place it!

You need a Post-Tension Cable expert?  Call Farwest Steel Reinforcing.  From PT Slabs and Beams to PT retrofits, we have...
06/04/2026

You need a Post-Tension Cable expert? Call Farwest Steel Reinforcing. From PT Slabs and Beams to PT retrofits, we have the expertise for your project.

If you look around the Portland skyline, you would be hard-pressed to not see a structure that Carl Ellingson either det...
06/03/2026

If you look around the Portland skyline, you would be hard-pressed to not see a structure that Carl Ellingson either detailed or provided engineering expertise on. Thank you for the 30 Years Carl and looking forward to 30 more!

Invest in your company better with steel production that just makes sense. We have the capabilities to switch between jo...
04/13/2026

Invest in your company better with steel production that just makes sense. We have the capabilities to switch between jobs faster and safer than the other guys, which saves you time and money. Since 1956 we've been finding new ways to get jobs done faster, in-house.

Our new press brake system allows us to handle steel up to 60 feet, with an adjustable bottom die with a minimum gap of 2 inches and a maximum gap of 12 inches - which means less outsourcing and more time saved for you.

Better material flow, heavier capacity, less welds - our machines are ready to work for you. Upgrade to Farwest Steel today at farweststeel.com.

04/10/2026

From planning to production and distribution - our team is ready to make it happen. Consolidate many suppliers when you switch to Farwest Steel, where we do it all. 💪

Our most recent investment, a new press brake, lets us handle productions with longer legs and heavier capacity. Our fully integrated, in-house production saves you time (and money).

Explore how this process, and our brand new heavy press brake, can handle your heaviest projects: 🔗 farweststeel.com/new-press-brakes-2026.

From start to finish, Farwest Steel is your partner in effective and efficient steel production. 🤝 Our new press brake t...
04/08/2026

From start to finish, Farwest Steel is your partner in effective and efficient steel production. 🤝 Our new press brake takes us from good to great, reducing outsourcing and complex on-site forming.

Our investment in this new machinery allows us to get your jobs done better and faster. Upgrade with the premium steel production choice of the West Coast!

Address

Auburn, WA

Alerts

Be the first to know and let us send you an email when Farwest Steel Corporation Auburn posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share