Frontier Integrator

Frontier Integrator Single Source provider for vacuum, fan, blower and compression products, packaging, systems and solu

Two-Stage Recycle Gas Compressor for green diesel generation plant. Design and build by FIMA (www.fima.de)Volume flow: 1...
26/05/2026

Two-Stage Recycle Gas Compressor for green diesel generation plant.

Design and build by FIMA (www.fima.de)

Volume flow: 1662 m3/hr
Pressure Ratio: 1.296
Speed: 26454 RPM
Drive power: 1200 kW
Feature: Suction pressure control; API 617 Part 3

Selamat Hari Raya Haji. Semoga pengorbanan dan keinsafan pada hari ini membawa keberkatan dan kedamaian dalam hidup kita...
26/05/2026

Selamat Hari Raya Haji.
Semoga pengorbanan dan keinsafan pada hari ini membawa keberkatan dan kedamaian dalam hidup kita semua.

Testing & Commissioning + Training for Condenser Evacuation Exhaust Vacuum System in Power Plant.  All systems successfu...
22/05/2026

Testing & Commissioning + Training for Condenser Evacuation Exhaust Vacuum System in Power Plant. All systems successfully commissioned. Guys on the way back to Malaysia

01/05/2026
Final performance test of the 2 stage compressor for Holborn Refinery in Hamburg by FIMA - first Green Diesel project in...
16/04/2026

Final performance test of the 2 stage compressor for Holborn Refinery in Hamburg by FIMA - first Green Diesel project in Europe.

www.fima.de

For similar project inquiry from South East Asia, please do contact us

Contact us for inquiry at alex.chen@frontier-integrator.com  One of the most important machines in an LNG import termina...
27/03/2026

Contact us for inquiry at [email protected]

One of the most important machines in an LNG import terminal is one most people have never heard of.

The Return Gas Blower (RGB).

As LNG import terminals expand worldwide to strengthen energy security, LNG carriers regularly unload cargo into large storage tanks. During this process, v***r displaced from the terminal tanks must be returned safely to the ship to maintain tank pressure and allow continuous unloading.

That’s the job of the RGB:
moving large volumes of low-pressure boil-off gas between the terminal and the LNG carrier.
It’s a relatively low pressure ratio application — but the design philosophy behind the equipment can vary widely.

When developing our RGB solution, we asked a simple question:
What if the application simply doesn’t require the complexity often seen in traditional turbomachinery?

The result is a design focused on simplicity:
• Direct drive — no gearbox
• No external l**e oil system
• VFD speed control instead of mechanical throttling

Fewer systems.
Fewer rotating components.
Less complexity.

Sometimes the most elegant engineering solutions are the ones where you step back and realize:
nothing more is needed.

FIMA Maschinenbau GmbH Recycle Gas CompressorsPolypropylene Application | Oil RefineryWhen a leading polypropylene produ...
25/03/2026

FIMA Maschinenbau GmbH Recycle Gas Compressors
Polypropylene Application | Oil Refinery

When a leading polypropylene producer needed in total six four high-performance recycle gas compressors for a demanding refinery environment, they turned to FIMA.

These machines are built for one of the most critical loops in petrochemical processing — where reliability, precision, and safety are non-negotiable.

Technical Highlights:
Volume Flow: 830 m³/h
Pressure Difference: 10.55 bar
Speed: 16,658 rpm
Drive Power: 355 kW
Standard: API 617 Part 3
Sealing: Tandem Dry Gas Seal

The tandem dry gas seal configuration ensures zero process gas leakage to atmosphere — a critical requirement in polypropylene recycling loops where gas containment directly impacts both safety and process efficiency. API 617 compliance guarantees the highest level of engineering integrity for turbomachinery in petroleum, chemical, and gas industry service.

Two units with six compressors. One standard. Zero compromise.

