๐Ÿ—๏ธ ๐Œ๐„๐†๐–๐€๐‘๐ƒ ๐‚๐Ž๐๐’๐“๐‘๐”๐‚๐“๐ˆ๐Ž๐ DESIGN & BUILD PROCESS (Step-by-Step guide on what to expect when you engage our construction services)

1. Project Inquiry & Client Briefing
โ€ข Meet client and gather requirements:
โ€ข Purpose (residential, commercial, fit-out, etc.)
โ€ข Budget range
โ€ข Lot details / unit size
โ€ข Target completion date
โ€ข Site inspection (if applicable)
โ€ข Initial feasibility check (zoning, access, utilities)

๐Ÿ‘‰ Output:
โ€ข Project brief
โ€ข Rough budget range

โธป

2. Conceptual Design Phase
โ€ข Prepare:
โ€ข Space planning
โ€ข Initial layout / floor plans
โ€ข Basic 3D perspective (optional but recommended)
โ€ข Align design with budget (very important in D&B)

๐Ÿ‘‰ Output:
โ€ข Concept drawings
โ€ข Initial cost estimate (ROM โ€“ Rough Order of Magnitude)

โธป

3. Design Development
โ€ข Refine approved concept:
โ€ข Architectural plans (detailed)
โ€ข Structural concept
โ€ข Basic MEPF (Mechanical, Electrical, Plumbing, Fire)
โ€ข Material selection (tiles, finishes, fixtures)

๐Ÿ‘‰ Output:
โ€ข Developed drawings
โ€ข Updated cost estimate (more accurate)

โธป

4. Detailed Engineering & Construction Drawings
โ€ข Complete full set of plans:
โ€ข Architectural
โ€ข Structural (with calculations)
โ€ข Electrical layout
โ€ข Plumbing & sanitary
โ€ข Fire protection
โ€ข Coordination between all disciplines (avoid clashes)

๐Ÿ‘‰ Output:
โ€ข Issued-for-permit drawings
โ€ข Detailed Bill of Quantities (BOQ)

โธป

5. Permits & Approvals
โ€ข Secure permits based on local codes (e.g. following National Building Code of the Philippines):
โ€ข Building permit
โ€ข Electrical permit
โ€ข Sanitary/plumbing permit
โ€ข Fire safety clearance
โ€ข Liaise with LGU and regulatory agencies

๐Ÿ‘‰ Output:
โ€ข Approved permits
โ€ข Authority to construct

โธป

6. Final Costing & Contract Signing
โ€ข Submit:
โ€ข Final quotation (based on detailed plans)
โ€ข Project timeline (Gantt chart)
โ€ข Agree on:
โ€ข Payment terms (mobilization, progress billing)
โ€ข Scope of work
โ€ข Contract signing

๐Ÿ‘‰ Output:
โ€ข Signed Design & Build Agreement

โธป

7. Pre-Construction Phase
โ€ข Mobilization planning:
โ€ข Site clearing
โ€ข Temporary facilities
โ€ข Safety setup
โ€ข Procurement of materials
โ€ข Final scheduling

๐Ÿ‘‰ Output:
โ€ข Construction schedule
โ€ข Mobilization readiness

โธป

8. Construction Phase

Typical sequence:
1. Site works / excavation
2. Foundation
3. Structural works
4. Masonry
5. Roofing
6. MEPF installation
7. Finishes (tiles, paint, ceiling, etc.)
8. Fixtures & equipment

โ€ข Continuous:
โ€ข Quality control
โ€ข Cost monitoring
โ€ข Progress reporting

๐Ÿ‘‰ Output:
โ€ข Physical project completion (substantial)

โธป

9. Testing, Commissioning & Punchlisting
โ€ข Test systems:
โ€ข Electrical
โ€ข Plumbing
โ€ข HVAC (if any)
โ€ข Identify defects (punchlist)
โ€ข Rectify issues

๐Ÿ‘‰ Output:
โ€ข Completed, functional project

โธป

10. Project Turnover
โ€ข Deliver:
โ€ข As-built plans
โ€ข Warranties
โ€ข Operation manuals
โ€ข Final inspection with client

๐Ÿ‘‰ Output:
โ€ข Turnover certificate
โ€ข Project acceptance

โธป

11. Post-Construction Support
โ€ข Warranty period (typically 6โ€“12 months)
โ€ข Maintenance support if included

๐Œ๐ž๐ ๐ฐ๐š๐ซ๐ ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ongoing fit-out/renovation project @ 2 Regis, The Upper East, Megaworld.   From Planning to Impleme...
28/03/2026

๐Œ๐ž๐ ๐ฐ๐š๐ซ๐ ๐‚๐จ๐ง๐ฌ๐ญ๐ซ๐ฎ๐œ๐ญ๐ข๐จ๐ง ongoing fit-out/renovation project @ 2 Regis, The Upper East, Megaworld.





