Kyriarch Engineering

Kyriarch Engineering Excellence Through Values and Culture
(1)

Our Services:

○ PME Sign and Seal of Permit Documents, Mechanical Plans and Mechanical Certifications

○ Design, Supply and Installation of:
‣ Fire Protection System
‣ Air Conditioning System
‣ Ventilation System
‣ Refrigeration System
‣ Pumping System
‣ Air Compressor System
‣ Gasoline Station
‣ Boiler System
‣ Escalators and Elevators
‣ Generators
‣ Tower Crane/ Gondola

○ PME Certification for

Mechanical Safety and Reliability (DOLE, DENR, PEZA, LGUs)

○ Site Assessment, Project Supervision, Consultancy and other Technical Services

He is not here… for He is risen. ✝️Today, we are reminded that the story did not end at the cross. What seemed like defe...
04/04/2026

He is not here… for He is risen. ✝️

Today, we are reminded that the story did not end at the cross. What seemed like defeat became the greatest victory — a powerful reminder that hope will always rise, even in our darkest moments.

The resurrection of Christ is more than a promise — it is a living truth that brings light to our lives, restores our faith, and renews our strength.

No matter what we face, we hold on to this:
there is always hope beyond the pain, and life beyond the grave.

May this day fill our hearts with peace, joy, and unwavering faith.

He is risen indeed. 🙏

In observance of the Holy Week, please be guided by our adjusted work schedule.Kindly take note of our Work From Home se...
24/03/2026

In observance of the Holy Week, please be guided by our adjusted work schedule.

Kindly take note of our Work From Home setup and holiday office closure dates. Regular operations will resume on April 6, 2026 (Monday).

We encourage everyone to plan ahead for any transactions during this period.

Wishing you a peaceful and meaningful Holy Week. 🙏

Did You Know? A Fire Pump’s Mechanical Seal is the Heart of a Building’s Safety System. At the core of every building’s ...
23/03/2026

Did You Know? A Fire Pump’s Mechanical Seal is the Heart of a Building’s Safety System.

At the core of every building’s fire protection system is the fire pump — and like any heart, it must remain in optimal condition.

Even a small leak from a damaged mechanical seal or shaft casing should never be ignored. What may seem minor can lead to a significant drop in system pressure, directly affecting the pump’s performance. In critical situations, this loss of pressure could prevent water from reaching the highest sprinkler head when it is needed most.

This Fire Prevention Month, take time to inspect your pump rooms. The presence of water or unexplained leaks on the floor may be an early warning sign of system issues.

Because when the heart develops a leak, the entire system is at risk.

Stay proactive. Stay protected.

Design Review, Consultancy, and Revision? We got you.With Kyriarch Engineering’s expertise in MEPFPS design and construc...
17/03/2026

Design Review, Consultancy, and Revision? We got you.

With Kyriarch Engineering’s expertise in MEPFPS design and construction coordination, clients can move forward with confidence knowing their projects are backed by experienced professionals who understand both design and on-site realities.

Recently, the Kyriarch team conducted an inspection of an ongoing residential house construction project, owned by a respected businessman and art curator in the industry. The visit allowed our team to review the current construction progress, evaluate installed systems, and provide professional insights to ensure that the project aligns with engineering standards and design intent.

At Kyriarch, we don’t just design — we stay involved, guiding projects through every critical stage to ensure quality, efficiency, and long-term performance.

Because great structures are built not only with materials, but with expertise, precision, and commitment.

Excellence Through Values and Culture.

Something exciting is cooking in SM San Jose Del Monte, Bulacan.Our team recently conducted a site inspection for an upc...
16/03/2026

Something exciting is cooking in SM San Jose Del Monte, Bulacan.

Our team recently conducted a site inspection for an upcoming comfort food restaurant project set to open mid-year 2026. This project is a collaboration with our new Food and Beverage group partner, where Kyriarch Engineering will deliver the Architectural and MEPFS design for one of their well-loved restaurant brands.

From initial site walkthroughs to design planning, every step brings us closer to creating a space that blends functionality, efficiency, and a welcoming dining experience for future customers.

This marks another meaningful partnership and an exciting addition to the growing portfolio of projects under the Fields Group of Companies.

More developments soon as we turn this empty space into the next destination for great food and great experiences.

Excellence Through Values and Culture.

From plans to progress — building spaces that work.Last March 5, 2026, the Kyriarch Engineering team conducted a site vi...
14/03/2026

From plans to progress — building spaces that work.

Last March 5, 2026, the Kyriarch Engineering team conducted a site visit in Pampanga during the construction phase of our office fit-out design project, covering an impressive 2,400 sqm total floor area.

