M&C Engineering Services

M&C Engineering Services ๐˜›๐˜ณ๐˜ข๐˜ฏ๐˜ด๐˜ง๐˜ฐ๐˜ณ๐˜ฎ๐˜ช๐˜ฏ๐˜จ ๐˜บ๐˜ฐ๐˜ถ๐˜ณ ๐˜ฃ๐˜ฐ๐˜ญ๐˜ฅ๐˜ฆ๐˜ด๐˜ต ๐˜ท๐˜ช๐˜ด๐˜ช๐˜ฐ๐˜ฏ๐˜ด ๐˜ช๐˜ฏ๐˜ต๐˜ฐ ๐˜ด๐˜ฐ๐˜ญ๐˜ช๐˜ฅ ๐˜ณ๐˜ฆ๐˜ข๐˜ญ๐˜ช๐˜ต๐˜บ. ๐˜๐˜ณ๐˜ฐ๐˜ฎ ๐˜ง๐˜ช๐˜ณ๐˜ด๐˜ต ๐˜ด๐˜ฌ๐˜ฆ๐˜ต๐˜ค๐˜ฉ ๐˜ต๐˜ฐ ๐˜ง๐˜ช๐˜ฏ๐˜ข๐˜ญ ๐˜ฃ๐˜ณ๐˜ช๐˜ค๐˜ฌ, ๐˜ธ๐˜ฆ ๐˜ฃ๐˜ถ๐˜ช๐˜ญ๐˜ฅ ๐˜ต๐˜ฉ๐˜ฆ ๐˜ง๐˜ถ๐˜ต๐˜ถ๐˜ณ๐˜ฆ ๐˜บ๐˜ฐ๐˜ถโ€™๐˜ท๐˜ฆ ๐˜ข๐˜ญ๐˜ธ๐˜ข๐˜บ๐˜ด ๐˜ช๐˜ฎ๐˜ข๐˜จ๐˜ช๐˜ฏ๐˜ฆ๐˜ฅ. ๐Ÿ—๏ธ๐Ÿšœ

09/03/2026

๐—œ๐—•๐—” ๐—”๐—ก๐—š ๐—œ๐—ก๐—›๐—œ๐—ก๐—ฌ๐—˜๐—ฅ๐—” โš™๏ธ

From classrooms and laboratories to construction sites and control rooms, women in engineering continue to prove that they can design solutions, solve real problems, and help build a better future.

This International Womenโ€™s Day, we celebrate the brilliance, courage, and dedication of every woman shaping the world through engineering.

Keep building. Keep innovating. Keep inspiring.

๐Ÿซก
04/03/2026

๐Ÿซก

HAPPY WORLD ENGINEERING DAY TO ALL ENGINEERS!

Let's celebrate the incredible contributions of Engineers worldwide towards building a better future for all.

04/03/2026

๐—”๐—ก๐—ข๐—ก๐—š ๐— ๐—š๐—” ๐—–๐—ข๐—ฆ๐—ง ๐—œ๐—ง๐—˜๐— ๐—ฆ ๐—”๐—ก๐—š ๐— ๐—”๐——๐—”๐—Ÿ๐—”๐—ฆ ๐—ก๐—” ๐—ก๐—”๐—ž๐—”๐—ž๐—”๐—Ÿ๐—œ๐— ๐—จ๐—ง๐—”๐—ก ๐—ฆ๐—” ๐—–๐—ข๐—ก๐—ฆ๐—ง๐—ฅ๐—จ๐—–๐—ง๐—œ๐—ข๐—ก ๐—–๐—ข๐—ก๐—ง๐—ฅ๐—”๐—–๐—ง๐—ฆ?

Maraming project ang nauuwi sa budget overrun o talagang nabibitin at di natatapos hindi dahil sa maling estimate kundi dahil may mga cost items na hindi naisama sa kontrata.

Kung ikaw ay contractor, owner, o nagpaplanong magpatayo, mahalagang malinaw ito bago pumirma.

1. PERMITS AT GOVERNMENT FEES

Hindi lang building permit ang babayaran. Maaaring may hiwalay na bayad para sa:

Barangay clearance
Excavation permit
Occupancy permit
Fire safety inspection fee

Madalas inaakalang kasama na ito sa contract price pero hindi pala.

2. TEMPORARY UTILITIES

Habang ongoing ang project, may mga gastusin tulad ng:

Temporary electrical connection
Rented Barracks or staging area kung masikip ang site
Temporary water supply
Generator rental

Kung walang malinaw na nakalagay sa kontrata, maaaring hindi ito kasama sa agreed price. BULAGAAN NA!!!

3. MOBILIZATION AT DEMOBILIZATION

Kasama dito ang:

Delivery ng equipment
Setup ng barracks at temporary facilities
Final site clearing at hauling ng debris

Hindi ito laging naka-breakdown pero may malaking epekto sa total cost.

4. SITE SECURITY AT SAFETY

Kasama ang:

Safety officer
Personal protective equipment ng workers
Safety signage
Security personnel

Ang compliance sa safety standards ay may katumbas na gastos.

5. SOIL TESTING AT PROFESSIONAL FEES

Maaaring hindi kasama ang:

Soil investigation
Structural design revisions
As-built plans
Consultant at professional fees

Kapag may pagbabago sa design o scope, may kaakibat itong dagdag na bayad.

6. PRICE ESCALATION NG MATERIALS

Ang presyo ng cement, steel, at fuel ay pabago-bago. Kung walang escalation clause sa kontrata, maaaring magkaroon ng hindi inaasahang dagdag gastos.

