Oracle Engineers

Oracle Engineers MULTIDISCIPLINARY ENGINEERING CONSULTING AND CONSTRUCTION SERVICE PROVIDER

18/04/2026

Simple lesson on Sludge Drying Beds. In addition to the video below, there are a few important factors to consider: sludge loading, sludge drying bed area, filter media (Sand , Metal ) its thickness, and particle size , Plant location and weather condition etc
# waste water treatment ,
# Environment protection

Groundwater contains many dissolved and suspended components depending on geological conditions. Silica (Colloidal silic...
26/03/2026

Groundwater contains many dissolved and suspended components depending on geological conditions. Silica (Colloidal silica, Reactive silica), calcium, and magnesium are present in certain areas and can form strong deposits inside pipes. These deposits reduce water flow rate, increase pressure, decrease heat transfer efficiency, and may lead to pump failures, Boiler, and hot water pipes failures etc. Therefore, it is recommended to treat the water to the required quality level according to its application in order to minimize these problems.

I have attached a cross-sectional view of a pipe with silica deposits.

If you have any water waste / water treatment, please contact Oracle Engineers

25/11/2025

Black smoke coming from a boiler chimney means the fuel is not burning properly.
This causes mainly:

1.Fuel waste

2.More money spent

3.More pollution

4.Low boiler efficiency

A good boiler should have clean, light smoke or almost no smoke at all.
Cleaner combustion = less fuel, more savings, better performance

This is oil fired boiler chimney. Therefore it is necessary to clean fuel lines,strsiners, filters ,tanks etc regularly.



04/11/2025

Sliding door fabrication , when we doing fabrication works, it is necessary to give more attention to fabricate door end stopper for the safe working. If end stopper not fabricate,door will fall down on door operator and make huge damage.

Project-Reparing and cleaning works of Syrup waste line✡️Regular cleaning and maintence will help to avoid backups and f...
13/01/2025

Project-Reparing and cleaning works of Syrup waste line
✡️Regular cleaning and maintence will help to avoid backups and floodings
✡️Improve Hygine and Health
✡️Reduces Unpleasant Odors
✡️Improves water flow and reliability of plumbing system etc

01/01/2025
Conducting a safety and health workshop✡️Regular safety training and education for employees✡️a safety culture within th...
24/10/2024

Conducting a safety and health workshop
✡️Regular safety training and education for employees
✡️a safety culture within the organization.
✡️Develop safety guidlines according to the organization scale etc

will help to prevent losses and damages to properties and human resources

Project-Plumbing Works and fixture installation in office building wash rooms Tile Work-Third party contractor✡️We have ...
31/08/2024

Project-Plumbing Works and fixture installation in office building wash rooms
Tile Work-Third party contractor
✡️We have added few fixture installation guidline, correct fixture levels and distance make you more comfotable
✡️Water Proofing ,Line pressure testing make your system more reliable
✡️Correct water supply line and dranage line sizes, Alonge with appropriate water supply pressure will prevent headache

If you have any requirements, we can design and build a proper water supply and drainage system, including loading, discharge units, line sizes, head loss, layout drawings, and required water pressure and head.

Project-Waste water treatment plant renovation project of textile washing plant✡️Maintaining the correct slope is crucia...
16/07/2024

Project-Waste water treatment plant renovation project of textile washing plant
✡️Maintaining the correct slope is crucial to prevent chemical coagulation and solid particle accumulation in the pipe.
✡️Properly treating water before it is delivered to the environment is essential.
🔯We specialize in water and waste water treatment plant designing, Installation , Providing Services ,Supplying chemicals ,Suppling pumps and more.

Air Blower discharge line installation of Sewage Treatment PlantSufficient air supply is required for aerobic digestion ...
02/06/2024

Air Blower discharge line installation of Sewage Treatment Plant

Sufficient air supply is required for aerobic digestion in aeration tank of waste water treatment plant. We are designing ,installation /consulting waste water treatment plants according to effluent characteristics and required treated water quality.If you have any requirements,please contact us.

Address

48 A, Pahalagama
Eheliyagoda
70600

Telephone

+94713345789

Website

Alerts

Be the first to know and let us send you an email when Oracle Engineers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Oracle Engineers:

Share