Hamid Nawaz for BMS - HVAC - Smoke curtain Services

Hamid Nawaz for BMS - HVAC - Smoke curtain Services We hereby take this opportunity to introduce ourselves as one of the rapid growing HVAC & BMS contractor The company has started operations in January, 2010.

In a short journey of few year only, various projects at different locations have been accomplished with hard work and intelligent approach of vastly experienced management. It has been a fortune first few years for the establishment. The aim is to take the organization to the top level in the most competent environment by constant hard work and fair dealings. Management of the company has vast ex

perience in the construction and electro-mechanical field & Automation. It has completed many projects in the field of electrical, plumbing, firefighting, chilled water and HVAC at different projects like KAUST, KSAU, PNU, MOI and DOKAAE. The organization is divided in four main divisions namely:

1. Electro-mechanical Division
2. Maintenance Division
3. Automation & BMS
4. Auto cad services

These divisions cooperate either together to execute turnkey projects or independently to execute projects in their respective specialties. Keeping in view of the experience, expertise, financial resources and equipment; the company is capable and confident to undertake any Electrical & Mechanical Engineering construction project of substantial magnitude.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐๐Œ๐’ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐ƒ๐ซ. ๐’๐จ๐ฅ๐ข๐ฆ๐š๐ง ๐…๐š๐ค๐ž๐ž๐ก ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐‰๐ž๐๐๐š๐ก ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐ƒ๐ซ. ๐’๐จ๐ฅ๐ข๐ฆ๐š๐ง ๐…๐š๐ค๐ž๐ž๐ก ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ (๐ƒ๐’๐…๐‡), ๐‰...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐๐Œ๐’ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐ƒ๐ซ. ๐’๐จ๐ฅ๐ข๐ฆ๐š๐ง ๐…๐š๐ค๐ž๐ž๐ก ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐‰๐ž๐๐๐š๐ก
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐ƒ๐ซ. ๐’๐จ๐ฅ๐ข๐ฆ๐š๐ง ๐…๐š๐ค๐ž๐ž๐ก ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ (๐ƒ๐’๐…๐‡), ๐‰๐ž๐๐๐š๐ก
๐’๐œ๐จ๐ฉ๐ž: ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐Œ๐š๐ง๐š๐ ๐ž๐ฆ๐ž๐ง๐ญ ๐’๐ฒ๐ฌ๐ญ๐ž๐ฆ (๐๐Œ๐’) โ€“ ๐’๐ž๐ง๐ฌ๐จ๐ซ๐ฌ, ๐ƒ๐ƒ๐‚ ๐๐š๐ง๐ž๐ฅ๐ฌ, ๐š๐ง๐ ๐‚๐๐Œ ๐’๐œ๐ก๐ž๐๐ฎ๐ฅ๐ข๐ง๐ 
BMS Installation Lifecycle (1st, 2nd, and 3rd Fix)
The technical installation at DSFH is being managed through a rigorous three-stage "fix" process to ensure the hospitalโ€™s advanced medical infrastructure (Neurology, Oncology, and Pediatrics wings) meets international standards.
1st Fix: Containment & Infrastructure
Routing: Installation of galvanized iron (GI) conduits, trunking, and cable trays within the ceiling and wall partitions.
Integration: Coordination with structural and mechanical teams to ensure pathways are clear for sensor wiring without compromising sterile hospital zones.
Backboxes: Mounting of concealed backboxes for wall-mounted temperature and humidity sensors.
2nd Fix: Wiring & Panel Installation
DDC Panels: Installation of Direct Digital Control (DDC) panels in mechanical rooms and electrical closets. These act as the "brain" for specific zones.
Field Wiring: Pulling of shielded BMS communication cables and low-voltage power cables from the DDC panels to various sensor locations.
Device Mounting: Preliminary installation of actuators on dampers and baseplates for sensors.
3rd Fix: Devices, Termination & Commissioning
Final Sensor Fitting: Installation of high-precision field devices, including:
Duct Sensors: Temperature and humidity sensors within AHUs.
Pressure Sensors: Differential pressure sensors for Operating Rooms (OR) and Isolation suites.
Air Quality: CO2 and VOC sensors for patient comfort.
Termination: Final wiring connections at both the sensor head and the DDC panel.
System Testing: Point-to-point verification to ensure the central workstation correctly reads every physical sensor.
Project Management & CPM
The project utilizes the Critical Path Method (CPM) to maintain the tight schedule required for a 24/7 operating hospital.
Logic Links: CPM ensures that 2nd fix wiring cannot start until 1st fix containment is inspected and approved.
Milestones: Key milestones include the energization of DDC panels and the integration of the BMS with the hospital's central fire alarm and HVAC systems.
Float Management: By monitoring "total float," the team manages delays in hardware shipping (like specialized DDC controllers) without impacting the overall project completion date.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐„๐ง๐ž๐ซ๐ ๐ฒ ๐„๐Ÿ๐Ÿ๐ข๐œ๐ข๐ž๐ง๐œ๐ฒ ๐ˆ๐ง๐ข๐ญ๐ข๐š๐ญ๐ข๐ฏ๐ž โ€“ ๐Š๐ข๐ง๐  ๐Š๐ก๐š๐ฅ๐ข๐ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐“๐š๐›๐ฎ๐ค ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐Š๐ข๐ง๐  ๐Š๐ก๐š๐ฅ๐ข๐ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ (๐Š๐Š๐‡), ๐“๐š๐›๐ฎ๐ค...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐„๐ง๐ž๐ซ๐ ๐ฒ ๐„๐Ÿ๐Ÿ๐ข๐œ๐ข๐ž๐ง๐œ๐ฒ ๐ˆ๐ง๐ข๐ญ๐ข๐š๐ญ๐ข๐ฏ๐ž โ€“ ๐Š๐ข๐ง๐  ๐Š๐ก๐š๐ฅ๐ข๐ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐“๐š๐›๐ฎ๐ค
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐Š๐ข๐ง๐  ๐Š๐ก๐š๐ฅ๐ข๐ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ (๐Š๐Š๐‡), ๐“๐š๐›๐ฎ๐ค, ๐’๐š๐ฎ๐๐ข ๐€๐ซ๐š๐›๐ข๐š
๐’๐œ๐จ๐ฉ๐ž: ๐„๐ง๐ž๐ซ๐ ๐ฒ ๐Œ๐ž๐ญ๐ž๐ซ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐š๐ง๐ ๐‚๐จ๐ง๐ฌ๐ฎ๐ฆ๐ฉ๐ญ๐ข๐จ๐ง ๐Œ๐จ๐ง๐ข๐ญ๐จ๐ซ๐ข๐ง๐  ๐Ÿ๐จ๐ซ ๐„๐ช๐ฎ๐ข๐ฉ๐ฆ๐ž๐ง๐ญ ๐‹๐ข๐Ÿ๐ž๐œ๐ฒ๐œ๐ฅ๐ž ๐€๐ฌ๐ฌ๐ž๐ฌ๐ฌ๐ฆ๐ž๐ง๐ญ

