Complete overhaul (Overhaul of gas system and crank mechanism) of a Nitrogen compressor.
1) Removal/installation from/onto the skid
2) Detailed disassembly/assembly of the gas section and crank mechanism
3) Thorough cleaning of all parts
4) Dimensional measurements
5) Issuance of machine data sheet
6) Replacement of spare parts
7) Overhaul of suction/discharge valves
8 ) Overhaul of sealing assemblies
9) Overhaul of oil scraper assemblies
10) Replacement of electric motor pulley
11) Reinstallation of the compressor onto the skid at the plant site
12) Functional testing during operation