MACSRA ENGINEERING

MACSRA ENGINEERING PROVIDE SERVICE SUPPORT OF INDUCTION FURNACE - MELTING - HEATING AND HEAT TREATMENT MACHINERY

Rezeki dtg tanpa disangka sangka(Sedekah atau doa yang mana diangkat - syukur kepada-NYA)😁
17/10/2025

Rezeki dtg tanpa disangka sangka
(Sedekah atau doa yang mana diangkat - syukur kepada-NYA)
😁

Mentrade@
28/11/2024

Mentrade@

“ SESEKALI DALAM SETAHUN MACSRA ENGINEERING AKAN MELAKUKAN KERJA AMAL DIMANA KEPADA SESIAPA SAHAJA YG MEMERLUKAN  SEBARA...
24/10/2024

“ SESEKALI DALAM SETAHUN MACSRA ENGINEERING AKAN MELAKUKAN KERJA AMAL DIMANA KEPADA SESIAPA SAHAJA YG MEMERLUKAN SEBARANG PEMBAIKAN SISTEM ELEKTRIK DIRUMAH KEDIAMAN SECARA PERCUMA”.
- beri sesuatu kepada komuniti. 012-232 3048
Azli macs.

Bila buka jer terminal motor niTeringat first motor dulu (25thn)Workshop arwah abg kimi- dia beli water pump motor utk b...
06/08/2024

Bila buka jer terminal motor ni
Teringat first motor dulu (25thn)
Workshop arwah abg kimi- dia beli water pump motor utk basuh kereta. Masa tu pengalaman zero …😭 bayangkan utk pasang DOL pon x tahu. Apa lagi nak tukar rotation nak setup overload relay 😅. Tapi bila berjaya pasang dan keluar air laju utk basuh kereta….masih terbayang wajah keceriaan abg kimi pada masa itu.
Moral of the story: (my POV)
Bila sudah terbang di awan…
Jangan lupakan rumput di tanah…

17/07/2024

100kg iron melting
16/7/2024

Job weldone!!!350kw 3.2khz 100kg & 500kg box furnaceICB 103 (1975) american unitHalf bridge unit
17/07/2024

Job weldone!!!
350kw 3.2khz 100kg & 500kg box furnace
ICB 103 (1975) american unit
Half bridge unit

11/07/2024

ALHAMDULILLAH….
Ada potential job.
Lama sungguh menganggur!

Upcoming project:3000kw 5T steel shell VIPPneuwmatic changeover switch replacement.
22/01/2024

Upcoming project:
3000kw 5T steel shell VIP
Pneuwmatic changeover switch replacement.

14/11/2023
14/11/2023

Missing wooden clamp
Polarised wcl and buffer stanction

3000kw VIP 400hz 2 power pack with 3 5T steel shell furnace.Preventative maintenance.
14/11/2023

3000kw VIP 400hz 2 power pack with 3 5T steel shell furnace.
Preventative maintenance.

Address

No 2, Lorong Makmur 4, Bdr Tun Razak Cheras
Kuala Lumpur
56000

Opening Hours

Monday 09:00 - 17:00
Tuesday 09:00 - 17:00
Wednesday 09:00 - 17:00
Thursday 09:00 - 17:00
Friday 09:00 - 17:00
Saturday 09:00 - 17:00
Sunday 09:00 - 17:00

Telephone

+60122323048

Website

Alerts

Be the first to know and let us send you an email when MACSRA ENGINEERING posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to MACSRA ENGINEERING:

Share