information about Gelun Hydropower Project (3.2MW) and others
(8)
Address
Kathmandu
General information
Excellent 1. SAILENT FEATURES OF GELUN KHOLA SMALL HYDROPOWER PROJECT: 1 Project Location Development Region : Central Zone : Bagmati District : Sindhupalchowk Intake Site : Ghiche, Hagam VDC Powerhouse Site : Simle, Baramchi VDC Geological Coordinates Latitude : 27o49’30”N to 27o50’40”N Longitude : 85o46’30”N to 85o49’15”N 2 General Name of River : GelunKhola Nearest Town : Baramchi Bazaar Type of Scheme : Run-of-river Gross Head : 783.9 m Rated Net Head : 733.18 m Installed Capacity : 3200 kW Net Average Annual Energy : 17.103GWh 3 Hydrology Catchment Area : 10.5 Km2 Mean Annual Discharge : 0.74 m3/s Design Discharge : 0.51 m3/s Probability of Exceedance : 40 % Design Flood Discharge : 52 m3/s (100 Yr. flood) 4 Diversion Weir Type of Weir : Free Overflow Gravity Type Length of Weir : 13.0 m Height of Overflow Weir : 2.5 m (Excluding Foundation) Weir Crest Level : 1,655.5 m Top Level of Wing Wall : 1,658.0 m 5 Intake 1.GelunKhola Side Intake Size (L x H) : 1m x 0.8 m (1 No.) Sill Level :1,670.65 m 2. GhichheKhola: Bottom Rack/Tyrolean: Size (L x B) : 3m x 1.5 m Crest Elevation : 1,680.00 m 3.SimGhattaKhola Bottom Rack/Tyrolean Size (L x B) : 2 m x 1 m Crest Elevation : 1,658.00 m 6 Gravel Trap/Approach Culvert/Emergency Spillway Type of Gravel Trap :RCC Rectangular Dimension (L x B x H) m : 8.0 m x 1.6 m x 2.19 m Particle Size to be Settled : 5 mm Length of approach Canal : 45.00m Size (B x H) : 0.9 m x 1.3 m Crest Length of Spillway : 6.0 m Crest Elevation : 1,671.38 m 7 Desilting Basin Type : Hopper Type No of Chamber : 2 Dimension (L x B x H) m : 30.0 m x 3.15 m x 2.50 m Particle Size to be Settled : 0.15 mm 8 Headrace Pipe Type : Supported Steel Pipe Length : 2680 m Diameter: :0.638 m(CH-0+000.00 to 0+904.80) :0.628 m(CH-0+904.80 to 2+024.20) : 0.618m(CH-2+024.20 to 2+680.00) Thickness : 6 mm 9 Forebay--- Type : Rectangular Size (L x W x H) : 9.0 m x4.0 m x 5.0 m Normal Water Level : 1,645.60 m 10 Penstock Type : Supported Steel Lined Length : 2586.80 m (Excluding Bifurcation) Diameter :0.560 m(CH-0+000.00 to 1+647.20) : 0.522m(CH-1+647.20 to 2+204.00) : 0.508m(CH-2+204.00 to 2+586.80) Thickness : 6 –26 mm 11 Powerhouse Type : Surface Size (L x B x H) : 20.5 m x 9.0 m x 10.85 m 12 Tailrace Canal Type : Rectangular RCC Length : 42.5 m Size (W x H) : 1.0 m x 0.6 m 13 Turbine Type : Horizontal Axis Pelton Number : Two Rated Output Capacity per Unit : 1,700 kW Efficiency : 90 % 14 Governor Type : Electro-hydraulic with PID System, Adjustment for Speed Droop : Between 0 to 5% 15 Generator Type : Synchronous, Three phase Rated output capacity per unit : 2,000 kVA Power factor : 0.80 Voltage : 6.6 kV Frequency : 50 Hz. No of units : Two Efficiency : 96.0 % 16 Transformer Rated capacity : 4,200 kVA Three Phase x 1 Voltage ratio : 6.3/ 33 kV Efficiency : 99 % 17 Transmission Line Voltage level : 33 kV Length (approx.) : 12 Km From : Powerhouse (HEP) To : Chautara Sub-Station Conductor : ACSR "DOG" 18 Project Cost Estimate Total Project Cost with Interest : NRs. 49,58,23,000.00 Project Cost without Interest : NRs. 45,39,76,000.00 Loan Approved (with CEDBL on 2069/06/24) : NRs. 34,50,00,000.00 Annual Project Income : NRs. 9,04,00,000.00
Opening Hours
| Monday | 10:00 - 17:00 |
| Tuesday | 10:00 - 17:00 |
| Wednesday | 10:00 - 17:00 |
| Thursday | 10:00 - 17:00 |
| Friday | 10:00 - 17:00 |
| Sunday | 10:00 - 17:00 |
Website
Alerts
Be the first to know and let us send you an email when Gelun Khola Hydropower Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.
Contact The Business
Send a message to Gelun Khola Hydropower Project: