๐๏ธ ๐๐๐๐๐๐๐ ๐๐๐๐๐๐๐๐๐๐๐๐ DESIGN & BUILD PROCESS (Step-by-Step guide on what to expect when you engage our construction services)
1. Project Inquiry & Client Briefing
โข Meet client and gather requirements:
โข Purpose (residential, commercial, fit-out, etc.)
โข Budget range
โข Lot details / unit size
โข Target completion date
โข Site inspection (if applicable)
โข Initial feasibility check (zoning, access, utilities)
๐ Output:
โข Project brief
โข Rough budget range
โธป
2. Conceptual Design Phase
โข Prepare:
โข Space planning
โข Initial layout / floor plans
โข Basic 3D perspective (optional but recommended)
โข Align design with budget (very important in D&B)
๐ Output:
โข Concept drawings
โข Initial cost estimate (ROM โ Rough Order of Magnitude)
โธป
3. Design Development
โข Refine approved concept:
โข Architectural plans (detailed)
โข Structural concept
โข Basic MEPF (Mechanical, Electrical, Plumbing, Fire)
โข Material selection (tiles, finishes, fixtures)
๐ Output:
โข Developed drawings
โข Updated cost estimate (more accurate)
โธป
4. Detailed Engineering & Construction Drawings
โข Complete full set of plans:
โข Architectural
โข Structural (with calculations)
โข Electrical layout
โข Plumbing & sanitary
โข Fire protection
โข Coordination between all disciplines (avoid clashes)
๐ Output:
โข Issued-for-permit drawings
โข Detailed Bill of Quantities (BOQ)
โธป
5. Permits & Approvals
โข Secure permits based on local codes (e.g. following National Building Code of the Philippines):
โข Building permit
โข Electrical permit
โข Sanitary/plumbing permit
โข Fire safety clearance
โข Liaise with LGU and regulatory agencies
๐ Output:
โข Approved permits
โข Authority to construct
โธป
6. Final Costing & Contract Signing
โข Submit:
โข Final quotation (based on detailed plans)
โข Project timeline (Gantt chart)
โข Agree on:
โข Payment terms (mobilization, progress billing)
โข Scope of work
โข Contract signing
๐ Output:
โข Signed Design & Build Agreement
โธป
7. Pre-Construction Phase
โข Mobilization planning:
โข Site clearing
โข Temporary facilities
โข Safety setup
โข Procurement of materials
โข Final scheduling
๐ Output:
โข Construction schedule
โข Mobilization readiness
โธป
8. Construction Phase
Typical sequence:
1. Site works / excavation
2. Foundation
3. Structural works
4. Masonry
5. Roofing
6. MEPF installation
7. Finishes (tiles, paint, ceiling, etc.)
8. Fixtures & equipment
โข Continuous:
โข Quality control
โข Cost monitoring
โข Progress reporting
๐ Output:
โข Physical project completion (substantial)
โธป
9. Testing, Commissioning & Punchlisting
โข Test systems:
โข Electrical
โข Plumbing
โข HVAC (if any)
โข Identify defects (punchlist)
โข Rectify issues
๐ Output:
โข Completed, functional project
โธป
10. Project Turnover
โข Deliver:
โข As-built plans
โข Warranties
โข Operation manuals
โข Final inspection with client
๐ Output:
โข Turnover certificate
โข Project acceptance
โธป
11. Post-Construction Support
โข Warranty period (typically 6โ12 months)
โข Maintenance support if included