On Call Electrical and Engineering Services

On Call Electrical and Engineering Services etc.

On Call Electrician for your Electrical needs such as:

*Design, Estimate, Assessment and As-built

*Commercial and Residential building wiring and re-wiring

*Conduct IR test, Grounding Test, Full load Test, Functionality Test, Phase Sequence Test. Equipment details:

1) Digital Insulation Tester
Brand: Megger
Model: MIT-320 (with calibration certificate)
Calibrated by : AVESCO
Calibration date:

May 18, 2022
Expiration: May 18, 2023

2) Insulation Resistance Tester
Brand: Fluke
Model: 1587(with calibration certificate)
Calibrated by: AVESCO
Calibration date: October 5, 2021
Expiration: October 5, 2022

3) High Voltage Insulation Resistance Tester
Brand: Kyoritsu
Model: KEW3125 (with calibration certificate)
Calibrated by: AVESCO
Calibration date: September 24, 2021
Expiration: September 24, 2022

4) Earth Resistance Tester
Brand: Kyoritsu
Model: 4105A (with calibration certificate)
Calibrated by : AVESCO
Calibration date: November 18, 2021
Expiration: November 18, 2022

5) Digital Clampmeter
Brand: Fluke
Model: 375 (with calibration certificate)
Calibrated by: AVESCO
Calibration date: May 4, 2022
Expiration: May 4, 2023

First time client in Testing.Conducted Thermal Scanning at Denovo Diamonds - Century City Mall Makati. Thank you Maam Ca...
01/05/2026

First time client in Testing.

Conducted Thermal Scanning at Denovo Diamonds - Century City Mall Makati. Thank you Maam Caryll for giving a chance to conduct testing in your Shop.

Annual Building requirement.

Our Services include not only the required testing but also to help our clients solve/troubleshoot their electrical system.

For inquires, just call or text lang po..



Thermal Scanning

It’s been 18 years since I took the Electrical Engineering board exam. I passed, but up to now, I’m still unable to sign...
27/04/2026

It’s been 18 years since I took the Electrical Engineering board exam. I passed, but up to now, I’m still unable to sign and seal electrical plans. Is it time for me to step up and finally dedicate time to completing my TER?

First-time client engagement for Insulation Resistance (IR) Testing ⚡Completed IR testing works at Maple Groove, General...
27/04/2026

First-time client engagement for Insulation Resistance (IR) Testing ⚡
Completed IR testing works at Maple Groove, General Trias, Cavite. Special thanks to Arch. Marienne of LightHouse for the opportunity and trust in delivering this service.
Scope of Services: • Insulation Resistance (IR) Testing for feeders, panels, and circuits
• Verification of insulation integrity in accordance with applicable standards
• Identification of leakage paths, moisture ingress, and insulation degradation
• Assessment of cable and equipment condition prior to energization
• Detailed test reports with readings, analysis, and recommendations

We go beyond compliance testing—we provide technical insights and practical solutions to improve system reliability, safety, and performance.
For inquiries and technical consultations, feel free to message or contact us anytime 📩📞




Megger

One of my solid clients in IR Testing. Conducted Insulation Resistance Test at Avire Tower - Quezon City. Thank you Arch...
27/04/2026

One of my solid clients in IR Testing.

Conducted Insulation Resistance Test at Avire Tower - Quezon City. Thank you Arch Jacob of Chunda Builders for giving a chance to conduct testing again on your project.

Our Services include not only the required testing but also to help our clients solve/troubleshoot their electrical system.

For inquires, just call or text lang po..




Megger

Final touch of electrical works. Another Finished Electrical works project in Paran̈aque. We would like to thank G3T for...
16/04/2026

Final touch of electrical works. Another Finished Electrical works project in Paran̈aque. We would like to thank G3T for giving us the opportunity to work with them.


Structural near to finish. Another upcoming bakbakan e-works in QC.
15/04/2026

Structural near to finish. Another upcoming bakbakan e-works in QC.

One of my solid clients in IR Testing. 4 Panelboards tested.Conducted Insulation Resistance Test at UnionBank-Las Pin̈as...
15/04/2026

One of my solid clients in IR Testing.

4 Panelboards tested.

Conducted Insulation Resistance Test at UnionBank-Las Pin̈as. Thank you Engr Benjie of MJA Builders for giving a chance to conduct testing again on your project.

Our Services include not only the required testing but also to help our clients solve/troubleshoot their electrical system.

For inquires, just call or text lang po..




Megger

One of my solid clients in IR Testing. Conducted Insulation Resistance Test at Caswynn Building Timog. Thank you Maam Ka...
15/04/2026

One of my solid clients in IR Testing.

Conducted Insulation Resistance Test at Caswynn Building Timog. Thank you Maam Kay for giving a chance to conduct testing again on your project.

Our Services include not only the required testing but also to help our clients solve/troubleshoot their electrical system.

For inquires, just call or text lang po..




Megger

Another ongoing fit-out electrical project in Timog Ave Quezon CityWe would like to thank Engr Kay of KGC for giving us ...
01/04/2026

Another ongoing fit-out electrical project in Timog Ave Quezon City

We would like to thank Engr Kay of KGC for giving us the opportunity to work with you.

Our Services include not only the required testing but also to help our clients solve/troubleshoot their electrical system.

kuryente_is_deadly
electrical_works

Testing testing testing Megger Testing in MetroPoint Mall- Pasay with Sir Alex of El TorogiMegger Testing in MultiPurpos...
01/04/2026

Testing testing testing

Megger Testing in MetroPoint Mall- Pasay with Sir Alex of El Torogi

Megger Testing in MultiPurpose Building- Buena Park Caloocan with Engr Ben of G3T

Megger Testing in UnionBank - Cainta with Engr Benjie of MJA Builders

Megger Testing, Full Load Testing, Functionality Test anf other testings in Anvaya Cove - Morong Bataan with Engr Kay of KGC

We are very busy with Electrical work activities.

Phase 1 1) Roughing-ins2) Wiring -ins3) Final FixWe have no choice but to install lighting fixtures even though ceiling ...
14/02/2026

Phase 1
1) Roughing-ins
2) Wiring -ins
3) Final Fix

We have no choice but to install lighting fixtures even though ceiling is not yet totally prepared.

Phase 2
1) Painting works
2) etc

This is how they do the program of works for this project.

Address

Valenzuela
1442

Alerts

Be the first to know and let us send you an email when On Call Electrical and Engineering Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share