FortisBuilt Construction

FortisBuilt Construction Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from FortisBuilt Construction, Engineering service, Kano.

FortisBuilt Construction Company was founded on the principles of delivering progressive solutions, fostering strong client relationships, and driving industry advancements.

20/11/2025

Celebrating my 14th year on Facebook. Thank you for your continuing support. I could never have made it without you. 🙏🤗🎉

20/11/2025

Filling Station at a good location
Sheik Jafar Road Dorayi Kano going for just 650 Million Naira

02/11/2025

LAND FOR SALE

Location: Shereti District (After Kabusa)Abuja.

Purpose: Mixed Use (Comprehensive Development).
Title: FCDA R of O (Handy).
Size: 103.32 Hectares.
Value: ₦10B (Slightly Negotiable)

Facilitators fees 5%

The land can be accessed through Apo/Kabusa or Pyakasa Airport Road. It is flat, with no rocks, no encroachment, and no village habitation. This is a direct and deliverable brief with no stories.

03/07/2025

Renewed Hope Estate

Your Dream Home Awaits!!! 🏡

Are you ready to own your dream home? Look no further than Renewed Hope Estate! We offer a range of stunning properties at affordable prices, with flexible payment plans to suit your budget.

Our Properties:
- 3-Bedroom Bungalow: N55 million
- 4-Bedroom Bungalow: N65 million
- 3-Bedroom Terrace Duplex: N70 million
- 4-Bedroom Fully Detached Duplex: N100 million

Flexible Payment Plans:

- 20% down payment, balance spread over 12 months
- 25% down payment, balance spread over 15 months
- 35% down payment, balance spread over 18 months

Apply Now and Make Your Dream a Reality!Don't miss out on this opportunity to own your perfect home. Contact us today @ +2347013957554 to learn more and apply for your preferred property.

18/06/2025

Basics of Civil Engineering

1. Height of 1 story in building = 3.15m.
2. Height of Parapet wall should be 1m.
3. Height of window = 2.1m.
4. Minimum thickness of slab = 125mm.
5. Minimum thickness of lintel = 15cm.
6. Thickness of DPC = 2.5cm.
7. Maximum diameter of the bars used for lapping is 36mm.
Bars having more than this diameter are not allowed.
8. Minimum diameter of bars used in Slab = 8mm.
9. Minimum diameter of bars used in Column = 12mm.
10. Minimum number of bars used in Square or Rectangular Column=4 bars.
11. Minimum number of bars used in Circular Column 6 bars
12. Maximum diameter of bars used in Slab = 1/8 x thickness of slab.
13. Maximum Chair spacing=1m.
14. Chairs minimum of 12 mm diameter bars to be used.
15. Minimum diameter used for Dowels Bars is 12mm.
16. Longitudinal reinforcement should not be less than 0.8% and not be more than 6% of gross area of cross section.
17. Binding wire required in steel reinforcement is 8kg per MT
18. Weight of cement baq = 50kg.
19. 1 bag of cement = 1.22 cubit feet = 0.0347 cubic meter.
20. No. of Cement Bags in 1m3 = 7-8 bags.
21. Initial setting time of Cement - 30 minutes.
22. Final setting time of Cement = 10hrs = 600 minutes
23. PH value of the winter should not be less than 6.
24. Riser of staircase - 150mm to 200mm.
25. Tread of staircase 250mm to 300mm.
26. Tensile or Flexural strength of concrete = 0.7-/fck.
27. Modulus of elasticity of concrete = [Ec=5000/fck].
28. Young's modulus of steel = [Es=2x10^5 N/mm2].
29. F.O.S for steel = 1.15.
30. F.O.S for Concrete = 1.5.
31.Standard size of Brick = 190mmx90mmx90 mm =19cmx9cmx9cm.
32. A good brick clay contains 20 to 30% of alumina, 50 to 60% of silica and the remaining constituents are Lime, Magnesia, Sodium, Potassium, Manganese and iron oxide.
33. Colour of good brick is deep red, cherry or copper colored
34. Compressive strength of bricks is 3.5 N/mm2.
35. Maximum water absorption of first class prior is 15% of its dry weight
36. The excess silica of in the clay makes the brick brittle
37. Process of manufacturing of bricks consists of Preparation of brick clay, Moulding bricks, Drying of bricks and Burning of bricks.
38. Moulding of bricks may be hand moulding or
39. The burning of dry bricks is done either in clamp or in a kiln.
40. The ingredients of ordinary cements are Lime, Silica, Alumina, Calcium sulphate, Iron oxide, Magnesia, Sulphur & Alkali's.
41. The ordinary Portland cement consists of 62 to 67% of Lime
42. The initial setting time of OPC should not be less than 30 minutes.
43. The Final setting time ordinary Portland cement of ordinary Portland cement should not be more than 10 hours.
44. Initial and Final setting time of cement is determined by Vicat's apparatus
45. The normal consistency of Portland cement is about 25%.
46. Maximum free fall of concrete allowed to 1.50m.
47. Test On Fresh Concrete
Slump Test -Workability.
Compacting Factor Test







13/06/2025

LUXURY 5 BEDROOM TERRACE DUPLEX FOR SALE :5 bedroom (large masters bedroom with walk-in closet) Terrace Duplex, 2 suspended floors, located in a fully serviced estate at Wuye Abuja. With solar powered water heater & 6 split unit ACs in all the rooms and kitchen.6 Bathrooms & ToiletsPrice: N500m (negotiable)Land size: 524SQMDirect Brief

FortisBuilt Construction Got you Covered, we can make your dream come true
26/05/2025

FortisBuilt Construction Got you Covered, we can make your dream come true

Address

Kano

Website

Alerts

Be the first to know and let us send you an email when FortisBuilt Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to FortisBuilt Construction:

Share