Project Phase: Energy Audit & Metering
Smart Meter Installation:

Deployment of advanced digital energy meters across key hospital wings and high-load mechanical rooms.

Installation of sub-meters for specialized medical equipment (Imaging/MRI) and centralized utility systems.

Wiring and integration into a central Energy Management System (EMS) for real-time data logging.

Consumption Monitoring:

Establishing a baseline for 24/7 energy usage, identifying peak demand periods and operational inefficiencies.

Load profiling of HVAC systems, chiller plants, and water pumping stations to detect "energy leaks."

Strategic Objectives
Data-Driven Replacement Strategy: * The project uses real-time consumption data to identify aging or low-performance hardware.

Equipments showing disproportionately high power draw compared to output are flagged for immediate maintenance or full replacement.

Infrastructure Optimization: * Aligning hospital operations with the National Energy Services Company (Tarshid) standards.

Upgrading to high-efficiency motors, LED lighting, and smart climate controls based on audited performance metrics.

Project Impact
This initiative at King Khalid Hospital is a critical step in Tabukโ€™s healthcare infrastructure modernization. By transitioning from scheduled maintenance to condition-based replacement, the facility aims to:

Reduce Operational Costs: Cutting annual electricity expenditure through targeted equipment upgrades.

Ensure Reliability: Preventing emergency failures of critical medical life-support systems by monitoring electrical health.