From Planning to Implementation, from Start to Finish; Experience professional construction here at Megward Construction.
๐’๐„๐‘๐•๐ˆ๐‚๐„๐’:
๐ŸŸข Consultation (w/site visit) & Estimates
๐ŸŸข Architectural Designs & Concepts
๐ŸŸข Plans (w/sign&seal) & Permitting
๐ŸŸข Post Construction Permitting (Occupancy Permits)
๐ŸŸข Structural Analysis
๐ŸŸข New Construction and Renovation
๐ŸŸข Surveying Services
๐ŸŸข Solar Installations
๐ŸŸข Construction Materials Supplier
๐•๐ข๐ฌ๐ข๐ญ/๐‚๐จ๐ง๐ญ๐š๐œ๐ญ ๐ฎ๐ฌ:
๐Ÿ“ Hilado St., Bacolod City, Neg. Occ.
๐Ÿ“ง [email protected]
๐Ÿ‡ซ Megward Construction
โ–ถ Megward Construction
๐ŸŒ www.megwardconstruction.com
โ˜Ž (034) 467-8120
๐Ÿ“ฑ 09624928921

06/02/2026

Ano ang Soil Bearing Capacity?

๐Ÿ‘‰ Simpleng paliwanag

Ang soil bearing capacity ay ang bigat na kayang buhatin ng lupa nang hindi ito lumulubog, bumibigay, o nagkaka-problema.

Sa madaling salita:

Gaano kabigat ang kayang pasanin ng lupa sa ilalim ng bahay.

โธป

๐Ÿงโ€โ™‚๏ธ Simpleng halimbawa

Isipin mo ito:
โ€ข Nakatayo ka sa semento โ†’ hindi ka lulubog
โ€ข Nakatayo ka sa putik โ†’ lulubog ka

๐Ÿ‘‰ Ibig sabihin, mahina ang putik, matibay ang semento.
Ganyan din ang lupa sa ilalim ng bahay.

โธป

๐Ÿ  Bakit mahalaga ito sa bahay?

Kung masyadong mabigat ang bahay at mahina ang lupa:
โ€ข Lulubog ang pundasyon
โ€ข Magkakaroon ng bitak ang pader at sahig
โ€ข Tabingi ang bahay
โ€ข Mahirap buksan ang pinto at bintana

โธป

๐Ÿงฑ Paano inaayos ng engineer?

Kung mahina ang lupa, puwedeng:
โ€ข Palakihin ang footing (mas malapad ang pundasyon)
โ€ข Palalimin ang pundasyon
โ€ข Palitan ang uri ng pundasyon (raft o piles)

๐Ÿ‘‰ Para hatiin ang bigat at hindi magsiksikan sa lupa.

โธป

๐ŸŒ Anong lupa ang matibay, anong mahina?

Uri ng lupa Lakas
Bato / rock ๐Ÿ’ช๐Ÿ’ช๐Ÿ’ช Pinaka-matibay
Graba ๐Ÿ’ช๐Ÿ’ช
Buhangin ๐Ÿ’ช
Luad / clay ๐Ÿ˜
Malambot na putik โŒ Mahina

โธป

โš ๏ธ Ano mangyayari kung hindi ito sinuri?
โ€ข Bitak sa pader
โ€ข Lumulubog ang bahay
โ€ข Sayang ang gastos sa repair
โ€ข Delikado sa katagalan

โธป

๐Ÿ’ก Simpleng tandaan

Kahit gaano katibay ang bahay, kung mahina ang lupaโ€”may problema.

30/01/2026

๐Ÿงฑ ๐‚๐Ž๐๐‚๐‘๐„๐“๐„ ๐‚๐Ž๐•๐„๐‘ - ๐๐ฎ๐ซ๐ฉ๐จ๐ฌ๐ž ๐š๐ง๐ ๐Œ๐ข๐ง๐ข๐ฆ๐ฎ๐ฆ ๐•๐š๐ฅ๐ฎ๐ž๐ฌ

Concrete cover is the clear distance from the surface of reinforcing steel to the concrete surface.
It is not just a detailing requirement โ€” it is a durability and safety requirement.

