Bio GRP Water Tank

Bio GRP Water Tank Our company was established in 1991 and has been extending our business till now. We are one of the leading companies in Korea.

We have 7 factories for our products and we established one factory in Vietnam in 2019 as well.

Assembly of side panel blockThe assembly procedure is basically the same as that of the bottom panel block, except for t...
20/08/2020

Assembly of side panel block

The assembly procedure is basically the same as that of the bottom panel block, except for the following points.
1. Side panel blocks are equipped with unit panel reinforcing angles and reinforcing plates.
2. Side panel blocks consist of two different types of panels, one type for each tier as shown picture.

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Bio GRP sectional panel water tankInstallation Process1. Check Concrete Foundation2. Check Steel Skid Base3. Assembly of...
19/08/2020

Bio GRP sectional panel water tank

Installation Process
1. Check Concrete Foundation
2. Check Steel Skid Base
3. Assembly of Bottom Panel Block
4. Setting of Bottom Panel block onto Steel Skid Base
5. Assembly of Side Panel Block
6. Assembly of Roof Panel Block
7. Installation of Roof Panel Block Support Pole
8. Installation of Internal Ladder
9. Nozzle Installation
10. Installation of External Ladder
11. Installation of Anchor Bolts
12. Cleaning in and out of the Water-Tank

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Assembly of Bottom panel blockBottom Panel Block AssemblySequence and Procedure1) Attached the sealing tape to the fl**g...
18/08/2020

Assembly of Bottom panel block

Bottom Panel Block Assembly
Sequence and Procedure
1) Attached the sealing tape to the fl**ge for all of the bottom panel.

2) Method to Apply Tapes
a) The sealing tape should be applied to all assembled fl**ge surfaces.
b) The centre side of the sealing tape should be overlapped by about 50mm (as shown in the below photo )

3) To assemble a bottom panel block, fIrst connect several bottom panels into a sub-block. Determine the block size according to the site condition, the work space, number of workers, use or non-use of a crane, etc.
A block that is too large cause difficulty in relocation and other work. Therefore, it is recommended that one block be limited to 10 panels x 2rows.

4) Arrangement and type of bottom panels.
Place bottom panels one by one upside (as shown in Fig. 2).
When installing a drain nozzle, place a pit panel in the pre-determined position.

5) Assembly of Drain Panel
Using a hole saw(for a small bore),and a jigsaw(for large bore), the required holes may be cut into panels.

6) Assembly of sub-blocks is done by connecting panels in one direction only.

7) All bolts/nuts for connecting bottom panels shall be M10 X 50 ℓ. As for 8 Bolts/nuts are used fo a 1m length side and 4 are used for 0.5m length side of a panel.

8) Perforate a hole using a fixture

9) For bolt / nut tightening sequence : First tighten the 3th bolt/nut from each end of the fl**ge. Then tighten 4th, 5th,6th, and 1st,8th. Lastly the 2nd, 7th bolts/nuts.

10) Adjusting by levering the tapered bars horozontally and vertically.

11) Assemble one more sub-block using the same procedure as above.

12) Connect together two assembled sub-blocks into one complete 10-panel bottom block.

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Check steel skid baseBasic structure of steel footing is the cross-hatched type. A) Standard of Steel Skid Per HeightB) ...
14/08/2020

Check steel skid base

Basic structure of steel footing is the cross-hatched type.
A) Standard of Steel Skid Per Height
B) Assembling for Steel Skid
1) All bolts/nuts for connecting steel skid shall be M14 X 40 ℓ. 2) Joint Angle( or Channel) at intervals of 1M using base frame
3) Put Angle(or Channel) on base PAD and joint using ㄱtype Bracket (7575Z)

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Check Concrete FoundationConcrete Foundation is extremely important to ensure the safety of the tank. Customers should c...
28/07/2020

Check Concrete Foundation

Concrete Foundation is extremely important to ensure the safety of the tank. Customers should construct a concrete base according to the design specification and the firmness of the site.