Sustainability: Supporting Saudi Vision 2030 goals for energy conservation in public sector buildings.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐Œ๐ž๐œ๐ก๐š๐ง๐ข๐œ๐š๐ฅ & ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐€๐ฌ๐ฌ๐ข๐ฅ๐š ๐“๐จ๐ฐ๐ž๐ซ,๐‘๐ข๐ฒ๐š๐๐ก๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐€๐ฌ๐ฌ๐ข๐ฅ๐š ๐‡๐ / ๐“๐จ๐ฐ๐ž๐ซ, ๐‘๐ข๐ฒ๐š๐๐ก, ๐’๐š๐ฎ๐๐ข ๐€...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐Œ๐ž๐œ๐ก๐š๐ง๐ข๐œ๐š๐ฅ & ๐„๐ฅ๐ž๐œ๐ญ๐ซ๐ข๐œ๐š๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐€๐ฌ๐ฌ๐ข๐ฅ๐š ๐“๐จ๐ฐ๐ž๐ซ,๐‘๐ข๐ฒ๐š๐๐ก
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐€๐ฌ๐ฌ๐ข๐ฅ๐š ๐‡๐ / ๐“๐จ๐ฐ๐ž๐ซ, ๐‘๐ข๐ฒ๐š๐๐ก, ๐’๐š๐ฎ๐๐ข ๐€๐ซ๐š๐›๐ข๐š
๐’๐œ๐จ๐ฉ๐ž: ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐จ๐Ÿ ๐‚๐ก๐ข๐ฅ๐ฅ๐ž๐ซ๐ฌ, ๐๐ฎ๐ฆ๐ฉ๐ฌ, ๐š๐ง๐ ๐€๐ฌ๐ฌ๐จ๐œ๐ข๐š๐ญ๐ž๐ ๐Œ๐„๐ ๐’๐ฒ๐ฌ๐ญ๐ž๐ฆ๐ฌ
Mechanical Installation (HVAC)
Chiller Units:
Rigging and placement of high-efficiency water-cooled or air-cooled chillers.
Mounting on vibration-isolation pads to ensure structural stability within the tower.
Connection to the primary chilled water circuit and thermal insulation of refrigerant piping.
Chilled Water Pumps:
Installation of primary and secondary pump sets for building-wide fluid circulation.
Laser alignment of pump shafts and motors to prevent operational wear.
Fitting of suction diffusers, strainers, and flexible connectors.
Electrical & Integration Works
Power Distribution:
Installation of dedicated electrical panels and sub-distribution boards for the chiller plant.
Running of armored power cabling and tray systems from the main switchgear.
Integration of Variable Frequency Drives (VFDs) for the pump motors to optimize energy consumption.
Control Systems:
Wiring and termination of field sensors (Flow switches, Temp/Pressure sensors).
Connection to the Building Management System (BMS) for centralized climate monitoring.
Project Objectives
Technical Compliance: Adhering to Riyadhโ€™s local climatic design requirements and high-rise mechanical standards.
System Efficiency: Providing precise thermal regulation for the tower's office and commercial spaces.
Safety & Testing: Conducting pressure leak tests and electrical load verification prior to system commissioning.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐‡๐•๐€๐‚ ๐’๐ฒ๐ฌ๐ญ๐ž๐ฆ ๐”๐ฉ๐ ๐ซ๐š๐๐ž โ€“ ๐“๐š๐ข๐›๐š๐ก ๐”๐ง๐ข๐ฏ๐ž๐ซ๐ฌ๐ข๐ญ๐ฒ, ๐Œ๐š๐๐ข๐ง๐š๐ก ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐“๐š๐ข๐›๐š๐ก ๐”๐ง๐ข๐ฏ๐ž๐ซ๐ฌ๐ข๐ญ๐ฒ ๐Œ๐š๐ข๐ง ๐‚๐š๐ฆ๐ฉ๐ฎ๐ฌ, ๐Œ๐š๐๐ข๐ง๐š๐ก, ๐’๐š๐ฎ...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐‡๐•๐€๐‚ ๐’๐ฒ๐ฌ๐ญ๐ž๐ฆ ๐”๐ฉ๐ ๐ซ๐š๐๐ž โ€“ ๐“๐š๐ข๐›๐š๐ก ๐”๐ง๐ข๐ฏ๐ž๐ซ๐ฌ๐ข๐ญ๐ฒ, ๐Œ๐š๐๐ข๐ง๐š๐ก
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐“๐š๐ข๐›๐š๐ก ๐”๐ง๐ข๐ฏ๐ž๐ซ๐ฌ๐ข๐ญ๐ฒ ๐Œ๐š๐ข๐ง ๐‚๐š๐ฆ๐ฉ๐ฎ๐ฌ, ๐Œ๐š๐๐ข๐ง๐š๐ก, ๐’๐š๐ฎ๐๐ข ๐€๐ซ๐š๐›๐ข๐š
๐’๐œ๐จ๐ฉ๐ž: ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง ๐š๐ง๐ ๐‘๐ž๐ฉ๐ฅ๐š๐œ๐ž๐ฆ๐ž๐ง๐ญ ๐จ๐Ÿ ๐‚๐ก๐ข๐ฅ๐ฅ๐ž๐ซ๐ฌ, ๐๐ฎ๐ฆ๐ฉ๐ฌ, ๐š๐ง๐ ๐€๐ฌ๐ฌ๐จ๐œ๐ข๐š๐ญ๐ž๐ ๐Œ๐ž๐œ๐ก๐š๐ง๐ข๐œ๐š๐ฅ ๐ˆ๐ง๐Ÿ๐ซ๐š๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ฎ๐ซ๐ž

Mechanical Installation Scope
Chiller Plant Modernization:

Installation of high-efficiency air-cooled or water-cooled chiller units to replace aging campus infrastructure.

