Structural Sign and Seal Makati

Structural Sign and Seal Makati engineering and construction services

MABUHAY PILIPINAS! COngratulations
03/08/2024

MABUHAY PILIPINAS! COngratulations

03/07/2024

Who wants to work in Australia (Perth) with me? Looking for 5 more Structural Engineers wtih 10yrs exp knowledge in Australian code is an advantage but not reqd. pm your cv

PGSE★PinoyGlobalStructuralEngineers

28/01/2024
Why pour the design fees outside the country eh kaya naman yan ng Pinoy desin engineers!
03/10/2021

Why pour the design fees outside the country eh kaya naman yan ng Pinoy desin engineers!

A rail transit system to link parts of eastern Metro Manila with the province of Rizal is turning to reality as Transportation (DOTr) Secretary Art Tugade and the project’s Spain-based design consultant IDOM Consulting Engineering, Architecture, SA, (IDOM) are set to sign the contract agreement for the detailed architectural and engineering design of the Metro Rail Transit Line 4 (MRT-4) on Friday, 1 October 2021.

The mobilization of the project has started after the Department of Transportation issued IDOM the Notice of Award on 17 September 2021.

IDOM Consulting Engineering, Architecture, SA, as the detailed architectural and engineering design consultant (DEDC) will prepare the project's preliminary design, detailed engineering and tender designs, the loan processing documents, financial and economical assessments, the project/loan safeguards documents, and bidding documents for the MRT-4 project.

Under the agreement, IDOM is also tasked to determine the proper mode of transportation along the alignment and provide the methodology on ridership validation.

Funded by an official development assistance (ODA) from the Asian Development Bank (ADB), the MRT-4 is a proposed railway mass-transit system intended to serve and connect the eastern part of Metro Manila, including the highly-populated areas of the province of Rizal.

The railway will cut across the cities of Mandaluyong, San Juan, Quezon, Pasig, and municipalities of Cainta and Taytay in Rizal, addressing the massive traffic problem and limited road capacities in the over-populated areas of eastern Metro Manila.

Once operational, the MRT-4 project will see an uptick in employment opportunities, livelihood and business opportunities for Filipinos.

The project's design stage is slated in the 4th quarter of 2021, while the start of early works is scheduled for the 2nd quarter of 2022.

Mabuhay ka Hidilyn DIaz! Salamat! Mabuhay Pilipinas =)
27/07/2021

Mabuhay ka Hidilyn DIaz! Salamat!
Mabuhay Pilipinas =)

06/05/2021

This is incredible! The green dots on this Google Earth map represent radio stations all over the world. Click on any one of the dots and you will immediately hear that station with very good reception. Any of you who are multilingual will certainly enjoy this.

Click on the link
👉http://radio.garden/

free and to give away 13th ed aisc steel Constr manual . free delvery within 6km . note. book is 3inches
08/04/2021

free and to give away 13th ed aisc steel Constr manual . free delvery within 6km . note. book is 3inches

office brochures63 2 8 330988
23/02/2021

office brochures
63 2 8 330988

Address

Makati
1230

Alerts

Be the first to know and let us send you an email when Structural Sign and Seal Makati posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Structural Sign and Seal Makati:

Share