Sheng Jian Engineering & Construction Sdn Bhd

Sheng Jian Engineering & Construction Sdn Bhd Trusted by Malaysia's industries for more than two decades. The engineering partner you can rely on.

Sheng Jian Engineering & Construction Sdn Bhd (Company No. 200301008291 / 610711-H) is a premier Malaysian engineering solutions provider established in 2000 in Ipoh. With over 20 years of expertise and 900+ completed projects, we deliver innovative steel fabrication and comprehensive engineering solutions that meet the highest standards of quality and reliability. Our commitment to Industry 4.0,

sustainable engineering, and alignment with Malaysia’s Shared Prosperity Vision 2030 drives us to exceed every project demand. Our core services include:

· Structural Steel Fabrication
· Bulk Material Handling Systems
· Storage Tanks & Tank Farms
· Industrial Construction & Factory Building
· Piping Fabrication & Installation
· Industrial Project Management
· And More – Tailored solutions to address your unique engineering and fabrication needs.

Sheng Jian Engineering & Construction proudly honours the hard work, dedication, and resilience of all workers who conti...
01/05/2026

Sheng Jian Engineering & Construction proudly honours the hard work, dedication, and resilience of all workers who continue to build progress and strengthen the nation.

Your effort drives growth, progress, and every achievement.

Happy Labour Day.

𝐒𝐞𝐥𝐚𝐦𝐚𝐭 𝐇𝐚𝐫𝐢 𝐑𝐚𝐲𝐚 𝐀𝐢𝐝𝐢𝐥𝐟𝐢𝐭𝐫𝐢 🌙✨As we build stronger foundations in our work, we also value the bonds we share with our c...
23/03/2026

𝐒𝐞𝐥𝐚𝐦𝐚𝐭 𝐇𝐚𝐫𝐢 𝐑𝐚𝐲𝐚 𝐀𝐢𝐝𝐢𝐥𝐟𝐢𝐭𝐫𝐢 🌙✨

As we build stronger foundations in our work, we also value the bonds we share with our clients, partners, and team. May this festive season bring renewed strength, unity, and success to all.

— Sheng Jian Engineering & Construction Sdn Bhd

Maaf Zahir & Batin

𝐇𝐚𝐩𝐩𝐲 𝐂𝐡𝐢𝐧𝐞𝐬𝐞 𝐍𝐞𝐰 𝐘𝐞𝐚𝐫 𝟐𝟎𝟐𝟔 🧧Wishing our clients, partners, and team prosperity, success, and good health in the Year of...
16/02/2026

𝐇𝐚𝐩𝐩𝐲 𝐂𝐡𝐢𝐧𝐞𝐬𝐞 𝐍𝐞𝐰 𝐘𝐞𝐚𝐫 𝟐𝟎𝟐𝟔 🧧

Wishing our clients, partners, and team prosperity, success, and good health in the Year of the Horse.

Thank you for your continued trust and support.

— Sheng Jian Engineering & Construction Sdn. Bhd.

𝐇𝐀𝐏𝐏𝐘 𝐍𝐄𝐖 𝐘𝐄𝐀𝐑!As we welcome the New Year, Sheng Jian Engineering & Construction moves forward with renewed determinatio...
31/12/2025

𝐇𝐀𝐏𝐏𝐘 𝐍𝐄𝐖 𝐘𝐄𝐀𝐑!

As we welcome the New Year, Sheng Jian Engineering & Construction moves forward with renewed determination and focus.

The past year has been a journey of progress and learning, made possible through strong partnerships and the dedication of our team. In the year ahead, we remain committed to delivering engineering and construction solutions with high standards of quality, safety, and professionalism.

Wishing everyone a successful, safe, and prosperous New Year.

𝐌𝐄𝐑𝐑𝐘 𝐂𝐇𝐑𝐈𝐒𝐓𝐌𝐀𝐒!As we celebrate this festive season, Sheng Jian Engineering & Construction would like to express our sin...
26/12/2025

𝐌𝐄𝐑𝐑𝐘 𝐂𝐇𝐑𝐈𝐒𝐓𝐌𝐀𝐒!

