11/13/2021
We've got the pass through window opened up and framed out, the pantry removed, we redesigned the layout of the kitchen so the plumbing and electrical had to totally be reconfigured and finished before we could do drywall and tape&bed, we added under cabinet lighting, a can light and track lighting, and the old laminate flooring was removed and subfloor was prepared for tile installation.