โœ… Purpose of Concrete Cover

๐Ÿ”น Corrosion Protection
โ€ข Protects steel reinforcement from moisture, chlorides, carbonation, and other environmental agents that cause corrosion. ๏ฟผ

๐Ÿ”น Fire Resistance
โ€ข Provides thermal insulation to the steel in fire conditions, helping maintain structural capacity longer during fire exposure. ๏ฟผ

๐Ÿ”น Bond and Anchorage
โ€ข Ensures sufficient bond between concrete and steel for effective stress transfer (shear and tension). ๏ฟผ

๐Ÿ”น Durability and Service Life
โ€ข Adequate cover helps the structure achieve its intended service life with reduced maintenance needs. ๏ฟผ

๐Ÿ“ MINIMUM CONCRETE COVER REQUIREMENTS as per National Structural Code of the Philippines (NSCP)
(See attached infographic)

๐Ÿ“Œ Important Notes

๐Ÿ”น Larger bar diameters require larger concrete cover
๐Ÿ”น Bundled bars require cover based on the equivalent bundle diameter
๐Ÿ”น More aggressive environments may require additional cover
๐Ÿ”น Insufficient cover = corrosion, spalling, and reduced service life

โธป

๐Ÿง  Proper Concrete Cover = durable and safe structures
๐Ÿ“˜ Always follow NSCP minimum requirements โ€” they are minimums, not suggestions.

How to address set back violation and get approved for occupancy permit. 1. What happens if building setbacks were not f...
23/01/2026

How to address set back violation and get approved for occupancy permit.

1. What happens if building setbacks were not followed?

A. It is a zoning and building code violation

Failure to follow setbacks violates:
โ€ข NBCP (PD 1096) โ€“ Building Code
โ€ข IRR of PD 1096
โ€ข Local Zoning Ordinance / CLUP
โ€ข Often Fire Code (RA 9514) if fire clearances are affected

This is not a minor issue because setbacks relate to:
โ€ข Fire safety access
โ€ข Light and ventilation
โ€ข Emergency egress
โ€ข Right-of-way and neighboring property rights

โธป

B. Typical consequences

Depending on LGU and severity:
1. Notice of Violation (NOV) from the OBO
2. Stop-use or non-issuance of Occupancy Permit
3. Administrative fines and penalties
4. Requirement to revise plans or demolish portions
5. In severe cases: Condemnation or court action

โš ๏ธ Important:
Even if the building is structurally safe, no Occupancy Permit = legally unusable (no business permit, water, power issues, no bank financing).

โธป

2. Can you still get an Occupancy Permit?

๐Ÿ‘‰ Yes, but NOT automatically.
There are only limited legal paths, depending on how serious the setback violation is.

โธป

3. Legal options to resolve setback violations

OPTION 1: Apply for a Revised As-Built Plan (Most common first step)

Process:
1. Hire an Architect / Engineer to prepare AS-BUILT plans
2. Submit revised plans to OBO showing:
โ€ข Actual setbacks
โ€ข Encroachments
โ€ข Fire safety compliance
3. OBO evaluates if the violation is:
โ€ข Minor and tolerable, or
โ€ข Critical and unsafe

โœ… Works if:
โ€ข Violation is small (e.g., few centimeters)
โ€ข Does NOT affect fire access or public safety
โ€ข No encroachment on public property

โŒ Will fail if:
โ€ข Setback is required but none was provided
โ€ข Firewalls/openings violate Fire Code
โ€ข Structure encroaches on RROW or easement

โธป

OPTION 2: Variance or Exception (Zoning-based remedy)

You may apply for a Variance from the Local Zoning Board.

โœ… Possible only if:
โ€ข You prove hardship not self-created
โ€ข No adverse impact on neighbors
โ€ข Supported by technical justification
โ€ข Endorsed by CPDO and approved by SB

โŒ Usually denied if:
โ€ข Owner knowingly ignored setbacks
โ€ข Residential area with strict zoning
โ€ข Fire safety is compromised

โš ๏ธ Variance is not a right, it is a privilege.

โธป

OPTION 3: Partial demolition / alteration (Most painful but safest)

If violation is non-negotiable:
โ€ข Demolish encroaching portion
โ€ข Modify openings, firewalls, projections
โ€ข Restore required setbacks
โ€ข Reinspect and reapply for Occupancy Permit

This is often required when:
โ€ข Setback = fire clearance
โ€ข Adjacent property is affected
โ€ข Public safety is involved

โธป

OPTION 4: Payment of fines only (Rare and LGU-dependent)

Some LGUs allow:
โ€ข Payment of penalties
โ€ข Technical justification
โ€ข Fire clearance approval

โš ๏ธ This is NOT guaranteed and not legally consistent nationwide.
Never assume fines alone will solve the issue.