Standard of Concrete Foundation
1) The required strength of the base concrete must be at least 180kg/cm²
2) Width of concrete foundation is more than 300mm.
3) Height of concrete foundationis 500mm.
※ 3M X 4M X 3M/Height

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Installation of Internal Ladder Install the internal ladder and poles from the tank interior,after the connection of the...
27/07/2020

Installation of Internal Ladder
Install the internal ladder and poles from the tank interior,
after the connection of the roof panel block to side panel blocks.
It is advisable to carry the internal ladder and poles into the tank before connecting the roof panel to the side panel block. Material is GRP

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Installation of External Ladder1) The external ladder has support arms, which are bolted to the side panel and bottom pa...
24/07/2020

Installation of External Ladder

1) The external ladder has support arms, which are bolted to the side panel and bottom panel fl**ges with the bolts and nuts.
2) Material is HDG (Hot Dipped Galvanized)

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Panel Quantity FormulaFor example6mW * 7mL * 2mH84 Ton (22193 Gallon) => 136㎡Wall panel D grade (1m * 2m) : 26 unitRoof ...
22/07/2020

Panel Quantity Formula
For example
6mW * 7mL * 2mH
84 Ton (22193 Gallon) => 136㎡

Wall panel D grade (1m * 2m) : 26 unit
Roof panel E grade (1m * 1m) : 41 unit
Manhole Φ780 (1m * 1m) : 1 unit
Bottom panel D grade (1m * 1m) : 41 unit
Drainage panel C grade (1m * 1m) : 1 unit

So we can make the Formula
X mW * Y mL * Z mH
If Z height is 1m, 1,5m, 2m,
Wall panel (1m * Z m) : 2(X + Y) unit
Roof panel (1m * 1 m) : (X x Y) - 1 unit
Manhole (1m * 1m) : 1 unit
Bottom panel (1m * 1m) : (X x Y) - 1 unit
Drainage panel (1m * 1m) : 1 unit

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Accessory Quantity for the tank sizeSteel Skid (A) 1,140mm Steel Skid (A) 990mm Steel Skid (A) 2,120mm Steel Skid (A) 1,...
21/07/2020

Accessory Quantity for the tank size

Steel Skid (A) 1,140mm
Steel Skid (A) 990mm
Steel Skid (A) 2,120mm
Steel Skid (A) 1,570mm
Steel Skid (A) 1,990mm
Steel Skid (B) 957mm
Steel Skid (B) 994mm
Steel Skid (B) 1063mm
Steel Skid Joint 75*75
Steel Skid Joint 75*125
Steel Skid Bolt/Nut/Washer M14*45ℓ GI
Steel Skid & Panel Joint Bolt M12*40ℓ GI
Anchor Bolt

Reinforcing Angle (55*950mm*3T)
Reinforcing Angle (55*1,200mm*4T)

External Ladder(HDG)
Internal Ladder(GRP)

PVC Roof Support Pipe 1m-2"Dia
PVC Roof Support Pipe 1.5m-2"Dia
PVC Roof Support Pipe 2m-2"Dia

Coner Angle 1m - GI
Coner Angle 1.5m - GI
Coner Angle 2m - GI
Coner Angle Bolt/Nut/Washer M10*35ℓ
Sealant 120mm (Coner)- 1m
Sealant 120mm (Coner) - 1.5m
Sealant 120mm (Coner)- 2m

Roof Panel Bolt M10*35ℓ - SS
Side Panel Bolt M10*50ℓ - SS
Bottom Panel Bolt M10*50ℓ - GI

Tie rods ( Ø10.7 * 1,880mm )
Tie rods ( Ø10.7 * 2,880mm )
Rubber Capped Bolt Set M14*120ℓ
Nut M12 - SS
Plane Washer M12 - SS
Spring Washer - SS