The visit allowed our team to closely coordinate with on-site personnel, review ongoing installations, and ensure that every detail aligns with the design vision and engineering standards we committed to deliver.

Projects like these are more than drawings and specifications — they are the result of collaboration, precision, and continuous on-site engagement to bring concepts into reality.

At Kyriarch Engineering, we stay hands-on throughout every stage of the project — from design development to construction implementation — ensuring quality, efficiency, and excellence at every square meter.

Excellence Through Values and Culture.

Stepping into the future of construction and innovation.Some members of the Fields Group of Companies team attended WORL...
14/03/2026

Stepping into the future of construction and innovation.

Some members of the Fields Group of Companies team attended WORLDBEX 2026, one of the Philippines’ premier exhibitions for the building and construction industry. The event brought together industry leaders, innovators, and professionals to showcase the latest technologies, materials, and trends shaping the future of infrastructure.

By participating in events like these, our team continues to expand its knowledge, explore emerging solutions, and build valuable connections within the industry.

Because growth doesn’t happen inside the office alone — it happens where ideas, innovation, and opportunity meet.

Fields Group of Companies remains committed to learning, evolving, and bringing world-class solutions to every project we undertake.

Excellence Through Values and Culture.

Work hard. Celebrate harder.Last February 12 at the KDC Office, we took a break from deadlines and deliverables to celeb...
28/02/2026

Work hard. Celebrate harder.

Last February 12 at the KDC Office, we took a break from deadlines and deliverables to celebrate something even more important — our people.

Valentine’s Day + February Birthday Celebrants = a room full of laughter, red balloons, and real team spirit.

Because at Kyriarch, culture isn’t just a word on a presentation slide — it’s moments like these. Shared meals. Genuine smiles. Teammates turning into family.

We build projects with precision.
But we build our team with heart.

Excellence Through Values and Culture — on and off the clock. ❤️🔥

Back-to-back. No breaks. No excuses. Just ex*****on.On the 3rd week of February, Kyriarch Engineering went full throttle...
27/02/2026

Back-to-back. No breaks. No excuses. Just ex*****on.

On the 3rd week of February, Kyriarch Engineering went full throttle with consecutive company presentations — engaging in high-level discussions with a construction firm and a major food group for potential strategic partnerships.

From boardroom strategies to value-driven conversations, we didn’t just present who we are — we demonstrated what we bring to the table: precision, innovation, and a culture built on excellence.

Two industries. Two opportunities. One standard.

We build partnerships the same way we build projects — solid, intentional, and built to last.

Excellence Through Values and Culture. 🚀

Price update alert!
26/02/2026

Price update alert!

UPDATED PRICELIST

Kyriarch Development Corporation provides professional and reliable Sign & Seal Blueprinting services for your project needs.

📐 Fast turnaround
📄 Quality printing
🏗 Trusted service

PROCESS:
1️⃣ Contact the Kyriarch Team and share your plans via Messenger or email at [email protected]
2️⃣ Wait for the confirmation and reply from Kyriarch
3️⃣ After payment, your printing plans are ready to transmit in as fast as one (1) day

Message us today and let’s get your plans printed!

ENGINEERS, THIS IS YOUR MOMENT.Kyriarch Engineering is officially opening its doors to the next wave of builders, thinke...
26/02/2026

ENGINEERS, THIS IS YOUR MOMENT.

Kyriarch Engineering is officially opening its doors to the next wave of builders, thinkers, and problem-solvers.

We’re not looking for spectators.
We’re looking for future Mechanical and Electrical Engineers ready to get their hands dirty, sharpen their skills, and step into the real world of engineering.

This isn’t coffee-fetching.
This is hands-on experience. Real projects. Real growth. Real impact.

If you're ready to move from classroom theory to field ex*****on — this is your shot.

Send your CV to:
[email protected]
CC: [email protected]

Build. Innovate. Engineer. Lead.

Fields Group of Companies successfully held its First General Assembly of the Year last February 4, 2026.The program com...
13/02/2026

Fields Group of Companies successfully held its First General Assembly of the Year last February 4, 2026.

The program commenced with a meaningful devotion, followed by a retrospective look at Kyriarch’s journey through the years. Key highlights of the assembly included the formal announcement of new leadership appointments, the presentation of upcoming company development programs, an engaging open forum, and an exciting staff raffle.

The gathering strengthened alignment across the organization and set a clear direction for growth, unity, and excellence for the year ahead.

Address

UG/F Sun Plaza Shaw Boulevard Cor. Princeton St. Wack-Wack Greenhills, Mandaluyong City
Mandaluyong
1550

Alerts

Be the first to know and let us send you an email when Kyriarch Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Kyriarch Engineering:

Share