Bitola - Kremenica Project Construction works for renewal with reconstruction of the railway section Bitola-Kremenica, as part of Xd of Corridor X

The length of the single track non electrified railway line is app17 km.Along the route, beside earth works on cuts and embankments with increasing the bearing capacity,10 level crossings in this section will be converted into secured level crossings; 6 existing bridges to be demolished and constructed anew; 3 existing bridges to be demolished and replaced with culverts; belonging signalling and t

elecommunication and ERTMS (level 1), construction of one station at Zabeni and one halt at Kravari including track alignment (sidings). The rehabilitation of the existing single track non electrified railway line, section Bitola – Kremenica, shall be performed through a standard procedure such as: setting out alignment and structures including transfer design data from the Detailed Design onto the site, carrying out specific reference stakes for an operative control network, destruction of existing bridges and culverts and build new bridges and culverts, improve the bearing capacity of the embankment, replacement of existing ballast layers by new ballast, replacement of existing sleepers by concrete sleepers, replacement of existing fastening rigid K-system by elastic fastening system, replacement of existing rails by new rails, setting of new turnouts and signalisation, reconstruction of level crossings, welding of rails in CWR tracks, mechanical lining and stabilisation of track, setting up track markers/signs and furniture, drainage cleaning, improvement of drainage system and system for slopes stability, construction of a new station Zabeni.

Waiting for the train....
11/04/2019

Waiting for the train....

27/03/2019

Automatic barrier on level crossing 10 - Kremenica

Zabeni station - signals in function.
27/03/2019

Zabeni station - signals in function.

16/01/2019

Everything in white!

With special thanks for support to the Delegation of the European Union from Skopje!  #ЕУзаТЕБЕ
08/12/2018

With special thanks for support to the Delegation of the European Union from Skopje! #ЕУзаТЕБЕ

On the end of the day - Acces road to Kravari Halt Station
10/11/2018

On the end of the day - Acces road to Kravari Halt Station

09/10/2018
24/09/2018

Tamping machine.

Railways works
18/09/2018

Railways works

14/08/2018

Address

Bursa Street

7000

Opening Hours

Monday 08:00 - 15:00
Tuesday 08:00 - 15:00
Wednesday 08:00 - 15:00
Thursday 08:00 - 15:00
Friday 08:00 - 15:00
Saturday 07:00 - 20:00

Website

Alerts

Be the first to know and let us send you an email when Bitola - Kremenica Project posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

  • Want your business to be the top-listed Equipment Service?

Share