11/02/2026
We are currently in the initial phase of developing a proposed Logistics Park.
Our scope covers:
-Structural Analysis & Design of the Warehouse Steel Mainframe
-Drawings Detailing, Material Optimization & Task Scheduling
-On-site Fabrication, Surface Treatment, Steel Mainframe Er****on & Roofing
We will provide you with updates as the project advances.
👷🏿♂️