โธป

4. What will NOT work โŒ
โ€ข โ€œItโ€™s already built, so approve itโ€
โ€ข Backdating permits
โ€ข Political endorsement without technical basis
โ€ข Occupying the building without permit (this worsens penalties)

โธป

5. Step-by-step recommended approach
1. Request a formal inspection from OBO
2. Identify exact setback violations (quantify them)
3. Prepare As-Built Plans
4. Coordinate with:
โ€ข OBO
โ€ข CPDO (Zoning)
โ€ข BFP (Fire Clearance)
5. Determine:
โ€ข If variance is possible
โ€ข If alteration is required
6. Comply โ†’ Reinspect โ†’ Apply for Occupancy Permit

โธป

6. Professional advice (important)

If setbacks were violated:
โ€ข Involve both an Architect and Civil Engineer
โ€ข Early coordination with OBO and BFP saves time
โ€ข Do not proceed blindlyโ€”each LGU applies rules differently

What happens if you revised the approved building plans during actual construction?  How do you get an occupancy permit ...
20/01/2026

What happens if you revised the approved building plans during actual construction?

How do you get an occupancy permit if the actual construction is not according to plan?

These are the common questions of home owners who, for some reason, initiated major revisions during the construction phase. No worries, there are legitimate work arounds if you find yourself in this situation.

Below is a clear, practical explanation, framed in the Philippine building permit / occupancy permit context, since thatโ€™s where most issues arise.

โ“ What if the approved plan was NOT followed?

Legal effect of a revision
โ€ข The original Building Permit no longer fully applies
โ€ข The LGU (OBO) considers the unapproved portions as unauthorized construction
โ€ข You must submit a Revised Building Permit (As-Built or Amended Plans)

โš ๏ธ If you donโ€™t revise:
โ€ข You cannot legally obtain an Occupancy Permit
โ€ข You may face fines, penalties, or correction orders

โœ”๏ธ You can still get an Occupancy Permit
โŒ BUT only after submitting AS-BUILT / REVISED PLANS

There are no shortcuts.

๐Ÿ“ What must be done?

1๏ธโƒฃ Compare approved plans vs actual construction
2๏ธโƒฃ Prepare AS-BUILT / REVISED PLANS
3๏ธโƒฃ Structural re-analysis & safety certification
4๏ธโƒฃ Apply for Revised Building Permit (with penalties if applicable)
5๏ธโƒฃ Secure FSIC from BFP
6๏ธโƒฃ Apply for Occupancy Permit

โธป

โš ๏ธ Why this is important

โŒ No Occupancy Permit =
โ€ข No legal use of the building
โ€ข No business permit
โ€ข No insurance or bank approval
โ€ข Risk of violation or closure

โธป

โœ… Professional tip

As-built plans are not optional โ€” they are your legal protection.
Never ask engineers to โ€œjust sign.โ€ Safety and accountability matter.

โธป

๐Ÿ“Œ Planning to revise or already built differently?
Consult your Architect & Structural Engineer early to avoid costly corrections later.

๐Ÿ‘‰ Follow our page for more engineering + construction tips explained simply ๐Ÿ’ก

Skip the hassle of planning and permitting for your new home.  Megward Construction is your one-stop shop for your const...
18/01/2026

Skip the hassle of planning and permitting for your new home. Megward Construction is your one-stop shop for your construction related concerns.

From Planning to Implementation, from Start to Finish; Experience professional construction here at Megward Construction.
๐’๐„๐‘๐•๐ˆ๐‚๐„๐’:
๐ŸŸข Consultation (w/site visit) & Estimates
๐ŸŸข Architectural Designs & Concepts
๐ŸŸข Plans (w/sign&seal) & Permitting
๐ŸŸข Post Construction Permitting (Occupancy Permits)
๐ŸŸข Structural Analysis
๐ŸŸข New Construction and Renovation
๐ŸŸข Surveying Services
๐ŸŸข Solar Installations
๐ŸŸข Construction Materials Supplier
๐•๐ข๐ฌ๐ข๐ญ/๐‚๐จ๐ง๐ญ๐š๐œ๐ญ ๐ฎ๐ฌ:
๐Ÿ“ Hilado St., Bacolod City, Neg. Occ.
๐Ÿ“ง [email protected]
๐Ÿ‡ซ Megward Construction
โ–ถ Megward Construction
๐ŸŒ www.megwardconstruction.com
โ˜Ž (034) 467-8120
๐Ÿ“ฑ 09624928921

A carefully thought 3 Bedroom, 2 Storey Residential plan for a client in Bacolod.From Planning to Implementation, from S...
18/01/2026

A carefully thought 3 Bedroom, 2 Storey Residential plan for a client in Bacolod.