7. CHANGE ORDERS

Isa ito sa pinaka-karaniwang dahilan ng additional cost. Kapag may:

Additional works
Design changes
Upgrade ng materials

Automatic itong may katumbas na dagdag bayad.

PRO TIP

Bago pumirma ng kontrata, itanong:

Ano ang hindi kasama sa presyo?
Ano ang posibleng additional charges?
May escalation clause ba?
Paano ang proseso ng change orders?

Sa construction, hindi lang tibay ng pundasyon ang mahalaga kundi pati linaw ng kontrata. Mas mabuting malinaw ang lahat sa simula kaysa magkaroon ng problema sa huli.

27/02/2026

20/02/2026

๐‰๐”๐’๐“ ๐ˆ๐:

DOLE issues Labor Advisory No. 03, Series of 2026 on the submission of Construction Safety and Health Program through the DOLE Online Compliance Portal.

DOLE also reiterates that CSHP submissions are FREE of charge. All construction projects shall have a CSHP before the start of any construction actvity.

14/02/2026

Thank you for trusting M&C Engineering Services ๐Ÿ—๏ธ

๐Ÿ“ฉ message us for inquiries

09/02/2026

๐—œ๐—บ๐—ฝ๐—ผ๐—ฟ๐˜๐—ฎ๐—ป๐˜๐—ฒ ๐—ฏ๐—ฎ ๐—ฎ๐—ป๐—ด ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?

๐—”๐—ป๐—ผ ๐—ฎ๐—ป๐—ด ๐—บ๐—ฎ๐—ป๐—ด๐˜†๐—ฎ๐˜†๐—ฎ๐—ฟ๐—ถ ๐—ธ๐˜‚๐—ป๐—ด ๐—บ๐—ฎ๐—ด๐˜๐—ฎ๐˜๐—ฎ๐˜†๐—ผ ๐—ธ๐—ฎ ๐—ป๐—ฎ๐—ป๐—ด ๐—ช๐—”๐—Ÿ๐—”๐—ก๐—š ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?

Dapat ka na bang kabahan?

Hindi agad. But you should take it seriously. Ang building permit is not just paperwork. Itโ€™s the government saying: โ€œOkay, safe, compliant, at legal ang ipapatayo mo.โ€

Now, the first thing you should understand is simple but critical: Saan ka nagpatayo at sino ang may jurisdiction? Because enforcement and penalties usually come from your Local Government Unit (LGU), through the Office of the Building Official (OBO).

---

โœ… (a) Bakit mahalaga ang building permit?

Building permits exist for three main reasons:

โ€ข PUBLIC SAFETY โ€” Para siguradong structurally safe ang building. Hindi basta-basta guguho o magko-cause ng hazard sa occupants at neighbors.
โ€ข LEGAL COMPLIANCE โ€” Required ito under the National Building Code and local ordinances.
โ€ข ACCOUNTABILITY โ€” May record kung sino ang designer, contractor, at owner. Important ito kung may structural failure or accident.

Translation: Hindi lang ito โ€œbayad sa munisipyo.โ€ Safety + legal protection mo ito.

---

โœ… (b) Ano ang mangyayari kung nagsimula ka mag-construction nang walang permit?

Ito ang pinaka-common scenario.

Possible consequences:

๐Ÿšซ STOP WORK ORDER
Puwedeng ipahinto agad ang construction. Kahit 90% complete na, pwede pa rin ipatigil.

๐Ÿ’ธ FINES AND PENALTIES
Usually may surcharge, penalties, and back payments bago ka payagang mag-continue.

๐Ÿ“„ DEMOLITION ORDER (Worst case)
If non-compliant sa zoning, setbacks, height limits, or safety standards, puwedeng ipademolish ang structure โ€” at expense mo.

โš–๏ธ ADMINISTRATIVE OR CRIMINAL LIABILITY
Depende sa violation, puwedeng magkaroon ng case under the National Building Code or local ordinances.

---

โœ… (c) Kung residential lang naman โ€” kailangan pa ba?

Yes.

Common misconception:
โ€œBahala na, bahay ko naman.โ€

Reality:
If may ma-injure dahil sa faulty construction, puwedeng pumasok ang civil liability. If may namatay due to structural failure, puwedeng pumasok ang criminal liability.

---

โœ… (d) Risk mo kung wala kang permit beyond government penalties

Ito ang hindi masyadong napag-uusapan:

โŒ Insurance claims may be denied
โŒ Mahihirapan ka magbenta ng property
โŒ Mahihirapan ka mag-loan gamit ang property
โŒ Possible neighbor complaints โ†’ inspections โ†’ penalties

---

โœ… (e) โ€œPuwede bang i-retro permit na lang?โ€

Sometimes yes. But not guaranteed.

If pasado sa zoning + structural + safety = usually may penalties lang.
If hindi compliant = puwedeng forced modification or demolition.

---

๐Ÿ’ฅ Important reality check

Mas mahal mag-fix ng illegal construction kaysa mag-secure ng permit from the start.

Permit cost = predictable expense
Violation cost = unpredictable + legal risk + possible total loss

---

โœ… Final takeaways

A building permit is not just bureaucracy. It is:

โ€ข Safety certification
โ€ข Legal shield
โ€ข Financial protection
โ€ข Professional accountability

So before ka mag-groundbreaking, donโ€™t just ask:
โ€œMagkano ang permit?โ€

Ask:
โ€œMagkano ang risk kung wala akong permit?โ€

Because in construction, shortcuts today can become liabilities tomorrow.

08/02/2026

This image captures a classic reinforced-concrete column construction stage.

05/02/2026

Address

Puerto Princesa
5300

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm

Website

Alerts

Be the first to know and let us send you an email when M&C Engineering Services posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share