07/05/2025
Kupler Industries, Inc - ONGOING PROJECTS ๐
PROJECT : SUPPLY OF LABOR AND MATERIALS FOR THE CONSTRUCTION OF 69KV LINE FOM NGCP LAPAD PHASE A TO NATIONAL HIGHWAY, POB. LAGUINDINGAN ๐ก๐
PROGRESS: 90% COMPLETE
SCOPE OF WORKS:
Supplied and Installed the following -
* Pole, Steel, 80', Bare-4.0mm (Two Section), 86 micron, 1200kgs (Minimum Load Break)
* Pole, Steel, 90', Class 1, 2000 kgs (Two Section) (Minimum Load Break)
* Pole, Steel, 50', Bare-4.0mm (Two Section), 86 micron, 1200kgs (Minimum Load Break)
* Pole, Steel, 55', Bare-4.0mm (Two Section), 86 micron, 1200kgs (Minimum Load Break)
* Pole, Steel, 70, Bare-5.0mm (Two Section), 86 micron, 1200kgs (Minimum Load Break)
* Pole, Steel, 75, Bare-4.0mm (Two Section), 86 micron, 1200kgs (Minimum Load Break)
* Conductor Bare, ACSR #2, AWG 6/1 (Meters)
* Conductor Bare, ACSR #795, MCM (Meters)
* Disconnect Switch with Earthing Switch, Center Break Type 69KV, Vertical Orientation
* and other POLE LINE HARDWARES
CONTACT US NOW!
Sales:
๐0951-417-4621
๐0917-625-5303
or Email us at:
๐จ[email protected]
Located at:
๐Sobrecary St. Corner Nidea St. Barrio Obrero, Davao City