From Planning to Implementation, from Start to Finish; Experience professional construction here at Megward Construction.
๐’๐„๐‘๐•๐ˆ๐‚๐„๐’:
๐ŸŸข Consultation (w/site visit) & Estimates
๐ŸŸข Complete Set of Plans w/ Sign & Seal
๐ŸŸข Building Permit Assistance
๐ŸŸข Post Construction Permitting (Occupancy Permits)
๐ŸŸข Structural Analysis
๐ŸŸข New Construction and Renovation Contractor
๐ŸŸข Surveying Services
๐ŸŸข Solar Installations
๐ŸŸข Construction Materials Supplier
๐•๐ข๐ฌ๐ข๐ญ/๐‚๐จ๐ง๐ญ๐š๐œ๐ญ ๐ฎ๐ฌ:
๐Ÿ“ Hilado St., Bacolod City, Neg. Occ.
๐Ÿ“ง [email protected]
๐Ÿ‡ซ Megward Construction
โ–ถ Megward Construction
๐ŸŒ www.megwardconstruction.com
โ˜Ž (034) 467-8120
๐Ÿ“ฑ0962-4928921

11/01/2026

Ground Beam and initial columns for one of our 2-storey mixed occupancy project. Ground beams are used for lateral stability during earthquakes and wind forces. When designed properly, it can also act as a load-bearing beam to support concrete walls instead of wall footing.

09/01/2026

Cement Types and Uses

๐Ÿ—๏ธ ASTM C150 โ€“ Portland Cement

(Traditional cement)

๐Ÿ”น Type I โ€“ General Use
โœ” Beams, slabs, columns, pavements

๐Ÿ”น Type II โ€“ Moderate Sulfate Resistance
โœ” Foundations, moderate sulfate soils

๐Ÿ”น Type III โ€“ High Early Strength
โœ” Precast, fast-track works, repairs

๐Ÿ”น Type IV โ€“ Low Heat
โœ” Dams, large raft foundations

๐Ÿ”น Type V โ€“ High Sulfate Resistance
โœ” Marine works, sewage plants

โธป

๐ŸŒฑ ASTM C595 โ€“ Blended Cement

(Most common in modern construction)

๐Ÿ”น Type IP (Pozzolan / PPC)
โœ” Buildings, mass concrete, reduced cracking

๐Ÿ”น Type IS (Slag / PSC)
โœ” Coastal structures, basements

๐Ÿ”น Type IL (Limestone)
โœ” General construction, low-carbon concrete

๐Ÿ”น Type IT (Ternary Blend)
โœ” High durability, sustainable projects

โธป

โš™๏ธ ASTM C1157 โ€“ Performance Cement

(Performance-based, flexible composition)

โœ” GU โ€“ General use
โœ” HE โ€“ High early strength
โœ” MS / HS โ€“ Sulfate resistance
โœ” LH / MH โ€“ Low or moderate heat

โธป

๐Ÿงฑ ASTM C91 โ€“ Masonry Cement

โœ” CHB laying & plastering
โŒ Not for reinforced concrete

โธป

โœ… Professional Tip

ASTM C595 and C1157 cements are preferred today due to better durability, lower heat, and sustainability.

08/01/2026

๐Ÿ—๏ธ ๐’๐“๐‘๐”๐‚๐“๐”๐‘๐€๐‹ ๐’๐“๐„๐„๐‹ ๐†๐‘๐€๐ƒ๐„๐’ & ๐“๐‡๐„๐ˆ๐‘ ๐”๐’๐„๐’

(Quick Guide for Construction & Engineering)

Not all steel is the same. Choosing the right structural steel grade affects strength, safety, cost, and constructability.

โœ… Quick Tip for Engineers
Most modern buildings use Fy = 345 MPa (Grade 50) because it offers the best balance of strength, economy, and weldability.

๐Ÿ“Œ Remember:
Higher strength steel is not always betterโ€”proper design and detailing matter more than strength alone.






Address

Hilado Street , Brgy. Villamonte
Bacolod City
6100

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Telephone

+639108242224

Website

Alerts

Be the first to know and let us send you an email when Megward Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Megward Construction:

Share