Inspired by its desire to serve clients’ satisfaction, competent management and good public relations, the company continues to grow through the years. With the acquisition of the most modern machineries and equipment, in addition to its substantial asset value, SCDC is now on a Double A “AA” contractor category.

Scaffolding, formworks, and rebar installation for the slab, beams, and stairs. Soon to be ready for concrete pouring.
25/10/2022

Scaffolding, formworks, and rebar installation for the slab, beams, and stairs. Soon to be ready for concrete pouring.

Working day and night to safely dismantle a few tower cranes on site.
06/09/2022

Working day and night to safely dismantle a few tower cranes on site.

11/06/2022

'Rebokada' or scratch coat, being applied by the mason. This serves as the binder between the wall and final plaster, to avoid cracks in the finished wall surface.

These are cold air supply ducting, currently being installed. This is part of the centralized cooling system in this com...
23/11/2021

These are cold air supply ducting, currently being installed. This is part of the centralized cooling system in this commercial project

These are photos of the slab's underside, or 'soffit'. After forms are stripped, paint markings are usually seen.These i...
16/11/2021

These are photos of the slab's underside, or 'soffit'. After forms are stripped, paint markings are usually seen.

These indicate where electrical or other MEPF lines run through, so as to avoid it being damaged by other specialty contractors, such as ceiling and the like.

This structural steel truss is needed, in order to support the roofing system that is to be installed at a later date.Th...
09/11/2021

This structural steel truss is needed, in order to support the roofing system that is to be installed at a later date.

These can be fabricated on site, or delivered directly from the fabrication yard, if space at the project is limited.

Setting up scaffoldings and initial formworks system
02/11/2021

Setting up scaffoldings and initial formworks system

Unloading of deliveries on site
26/10/2021

Unloading of deliveries on site

Night time concrete pouring
19/10/2021

Night time concrete pouring

Formworks system being installed
12/10/2021

Formworks system being installed

CHB Wall that has yet to be plastered(left) and one that has been roughly plastered (right)
05/10/2021

CHB Wall that has yet to be plastered
(left) and one that has been roughly plastered (right)

Boom-type concrete pump, for hard to reach places
28/09/2021

Boom-type concrete pump, for hard to reach places

Address

Raffles Corporate Center, Emerald Avenue, Ortigas Center
Pasig
1605

Opening Hours

Monday 8:30am - 5:30pm
Tuesday 8:30am - 5:30pm
Wednesday 8:30am - 5:30pm
Thursday 8:30am - 5:30pm
Friday 8:30am - 5:30pm

Alerts

Be the first to know and let us send you an email when Synergy Construction and Development Corporation posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share