NKA 💡Need electrical work done?
📞Contact us today for reliable and professional service!

25/11/2025
25/11/2025

Online Monitoring of 8KW Hybrid On Grid Set Up with 5.5 Kw PV(10 pcs 550 watts Solar Panels)and Battery.

23/11/2025

Very soon
Sale of Pre-assembled Solar Set up ! Plug and Play !

First Come First Serve lang po.

From pre-assembling to delivery, installation, and finally commissioning and testing — what a journey! 💪Huge thanks to m...
13/11/2025

From pre-assembling to delivery, installation, and finally commissioning and testing — what a journey! 💪
Huge thanks to my team for the hard work and dedication that made this project a success.
Special credit to my buddy Engr. Corsino for the technical assessment and to all my men for their unwavering commitment and hard work! 👷‍♂️👏

5.5kW Solar Panel Setup ☀️
on a 8Kw Hybrid On-Grid Inverter




Another day another client!!!8 Kw Hybrid On/Off Grid Set Up .To those who also want to avail. DM us@ NKA official FB Pag...
08/11/2025

Another day another client!!!8 Kw Hybrid On/Off Grid Set Up .

To those who also want to avail. DM us@
NKA official FB Page
or call 📞09977151323



24/10/2025
✅ Installation Complete!Successfully installed a 4.5kW Shower Water Heater 💧Thank you, Ms. Terrado from La Paz, Leyte, f...
21/10/2025

✅ Installation Complete!
Successfully installed a 4.5kW Shower Water Heater 💧
Thank you, Ms. Terrado from La Paz, Leyte, for trusting our team!




Removal and replacement of outdated or non-functional electronic devices.Installation of appropriate lighting fixtures t...
21/10/2025

Removal and replacement of outdated or non-functional electronic devices.

Installation of appropriate lighting fixtures to improve operational efficiency and workplace illumination.

Testing and commissioning of all replaced and newly installed equipment to ensure full functionality.

Location: Abuyog Branch

Thank you Sir for trusting NKA!




🔌 URGENT CALL FOR TERMINATION OF SERVICE ENTRANCE Location: By-Pass Road, Utap, Tacloban CityScope of Work: Termination ...
11/10/2025

🔌 URGENT CALL FOR TERMINATION OF SERVICE ENTRANCE

Location: By-Pass Road, Utap, Tacloban City
Scope of Work: Termination of Service Entrance with Main Disconnect Rated 630AT, 3-Phase 4 Wire .

Thank you for trusting NKA Energy Solutions and Electrical Services — proudly serving from Dulag to Tacloban and beyond!




Ongoing Electrical Rewiring and TroubleshootingClient: Hon. Aliana Marie Tubi. Replacement of outdated or faulty electri...
27/09/2025

Ongoing Electrical Rewiring and Troubleshooting
Client: Hon. Aliana Marie Tubi.

Replacement of outdated or faulty electrical wiring to ensure compliance with current electrical codes and safety standards.
Installation of new circuit breakers, outlets, and switches where necessary.




Address

Brgy. Tabu
Dulag
6505

Website

Alerts

Be the first to know and let us send you an email when NKA posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share