For example(Picture2)
2.5mW * 4mL * 2mH

Main Frame 2640 AL 2 unit
Main Frame 1990 AL 8 unit
Sub Frame 957 DCL 6 unit
Sub Frame 563 DCL 3 unit
Sub Frame 7575 Z 8 unit
Corner Frame 2000L 4 unit
Ex Ladder 2000H 1 unit
In Ladder 2000G 1 unit
Internal/ External reinforcement
1205 Z 10 unit
955 ZP 12 unit
455 ZP 2 unit
Tie rods bracket 1760 SL 10 unit
Tie rods bracket 1610 Z 10 unit

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Panel Quantity for the tank sizeFor example(Picture 3)2.5mW * 4mL * 2mH20 Ton (5284 Gallon) => 46㎡Wall panel (1m * 2m) :...
20/07/2020

Panel Quantity for the tank size

For example(Picture 3)
2.5mW * 4mL * 2mH
20 Ton (5284 Gallon) => 46㎡

Wall panel (1m * 2m) : 12 unit
Wall panel (0.5m * 2m) : 2 unit
Roof panel (1m * 1m) : 7 unit
Roof panel (0.5m * 1m) : 4 unit
Manhole (1m * 1m) : 1 unit
Bottom panel (1m * 1m) : 7 unit
Bottom panel (0.5m * 1m) : 4 unit
Drainage panel (1m * 1m) : 1 unit

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Water tank view and Parts namePanel Name1. Side panel(1m x 2m)2. Side panel(1m x 1m)3. Manhole(Φ750)4. Roof panel5. Fl**...
17/07/2020

Water tank view and Parts name

Panel Name
1. Side panel(1m x 2m)
2. Side panel(1m x 1m)
3. Manhole(Φ750)
4. Roof panel
5. Fl**ge panel
6. Bottom panel
7. Drainage panel
8. Partition panel

Parts Name
a. Concrete Foundation
b. Steel skid
c. Drainage
d. Outlet
e. Corner flame
f. Over flow
g. Air vantilator
h. External ladder
i. Internal ladder
j. Inlet
k. Reinforcing angle
l. Outer bracket
m. Plate bar
n. Inner Backet
o. Tie rods

DAEJOO ENG. CO.,LTD​
Sky Seo (Managing Director)
Website : www.daejoosmc.com
Blog1 : grp-water-tank.blogspot.com
Blog2 : blog.naver.com/biotank420
E-mail : [email protected]
Managing Director's Mobile / Whatsapp : +82-10-2758-7147
General Manager's Mobile / Whatsapp : +82-10-7741-8555

Recommendations for preventingnovel coronavirus infection[Recommendations for preventing infectious diseases]✔Wash your ...
10/07/2020

Recommendations for preventing
novel coronavirus infection

[Recommendations for preventing infectious diseases]

✔Wash your hands with soap and running water
✔Cover your mouth with your sleeve when coughing!
✔If you experience respiratory symptoms such as cough, must wear a mask
✔Inform medical staffs of your travel history when visiting selected clinics
✔Consult with your local public health center or call‘1339’ or ‘Area Code +120’
if you are suspicious of contract an infectious disease

[Recommendations when travelling]

✔Do not touch animals
✔Avoid visiting to local markets and health facilities
✔Do not contact with people who have a fever or respiratory symptoms
✔ Comply with personal hygiene recommendations
✔Report the health questionnaire upon arrival, after travelling
✔If you have fever and respiratory symptoms (coughing, sore throat, etc.)
after returning home, please consult with local center or call 1339 or area code +120

Source Notation
Korean Centers for Disease Control (KCDC)
www.cdc.go.kr

Address

302, 7, Sincheoncheondong-ro
Siheung
14949

Opening Hours

Monday 09:00 - 18:00
Tuesday 09:00 - 18:00
Wednesday 09:00 - 18:00
Thursday 09:00 - 18:00
Friday 09:00 - 18:00
Saturday 09:00 - 18:00

Telephone

+82313145140

Alerts

Be the first to know and let us send you an email when Bio GRP Water Tank posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Bio GRP Water Tank:

Share