21/10/2026
🎥 Mission-Critical North Sea Intervention — Inside a 14" MORGRIP® Diverless Project 🌊
2 off 14" MORGRIP® 3000Ri Diverless Connectors were successfully installed in the North Sea as part of a subsea pipeline intervention involving the installation of a new subsea isolation valve.
In this short interview, Chris Matthews, Senior Design Engineer at Connector Subsea Solutions, takes us through the journey from design, Factory Acceptance Testing (FAT) and System Integration Testing (SIT) to offshore installation — including how field experience, software support and collaboration feed back into future improvements.
▶️ Watch the full video to hear Chris take us through the project.
📩 Have a pipeline intervention requirement? visit our website at www.connectorsubsea.com