04/09/2026
Pre-pipe done right.
This is where the whole job gets decided — long before tiling, gib, or fixtures go in. Every valve set to height, every outlet centred off the setout, hot and cold exactly where the tapware needs it.
Rush this stage and you’re chasing problems for the rest of the build. Get it right and everything downstream just works.
Setout on the wall, laser level running, every rough-in checked before it’s locked in behind the gib.
The part no one sees in the finished bathroom — the part that makes or breaks it.