16/12/2025
Project Update π
From the initial design shared last April to its current form today.
This Rack Full Assembly has undergone significant redesign, optimization, and engineering improvements.
To ensure quality and reliability, structural simulations and analyses were performed on the redesigned sub-assemblies and components to verify that they can safely handle the required loads once executed and assembled in real-world conditions.
Hereβs the latest evolution of the URBX Rack Full Assembly + Pick Station project.