Niece Enterprises

Niece Enterprises Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from Niece Enterprises, Engineering service, MLOLONGO TOWN , MUSAU Road, Nairobi.

Water and Energy solutions
✓Power analysis
✓Electrical switchboard
✓Generator ,air conditioning and compressor installation
✓Solar PV and solar water heating system
✓Water /chemi
✓Hydrogeological survey
✓Borehole drilling
✓pump testing
✓Borehole equiping

200L Solar Water heating system successfully commissioned at ukunda beach
12/05/2024

200L Solar Water heating system successfully commissioned at ukunda beach

30/04/2024
31/03/2024

Energy is our priority, we power industries call 0739944746

We call you when hot contact 0739944746
28/03/2024

We call you when hot contact 0739944746

For water treatment solution call 0739944746
24/03/2024

For water treatment solution call 0739944746

11/03/2024

For borehole inspection camera available call 0739944746

Successfully commissioned 5.5kw borehole pump at embu county
10/03/2024

Successfully commissioned 5.5kw borehole pump at embu county

We have just commissioned 5kwh solar PV system at utawala call for yours today
20/02/2024

We have just commissioned 5kwh solar PV system at utawala call for yours today

Tuko site
13/02/2024

Tuko site

On going 2.2kwh Borehole solarization at juja farm
12/02/2024

On going 2.2kwh Borehole solarization at juja farm

Niece enterprises Ltd registered Company breaks down the drilling processTHE PROCESS OF BOREHOLE DRILLING.STEP 1: HYDROG...
11/02/2024

Niece enterprises Ltd registered Company breaks down the drilling process

THE PROCESS OF BOREHOLE DRILLING.

STEP 1: HYDROGEOLOGICAL/ GEOPHYSICAL SURVEY:
We employ both Digital and Old methods.
This gives;
✔Borehole depth,
✓ Expected yield
✔Expected Water Quality
TIMELINE: Exercise 1 day, Report 3 Days

STEP 2: DRILLING APPROVALS AND PERMITS:
The necessary approvals includes; ✓Environmental Impact Assessment (EIA) for NEMA license.
✔Water Resources Authority (WRA) approval. ✔Water Resources Users Association (WRUA) ✓ Letter of No Objection from the local water provider
✓ County Approvals
TIMELINE: within one month

STEP 3: BOREHOLE DRILLING:
The total cost will be calculated based on the recommendations from the Hydrogeological survey results. This includes;
✓Drilling
✓ Gravels
✓Casing
✓Development
TIMELINE: 5 Days

STEP 4: PUMP TESTING:
Aims to determine the optimum rate at which a borehole should be pumped and yield
TIMELINE: 24 hours

STEP 5: BOREHOLE EQUIPPING AND PUMP INSTALLATION.
This involves installation of submersible pump & motor.
✓pipes
✓ submersible cables,
✓ control panel,
✔Inverter and solar panels (if solar powered).
TIMELINE: For Electricity 1 Days and 3 days for Solar

With availability of resources a borehole can be used within 10 Working days.
Call/Whatsapp for any further clarifications.+254739944746/0707586314

Address

MLOLONGO TOWN , MUSAU Road
Nairobi
MOMBASAROAD

Website

Alerts

Be the first to know and let us send you an email when Niece Enterprises posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Niece Enterprises:

Share