As we celebrate this festive season, Sheng Jian Engineering & Construction would like to express our sincere appreciation to our clients, partners, and team members for their continued trust and support.

Christmas is a time to reflect on the importance of collaboration, commitment, and strong foundations — values that guide us in every engineering and construction project we undertake. Together, we continue to build safe, reliable, and quality-driven solutions.

We wish everyone a joyful and peaceful Christmas filled with warmth and happiness.
– Sheng Jian Engineering & Construction

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌Once the curved segments are formed, we move into tack welding and pre-assemb...
10/12/2025

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌

Once the curved segments are formed, we move into tack welding and pre-assembly. This initial welding locks each piece into the correct position before full structural welding begins.

A precise tack fit-up ensures airtight sealing, accurate filter bag spacing and proper dust movement during operation. Small shifts in alignment at this stage can affect suction efficiency and long-term durability of the collector.

Before final welding, our team controls root gap, applies bracing and inspects every joint to preserve geometry. This ensures the dust collector remains stable under continuous negative pressure once installed on-site.

🔜 Next: Full welding and structural reinforcement.

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌With material preparation complete, we now forms the main body and hopper of ...
08/12/2025

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌

With material preparation complete, we now forms the main body and hopper of the dust collector through controlled rolling. The flat plates are shaped into cylindrical shells and tapered cones that manage airflow and dust discharge.

Correct rolling determines how smoothly the unit performs. A precise curvature allows stable suction, prevents dust blockage, and keeps the structure stable when operating under continuous negative pressure.

To achieve this, our team performs multi-pass rolling with radius checks and applies temporary bracing to maintain shape. Each piece is inspected for dimensional accuracy before it enters assembly and welding.

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌We continue our fabrication journey with circular plate cutting using an oxy-...
06/12/2025

𝐎𝐍-𝐆𝐎𝐈𝐍𝐆 𝐅𝐀𝐁𝐑𝐈𝐂𝐀𝐓𝐈𝐎𝐍: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌

We continue our fabrication journey with circular plate cutting using an oxy-fuel cutting machine. These steel rounds and reinforcing rings form the top and bottom interfaces of the dust collector — including the hopper discharge, tube sheet joints, and mounting flanges.

Accurate circular cutting is crucial to ensure airtight suction, structural strength, and smooth dust movement through the system. Any deviation in shape can affect airflow performance, cause leakage, or reduce filtration efficiency, especially under continuous negative pressure operations.

To achieve precision, all plates undergo dimensional marking, flame-guided cutting, hole preparation, and edge machining according to fabrication drawings. By controlling tolerance, bevel angles, and fit-up quality at this early stage, we build reliability from the very first cut.

Be with us as we move into steel forming and rolling — where flat plates take shape into curved components.

🌟 𝐖𝐈𝐒𝐇𝐈𝐍𝐆 𝐘𝐎𝐔 𝐀 𝐁𝐑𝐈𝐆𝐇𝐓 𝐀𝐍𝐃 𝐏𝐑𝐎𝐒𝐏𝐄𝐑𝐎𝐔𝐒 𝐃𝐄𝐄𝐏𝐀𝐕𝐀𝐋𝐈 🌟As the lights of Deepavali shine across Malaysia, SJEC Engineering & Co...
20/10/2025

🌟 𝐖𝐈𝐒𝐇𝐈𝐍𝐆 𝐘𝐎𝐔 𝐀 𝐁𝐑𝐈𝐆𝐇𝐓 𝐀𝐍𝐃 𝐏𝐑𝐎𝐒𝐏𝐄𝐑𝐎𝐔𝐒 𝐃𝐄𝐄𝐏𝐀𝐕𝐀𝐋𝐈 🌟

As the lights of Deepavali shine across Malaysia, SJEC Engineering & Construction Sdn. Bhd. celebrates the spirit of illumination — symbolizing hope, strength, and progress.