Precision rigging and placement of units on reinforced concrete plinths with vibration isolation systems.

Connection to the primary chilled water header and thermal insulation of external refrigerant/water lines.

Pumping Systems:

Installation of primary and secondary chilled water pumps to ensure consistent flow across academic and administrative wings.

Mechanical alignment of pump-motor sets and installation of variable frequency drives (VFDs) for load-matching efficiency.

Fitting of suction diffusers, non-return valves, and expansion tanks to manage system pressure.

Technical Objectives & Implementation
Environmental Efficiency: The upgrade focuses on reducing energy consumption in line with the University's sustainability initiatives and Saudi Vision 2030 standards.

Climate Reliability: Ensuring the cooling plant can withstand the peak summer temperatures of Madinah while maintaining precise environmental controls for research labs and lecture halls.

System Integration: Aligning the new mechanical hardware with the Universityโ€™s central Building Management System (BMS) for real-time monitoring of thermal loads and system health.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐Œ๐ž๐œ๐ก๐š๐ง๐ข๐œ๐š๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐๐š๐ฉ๐ž๐ซ ๐…๐š๐œ๐ญ๐จ๐ซ๐ฒ, ๐‘๐š๐›๐ข๐ ๐ก ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐™๐จ๐ง๐ž, ๐‘๐š๐›๐ข๐ ๐ก, ๐’๐š๐ฎ๐๐ข ๐€๐ซ๐š๐›๐ข๐š ๐’๐œ๐จ๐ฉ๐ž:...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐๐ž๐ฐ๐ฌ: ๐Œ๐ž๐œ๐ก๐š๐ง๐ข๐œ๐š๐ฅ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐๐š๐ฉ๐ž๐ซ ๐…๐š๐œ๐ญ๐จ๐ซ๐ฒ, ๐‘๐š๐›๐ข๐ ๐ก
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐™๐จ๐ง๐ž, ๐‘๐š๐›๐ข๐ ๐ก, ๐’๐š๐ฎ๐๐ข ๐€๐ซ๐š๐›๐ข๐š
๐’๐œ๐จ๐ฉ๐ž: ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐๐ฎ๐ฆ๐ฉ๐ฌ ๐š๐ง๐ ๐‡๐ž๐š๐ญ ๐„๐ฑ๐œ๐ก๐š๐ง๐ ๐ž๐ซ๐ฌ

Technical Scope & Implementation
Pump Systems:

Installation of high-capacity centrifugal pumps for pulp processing and water treatment.

Mechanical seal fitting and motor-pump shaft alignment.

Connection of suction and discharge manifolds to the main process lines.

Heat Exchangers:

Rigging and positioning of plate/shell-and-tube heat exchangers.

Mounting of thermal sensors and flow control valves.

Integration into the factory's steam and cooling water circuits.

Project Objectives
Thermal Regulation: Ensuring precise temperature control for the paper drying and chemical recovery cycles.

Operational Flow: Establishing reliable fluid transport across the facility to support continuous production.

Industrial Standards: Adhering to high-pressure safety protocols and Rabigh industrial zone environmental regulations.

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐”๐ฉ๐๐š๐ญ๐ž: ๐๐Œ๐’ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐Œ๐จ๐ฎ๐ฐ๐š๐ฌ๐š๐ญ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐‰๐ฎ๐›๐š๐ข๐ฅ ๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐Œ๐จ๐ฎ๐ฐ๐š๐ฌ๐š๐ญ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ ๐„๐ฑ๐ฉ๐š๐ง๐ฌ๐ข๐จ๐ง, ๐‰๐ฎ๐›๐š๐ข๐ฅ ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š...
22/04/2026

๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐”๐ฉ๐๐š๐ญ๐ž: ๐๐Œ๐’ ๐ˆ๐ง๐ฌ๐ญ๐š๐ฅ๐ฅ๐š๐ญ๐ข๐จ๐ง โ€“ ๐Œ๐จ๐ฎ๐ฐ๐š๐ฌ๐š๐ญ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ, ๐‰๐ฎ๐›๐š๐ข๐ฅ
๐๐ซ๐จ๐ฃ๐ž๐œ๐ญ ๐’๐ข๐ญ๐ž: ๐Œ๐จ๐ฎ๐ฐ๐š๐ฌ๐š๐ญ ๐‡๐จ๐ฌ๐ฉ๐ข๐ญ๐š๐ฅ ๐„๐ฑ๐ฉ๐š๐ง๐ฌ๐ข๐จ๐ง, ๐‰๐ฎ๐›๐š๐ข๐ฅ ๐ˆ๐ง๐๐ฎ๐ฌ๐ญ๐ซ๐ข๐š๐ฅ ๐‚๐ข๐ญ๐ฒ
๐’๐œ๐จ๐ฉ๐ž: ๐๐ฎ๐ข๐ฅ๐๐ข๐ง๐  ๐Œ๐š๐ง๐š๐ ๐ž๐ฆ๐ž๐ง๐ญ ๐’๐ฒ๐ฌ๐ญ๐ž๐ฆ (๐๐Œ๐’) โ€“ ๐’๐ž๐ง๐ฌ๐จ๐ซ๐ฌ & ๐ƒ๐ƒ๐‚ ๐๐š๐ง๐ž๐ฅ๐ฌ

Installation Progress
First Fix: Completion of cable containment, trunking, and conduit routing across mechanical floors.

Second Fix: * Mounting of DDC (Direct Digital Control) Panels in designated plant rooms.

Pulling of communication and power cabling.

Installation of sensor baseplates and actuator brackets.

Third Fix: * Final termination of field devices (Temp, Humidity, and Pressure sensors).

Addressing and loop checking of DDC controllers.

System testing for HVAC and sterile environment controls.

Key Objectives
Automated Climate Control: Precision monitoring for operating theaters and patient wards.

Energy Efficiency: Optimized chiller and AHU performance to reduce operational costs.

Integration: Full connectivity between field sensors and the central monitoring station.

17/02/2026

Project News : HN Engineers Heading North! ( Al Qurayyat! )We are thrilled to announce that HN Engineers has secured a m...
21/01/2026

Project News : HN Engineers Heading North! ( Al Qurayyat! )

We are thrilled to announce that HN Engineers has secured a major contract to upgrade the Building Management Systems (BMS) across 5 different Ministry locations in Al Qurayyat!

The Mission: Remote Excellence: Overcoming the logistical challenges of the far north to deliver high-quality engineering on budget.
Smart Integration: Utilizing world-class Siemens controllers to modernize and integrate existing systems.

Strategic Impact: Enhancing efficiency for key government infrastructure.
Distance is no barrier to excellence! We wish our dedicated site teams the best of luck as they mobilize for this ambitious project. ๐Ÿš€

Project News : Team HN Heading to AMAALA! Our DDC Fabrication Team has secured a major order to supply DDC and FCU panel...
21/01/2026

Project News : Team HN Heading to AMAALA!

Our DDC Fabrication Team has secured a major order to supply DDC and FCU panels for the prestigious Amaala project!

Why Team HN?
Record Speed: Fabricating high-quality panels in record time to meet tight deadlines.

Proven Success: After delivering hundreds of panels in 2025, we are ready to scale even higher in 2026! ๐Ÿš€

Congratulations to the team for securing this significant order. Letโ€™s make this our biggest year yet! ๐Ÿ“ˆ๐Ÿ

Project News : King Faisal Specialist Hospital (KFSH, Jeddah)Team HN has officially secured a critical infrastructure pr...
21/01/2026

Project News : King Faisal Specialist Hospital (KFSH, Jeddah)

Team HN has officially secured a critical infrastructure project at the King Faisal Specialist Hospital (KFSH) in Jeddah! This high-stakes project involves the complete replacement of chillers, pumps, and all associated electrical and mechanical works.

Critical Operations: Maintaining a stable climate is vital for patient care and sensitive medical equipment.

Full-Scale MEP: A comprehensive overhaul requiring precision engineering and seamless ex*****on.

Trust in Excellence: Being selected for such a vital facility reflects the trust clients place in HN Engineers for complex, mission-critical environments.

We wish our site team the best of luck as they take on this challenging task. Letโ€™s deliver another successful outcome! ๐Ÿš€๐Ÿ‘

Address

King Fahad Road/
Jeddah
21563

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

+966126514029

Alerts

Be the first to know and let us send you an email when Hamid Nawaz for BMS - HVAC - Smoke curtain Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share