🌎 Next Turbo Technologies contributing to one of the most modern wastewater treatment plants in the worldIn the district...
25/03/2026

🌎 Next Turbo Technologies contributing to one of the most modern wastewater treatment plants in the world

In the district of São Paulo – Parque Novo Mundo, a next-generation wastewater treatment plant is currently being upgraded as part of the environmental recovery of the Tietê river basin. Once completed, the facility will serve approximately 2.4 million population equivalent (PE), positioning it among the most advanced large-scale WWTPs globally.
We are proud to contribute to this landmark project together with our partner Planalto Group, supporting Sabesp, the water and sanitation company serving the metropolitan region of São Paulo. The aeration system combines both new and existing assets into a unified process-driven architecture:

🔹 4 × GTH-T50 single-stage centrifugal turbocompressors
🔹 Integration with 2 existing KA-66 turbocompressors
🔹 Total airflow of the GTH-T50: < 200,000 m³/h
🔹 Differential pressure: 0.7 bar
🔹 Total installed power: < 6.5 MW
🔹 Fully integrated into an advanced process control strategy

At this scale, aeration is not just air supply, it becomes a dynamic and responsive biological control tool.
The system is designed to continuously adapt airflow to real-time process demand. Within this framework, our GTH units operate as an active control element, ensuring:

• Wide and stable operating range
• High efficiency throughout the whole operating range
• High turndown capability without the need for VFD
• Airflow regulation through variable diffuser vanes
• Fast response to load variations
• Reliable operation with high-voltage motors

This hybrid configuration — combining new and existing turbomachinery — reflects a key evolution in large-scale wastewater treatment: integration, flexibility, and data-driven operation.
We are proud to support one of the most ambitious environmental infrastructure projects in South America.

Wish all our Muslim colleagues, partners, customers, suppliers, friends and families:Selamat Hari Raya Aidilfitri!Maaf Z...
20/03/2026

Wish all our Muslim colleagues, partners, customers, suppliers, friends and families:

Selamat Hari Raya Aidilfitri!
Maaf Zahir Dan Batin

News from our Principal - FIMA Maschinenbau GmbH.Welcome to contact us for inquiry from South East Asia region.www.front...
04/03/2026

News from our Principal - FIMA Maschinenbau GmbH.
Welcome to contact us for inquiry from South East Asia region.
www.frontier-integrator.com

Every ton of fertilizer starts long before it reaches the field 🌱.

Behind global food production is heavy industry — sulphuric acid plants, phosphate processing, and the turbomachinery that keeps them running 24/7.

FIMA recently contributed to a major fertilizer complex by supplying the rotating heart of the Sulphuric Acid Plant (SAP). Two each high-performance main air blowers & auxiliary blowers:

🌀 Main Air Blowers
• 3,725 kW motor power each
• Volume flow: 222.000 m³/h
• pressure rise: 1,509
• Impeller diameter: 1,7 m
• Stainless steel, 3D milled impellers for peak efficiency and reliability
• Hydrodynamic bearings for stable, long-life operation
• In-house designed and fabricated lubrication oil systems

🌀 Auxiliary Blowers
• 920 kW motor power each
• Volume flow: 120.000 m³/h
• Impeller diameter: 1,4 m

Main Air Blowers are mission-critical machines. Their reliability and efficiency directly influence plant availability and ultimately fertilizer output.

From engineering and detailed design through procurement, manufacturing, testing, and documentation, the full scope was executed within 11 months and handed over on schedule following successful performance tests.
Industrial turbomachinery may not be visible in the final product, but it plays a quiet, essential role in feeding a growing world.

For Lucas Baldo, who was responsible for the project on the sales side, it is again a successful project due to great FIMA teamwork. Proud to see another strong reference for FIMA in the fertilizer sector.

Address

17 Jalan Anggerik Mokara 31/51, Kota Kemuning, Seksyen 31
Shah Alam
40460

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Telephone

+60-3-55258503

Alerts

Be the first to know and let us send you an email when Frontier Integrator posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Frontier Integrator:

Share