Trigene construction and architects

Trigene construction and architects construction supply + design services

19/11/2025
14/11/2025

Another day at the office.

10/09/2025

The United Architects of the Philippines stands resolute in upholding integrity in public works. We support a thorough and transparent investigation, anchored on accountability and ethical practice—because nation-building begins with trust.


06/09/2025

This image is an educational graphic illustrating different topography types or methods of integrating architecture with varying terrain. It features four distinct diagrams, each presenting a common approach, drawn in a clear, hand-sketched style with simple labels.

Here's a detailed breakdown:

Overall Theme and Presentation:
* Title: "TOPOGRAPHY TYPES" is prominently displayed at the top, indicating the subject matter.
* Author: Below the title, "" provides attribution, suggesting the content is created by an architect or someone in an architectural field.
* Layout: The image is divided into four main sections, each with a diagram and a corresponding label at the bottom.
* Art Style: The diagrams are rendered in a clean, hand-drawn, illustrative style, making the concepts easy to understand. Black lines define the forms, while a light green/tan color fills the terrain, and a hatched pattern fills the structures.
* Call to Action: "SWIPE >>>" at the bottom right suggests this is part of a multi-slide series, common on social media platforms like Instagram.

Detailed Description of Each Topography Type:

1. FREESTANDING
* Concept: This method involves elevating a structure above the natural ground, often on pillars or stilts, allowing the existing terrain to remain largely undisturbed underneath.
* Visuals: The diagram shows an "inclined terrain" (a sloping hill). A rectangular structure (representing a building or deck) is shown "supported on pillars" that extend down to the sloped ground. The space beneath the structure is open, following the natural contour of the land.
* Labels:
* An arrow points from "SUPPORTED ON PILLARS" to the pillars holding up the structure.
* Another arrow points from "INCLINED TERRAIN" to the sloping ground beneath and around the structure.
* Architectural Implication: Often used to minimize environmental impact, deal with flood plains, create ventilation, or achieve a level living space on very steep slopes without extensive excavation.

2. CANTILEVERED
* Concept: A cantilevered structure has a portion that projects horizontally into space, supported only at one end by a solid base or wall.
* Visuals: The diagram depicts a terrain that forms a stepped or cut edge. A structure is firmly anchored into this higher ground, and a significant part of it extends outwards, "floating" above the lower ground without any visible support from beneath its projecting end.
* Labels:
* An arrow points from "CANTILEVER PROJECTION" to the overhanging, unsupported part of the structure.
* Architectural Implication: Creates dramatic forms, opens up views, and allows for building over challenging terrain or water without needing supports across the entire footprint.

3. PLATFORM
* Concept: This approach involves creating a level "platform" or base by modifying the terrain, upon which the building then rests. This often requires some cut and/or fill of the earth.
* Visuals: The diagram shows an inclined terrain that has been cut and leveled to create a flat, horizontal surface. A structure is depicted "resting on platform" on this newly created flat area, with its own smaller, internal supports (like a foundation or low walls) on the platform itself.
* Labels:
* An arrow points from "RESTING ON PLATFORM" to the structure sitting on the flattened ground.
* Architectural Implication: Provides a stable, flat foundation for conventional construction on sloped sites. It's a very common method for creating usable building sites.

4. CUT & FILL
* Concept: This technique involves excavating earth ("cut") from higher areas of a site and using that material to build up ("fill") lower areas to create desired grades and level surfaces. The building then adapts to these newly graded levels.
* Visuals: The diagram illustrates a significantly modified terrain. One section of the ground has been cut down to a lower level, while an adjacent section has been filled to create a higher level, forming distinct horizontal steps in the topography. The structure shown is a "staggered section," indicating a building designed with multiple levels that conform to the different graded platforms created by the cut and fill.
* Labels:
* An arrow points from "STAGGERED SECTION" to the multi-level structure that spans the different elevations created by the cut and fill.
* Architectural Implication: This is a fundamental site grading technique that allows for the creation of complex multi-level buildings or terraced landscapes on varied terrain, often incorporating retaining walls.

In summary, the image effectively uses simple, clear diagrams to explain fundamental architectural and landscape design strategies for interacting with and ada

07/06/2025

VINTAGE VIBE

new on the island, wine and liquor it is 🤙

coming sooon!


Another day at the Office. siargao site visit / quick getaway 🤙
06/06/2025

Another day at the Office.

siargao site visit / quick getaway 🤙



24/04/2025

ANOTHER DAY AT THE OFFICE


07/03/2025

Legit! 🤙

Address

Upper Malico, Bernadette Village, Brgy. Luna
Surigao City
8400

Website

Alerts

Be the first to know and let us send you an email when Trigene construction and architects posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Trigene construction and architects:

Share