Just as we forge steel with precision and passion, may this Festival of Lights inspire everyone to build brighter futures, stronger foundations, and lasting connections.

✨ From all of us at SJEC Engineering, we wish you a Happy Deepavali 2025 filled with happiness, prosperity, and success in every project and path ahead. ✨

🌕✨ 𝐇𝐚𝐩𝐩𝐲 𝐌𝐢𝐝-𝐀𝐮𝐭𝐮𝐦𝐧 𝐅𝐞𝐬𝐭𝐢𝐯𝐚𝐥!As the full moon rises high, may it bring reunion, harmony, and gratitude to you and your l...
06/10/2025

🌕✨ 𝐇𝐚𝐩𝐩𝐲 𝐌𝐢𝐝-𝐀𝐮𝐭𝐮𝐦𝐧 𝐅𝐞𝐬𝐭𝐢𝐯𝐚𝐥!

As the full moon rises high, may it bring reunion, harmony, and gratitude to you and your loved ones. Let’s share mooncakes, light lanterns, and celebrate the beauty of tradition beneath the glowing night sky.

From all of us at Sheng Jian Engineering & Construction, wishing you joy, togetherness, and bright blessings this Mid-Autumn. 🏮💛

𝐍𝐄𝐖 𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐀𝐍𝐍𝐎𝐔𝐍𝐂𝐄𝐌𝐄𝐍𝐓: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌We are proud to begin work on a new project — the fabrication and install...
19/09/2025

𝐍𝐄𝐖 𝐏𝐑𝐎𝐉𝐄𝐂𝐓 𝐀𝐍𝐍𝐎𝐔𝐍𝐂𝐄𝐌𝐄𝐍𝐓: 𝐃𝐔𝐒𝐓 𝐂𝐎𝐋𝐋𝐄𝐂𝐓𝐎𝐑 𝐒𝐘𝐒𝐓𝐄𝐌

We are proud to begin work on a new project — the fabrication and installation of two industrial dust collector systems, each designed for high-capacity air extraction and filtration to support continuous plant operations.

A dust collector is a key part of air pollution control, capturing dust with filter bags and returning clean air to the environment. With steel shells, conical hoppers, service platforms, centrifugal fans, and jumbo bag clamp systems, this project will deliver reliable performance for industries such as cement, steel, and bulk material handling.

Our journey starts with raw material preparation — plate measuring and cutting — the first step in transforming steel into a complete industrial dust collection system. Be with us as we share each stage of this engineering journey.

🌙 𝐒𝐚𝐥𝐚𝐦 𝐌𝐚𝐮𝐥𝐢𝐝𝐮𝐫 𝐑𝐚𝐬𝐮𝐥 𝟏𝟒𝟒𝟕𝐇 On this blessed occasion, we honor the birth of Prophet Muhammad ﷺ, whose teachings of comp...
05/09/2025

🌙 𝐒𝐚𝐥𝐚𝐦 𝐌𝐚𝐮𝐥𝐢𝐝𝐮𝐫 𝐑𝐚𝐬𝐮𝐥 𝟏𝟒𝟒𝟕𝐇

On this blessed occasion, we honor the birth of Prophet Muhammad ﷺ, whose teachings of compassion, integrity, and unity continue to inspire generations.

✨ Sheng Jian Engineering & Construction (SJEC) extends our sincere wishes of peace, unity, and prosperity to all our colleagues, clients, and partners. ✨

Address

53A, Tasek Mutiara 1, Taman Tasek Jaya
Ipoh
31400

Opening Hours

Monday 08:00 - 17:00
Tuesday 08:00 - 17:00
Wednesday 08:00 - 17:00
Thursday 08:00 - 17:00
Friday 08:00 - 17:00
Saturday 08:00 - 17:00

Telephone

+60125966228

Alerts

Be the first to know and let us send you an email when Sheng Jian Engineering & Construction Sdn Bhd posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Sheng Jian Engineering & Construction Sdn Bhd:

Share