Ace Rig Move Sdn Bhd

Directions Website Contact the business

Ace Rig Move Sdn Bhd Offshore MODU Jack Up Rig Move
Rig Mover Attendance
Anchor Pattern
Rig Move Procedure

Rig Mover Attendance
Develop Rig Move Procedure
Draw Anchor Pattern in ACAD
Location Feasibility Studies for Jack up

11/10/2026

Arrival of the Rig Mover β€” Rise of the Rig Movers | Episode 1

Welcome to Episode 1 of Rise of the Rig Movers β€” a series about the crew that moves jack-up drilling rigs.

In this episode, the Rig Mover arrives on board the jack-up drilling rig by helicopter. After landing, he goes through the safety briefing and meets the O.I.M. and the Drilling Supervisor for the first time.

From there, the Rig Mover transfers to the main tow vessel via personnel basket for the pre-tow inspection. On board the vessel, he briefs the Captain and the Chief Engineer β€” then walks the deck and engine room with the Chief Engineer to inspect the engines, generators, towing winch, towing pin, and camfork.

This is the first step of a jack-up rig move: the Rig Mover takes command before the tow begins.

βš™οΈ FEATURED IN EPISODE 1:
πŸ”Ή Rig Mover from Ace Rig Move Sdn. Bhd.
πŸ”Ή O.I.M. β€” Offshore Installation Manager
πŸ”Ή Drilling Supervisor β€” Charterer of the Rig
πŸ”Ή Vessel's Captain β€” Main Tow Vessel Master
πŸ”Ή Vessel's Chief Engineer β€” Main Tow Vessel Lead Engineer

πŸ“ EPISODE 1 HIGHLIGHTS:
βœ… Rig Mover arrives by helicopter
βœ… Safety briefing on board the jack-up rig
βœ… Meet and greet with the O.I.M. and Drilling Supervisor
βœ… Personnel basket transfer to the main tow vessel
βœ… Pre-tow briefing with the Captain and Chief Engineer
βœ… Deck and engine room inspection β€” engines, generators, towing winch, towing pin, and camfork

πŸ“Ί ABOUT THE SERIES β€” RISE OF THE RIG MOVERS:
A stylized character series built around the real roles and operations on a jack-up drilling rig move. Each episode follows the crew through the real sequence of a rig move β€” from arrival and inspection to tow and positioning.

πŸ”” SUBSCRIBE for Episode 2 and the rest of the rig move.
πŸ‘ LIKE if you want to see the full pre-tow inspection come together.
πŸ’¬ COMMENT below: Which inspection step matters most β€” the towing winch, the towing pin, or the camfork?

⏱️ TIMESTAMPS:
0:00 β€” Intro: Rise of the Rig Movers
0:20 β€” Rig Mover Arrives by Helicopter
0:50 β€” Safety Briefing On Board
1:20 β€” Meet and Greet: O.I.M. and Drilling Supervisor
1:50 β€” Personnel Basket Transfer to Main Tow Vessel
2:20 β€” Pre-Tow Briefing: Captain and Chief Engineer
2:50 β€” Deck and Engine Room Inspection
3:20 β€” What's Coming in Episode 2

🎨 CREDITS:
Series: Rise of the Rig Movers
Episode 1: Rig Mover Comes On Board
Characters & Concept: Ryan Cheah / Ace Rig Move
Art Style: Vinyl Figure / Designer Toy Aesthetic
Music: Good Starts - Jingle Punks
Created with: Canva / Sesdance 2.5 / CapCut]

πŸ“Œ HASHTAGS:

05/10/2026

Tow Wire Disconnection from Jack-Up Rig | MV Coral βš“οΈ

The preparation is complete β€” now the MV Coral deck crew carry out the tow wire disconnection from the Jack-Up Drilling Rig’s tow bridle.

Using the proper tools and following established safe working practices, the crew carefully release and recover the towing connection on deck.

A controlled operation that requires good teamwork, communication and attention to safety from everyone involved.

Another look at the detailed deck work behind a successful offshore rig move. βš“οΈπŸŒŠ

28/09/2026

I’m a Rig Mover. My superpowers? Jacking. Towing. Manoeuvring. Preloading. ⚑

What if a Rig Mover had superpowers?

In the offshore drilling world, moving a jack-up drilling rig requires experience, precision, coordination and a deep understanding of marine operations.

This AI-generated video brings the Rig Mover to life as a superhero, representing four of the key skills involved in jack-up rig moving operations:

πŸ”Ή Jacking – Raising and lowering the rig hull using the jack-up system
πŸ”Ή Towing – Safely towing the rig between locations
πŸ”Ή Manoeuvring – Precisely positioning the rig at the required location
πŸ”Ή Preloading – Applying controlled loads to establish a stable foundation before operations

Behind every successful rig move is a team of experienced offshore professionals working together with careful planning, communication and safe operating practices.

Rig Moving isn’t just a job. It’s a skill.

βš“ Jack-up Rig | Rig Move | Offshore Drilling | Rig Mover

This video is AI-generated for creative and educational purposes.

26/09/2026

Preparing for Tow Wire Disconnection | MV Coral βš“οΈ

With the tow wire cleaned and recovered, the MV Coral deck crew begin preparing for the next stage β€” disconnecting the tow wire from the Jack-Up Drilling Rig’s tow bridle.

The crew carefully prepare and handle the towing connection on deck as the rig move operation comes to an end.

From towing the rig to safely recovering, cleaning and disconnecting the tow wire, every stage requires good communication, coordination and proper deck operations.

A behind-the-scenes look at the final steps of a jack-up rig move. βš“οΈπŸŒŠ

20/09/2026

Tow Wire Recovery & Freshwater Washdown | MV Coral After Rig Move.

Rig move completed β€” now it’s time to recover and preserve the tow wire.

In this video, MV Coral is seen shortening the tow wire after completion of the rig move. At the same time, the deck crew carry out a freshwater washdown of the tow line to remove saltwater and marine residue.

Proper cleaning and maintenance of the tow wire after each operation helps protect the wire from corrosion and supports its long-term serviceability.

Another important part of offshore towing operations that often happens behind the scenes. βš“οΈπŸŒŠ

10/09/2026

CJ46 Jack Up Rig – Live Jacking Operation | Barge Master at the Jacking Console

A look inside a real jacking operation onboard a CJ46 Jack Up Drilling Rig. βš“οΈ

In this video, you can see the Barge Master operating the jacking console, carefully controlling the rig’s jacking system as the unit is raised/lowered on its legs.

For those who have never seen how a Jack Up Rig is jacked, here’s a glimpse of what happens behind the scenes β€” where precision, experience and close monitoring are essential throughout the operation.

Another day, another operation in the world of Jack Up Rig moving. βš™οΈπŸŒŠ

25/08/2026

Crew washing tow wire

Address

The Capers
Kuala Lumpur
51000

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00

Alerts

Be the first to know and let us send you an email when Ace Rig Move Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Ace Rig Move Sdn Bhd:

Shortcuts

Share