12/02/2026
Before the panels. Before the finish. This is the work that made it possible.
Our team manufactured and installed the balustrade frames at Parakiore Christchurch Recreation and Sport Centre. Large, heavy frames installed across multiple levels of the Atrium.
With limited access and tight tolerances, a spider crane was used throughout the space to lift each frame into position. Every install required precision, coordination and clear communication to ensure perfect alignment.
Once the frames were locked in, the compact laminate panels followed, transforming structure into the clean architectural feature you now see.